Difference between revisions of "Housing and Innovation in Revit (HIR)"

From EG1004 Lab Manual
Jump to: navigation, search
(JB, not JAB)
Line 1: Line 1:
{{SLDP: RFP|Housing & Innovation in Revit (HIR)}}
{{SLDP: RFP|Housing & Innovation in Revit }}


= Introduction and Overview =
= Introduction and Overview =
As Brooklyn establishes itself as a technology and innovation hub, projects to modernize Downtown Brooklyn and the MetroTech area are being set into motion regularly. New York University (NYU) plans to expand its Brooklyn campus to reflect its consistent desire to foster innovation, engineering, and a successful college experience. To that effect, NYU has requested that your organization create a unique design for the reconstruction of the Jacobs Administration Building (JB, not JAB) at the Tandon School of Engineering.
As Brooklyn establishes itself as a technology and innovation hub, projects to modernize Downtown Brooklyn and the MetroTech area are being set into motion. New York University (NYU) plans to expand its Brooklyn campus to reflect its desire to foster innovation, engineering, and a successful college experience. To that effect, NYU has issued a request for proposal seeking organizations that can create a unique design for the reconstruction of the Jacobs Administration Building (JB) at the Tandon School of Engineering.


The current industry-standard software for Building Information Modeling (BIM) is Autodesk Revit. The ultimate goal is to present the university with a building model that will include classrooms, lecture halls, a recreational space, dorms, and facilities to enhance the student’s quality of life. Your final submission will include an Architectural, Electrical, and Plumbing Plan.
The current industry-standard software for Building Information Modeling (BIM) is Autodesk Revit. The ultimate goal is to present the university with a building model that will include classrooms, lecture halls, a recreational space, dorms, and facilities to enhance the student quality of life. The final submission will include an Architectural, Electrical, and Plumbing Plan.


The Housing & Innovation in Revit (HIR) endeavor is a pivotal step in solidifying NYU’s place in Brooklyn and providing students with added living space, resources, and an ever-growing campus.
The Housing & Innovation in Revit (HIR) project is a pivotal step in solidifying NYU’s place in Brooklyn and providing students with modern living space, resources, and an ever-growing campus.


[[Image:Arch.JPG|frame|center|Figure 1: The Washington Square Arch, widely regarded as the main symbol of NYU.]]
[[Image:Arch.JPG|frame|center|Figure 1: The Washington Square Arch, widely regarded as the main symbol of NYU.]]


= Specifications =
= Specifications =
The new building that you design must meet the high standards and aesthetic expectations of the university. NYU has provided the following guidelines for the building.
The new building must meet the high standards and aesthetic expectations of the university. NYU has provided the following guidelines for the building.


The completed building must have at least '''six''' floors. The lot is approximately 200 ft by  200 ft and bound by Jay Street and Johnson Street. The campus expansion must include:
The completed building must have at least '''six''' floors. The lot is approximately 200 ft by  200 ft and bound by Jay Street and Johnson Street. The campus expansion must include:
Line 24: Line 24:
** Restaurant/cafeteria, gym, tennis court, etc.
** Restaurant/cafeteria, gym, tennis court, etc.


Additional rooms should be placed in the building as long as the above requirements are met. Additionally, electrical and plumbing schematics must be completed for one recreational space, one dorm room, and one classroom. This includes all electrical wiring and plumbing pipes. Using these schematics, the '''cost of operation''' must be calculated for the entire facility. The campus must also achieve a LEED accreditation of at least '''Gold''' (four categories of the six available categories). The [https://docs.google.com/document/d/1Yf0joyQBAGnwb8-fFidEOHAzEnb4XCW0Hf8BF23kFZY/edit#heading=h.zf1l69ndrw3o LEED accreditation system] is explained further down the page.
Additional rooms should be placed in the building as long as the basic requirements are met. Additionally, electrical and plumbing schematics must be completed for one recreational space, one dorm room, and one classroom. This includes all electrical wiring and plumbing. Using these schematics, the '''cost of operation''' must be calculated for the entire facility. The campus must also achieve a Leadership in Energy & Environmental Design (LEED) accreditation of at least '''Gold''' (four categories of the six available categories). The [https://docs.google.com/document/d/1Yf0joyQBAGnwb8-fFidEOHAzEnb4XCW0Hf8BF23kFZY/edit#heading=h.zf1l69ndrw3o LEED accreditation system] is explained further down the page.


[[Image:Jacobs_building.JPG|thumb|600px|center|Figure 2: Exterior of the Jacobs Administration Building on Jay Street]]
[[Image:Jacobs_building.JPG|thumb|600px|center|Figure 2: Exterior of the Jacobs Administration Building on Jay Street]]
Line 30: Line 30:
== Building Code ==
== Building Code ==


The new campus must adhere to the General Engineering Building Code as outlined below:
The new campus must adhere to the General Engineering Building Code:
* Fire Code
* Fire Code
** Each floor must be equipped with sprinkler heads and emergency evacuation stairs.
** Each floor must be equipped with sprinkler heads and emergency evacuation stairs
*** It is mandatory to include the sprinkler system in the plumbing plan of the classrooms.
*** It is mandatory to include the sprinkler system in the plumbing plan of the classrooms
** Fire alarms must be placed in each classroom, dorm hallway, and recreational space.
** Fire alarms must be placed in each classroom, dorm hallway, and recreational space
*** Electrical wiring for the fire alarms is not necessary.
*** Electrical wiring for the fire alarms is not necessary.
* Wheelchair Accessibility
* Wheelchair Accessibility
Line 40: Line 40:
** At least one bathroom stall per floor must be wheelchair accessible.
** At least one bathroom stall per floor must be wheelchair accessible.
* Security
* Security
** Every entrance and exit must be guarded by a 24/7 security guard with a desk and tap-in system. This can be illustrated in your design by having a security desk with turnstiles or a system to scan IDs.
** Every entrance and exit must be guarded by a 24/7 security guard with a desk and tap-in system. This can be illustrated in the design by having a security desk with turnstiles or a system to scan IDs
** Entrances to dorm areas must have a turnstile in addition to the standard security guard.
** Entrances to dorm areas must have a turnstile in addition to a security guard
* Structural Rules
* Structural Rules
** All doors must be at least 6 ft 8 in tall and 3 ft wide.
** All doors must be at least 6 ft 8 in tall and 3 ft wide
** All walls must be at least 8 ft tall (from floor to ceiling).
** All walls must be at least 8 ft tall (from floor to ceiling)


== LEED Accreditation ==
== LEED Accreditation ==


Leadership in Energy & Environmental Design (LEED) is a green building certification program encouraging environmentally-conscious design. To receive LEED certification, building projects satisfy prerequisites and earn points to achieve different levels of certification. Teams choose the prerequisites which best fit their project goals. The six categories of the LEED checklist <ref name="checklist">[http://www.usgbc.org/resources/leed-v4-building-design-and-construction-current-version http://www.usgbc.org/resources/leed-v4-building-design-and-construction-current-version]</ref> correspond to principles of design, construction, and maintenance. LEED Silver certification requires completion of at least two categories; LEED Gold, at least four categories; and LEED Platinum, all six categories.  
LEED accreditation is a green building certification program encouraging environmentally-conscious design. To receive LEED accreditation, building projects must satisfy prerequisites and earn points to achieve different levels of accreditation. Designs choose the prerequisites that best fit their project goals. The six categories of the LEED checklist <ref name="checklist">[http://www.usgbc.org/resources/leed-v4-building-design-and-construction-current-version http://www.usgbc.org/resources/leed-v4-building-design-and-construction-current-version]</ref> correspond to principles of design, construction, and maintenance. LEED Silver acreditation requires completion of at least two categories; LEED Gold, at least four categories; and LEED Platinum, all six categories.  


For the purposes of this SLDP, the building project will adhere to the Streamlined Checklist below. '''All prerequisites from a category must be incorporated into the building design to count toward certification'''. Achievement of each prerequisite will be accomplished through drawings, cost estimates, and explanations of the design. There will be a few design features which cannot be demonstrated in Revit, but they must be discussed thoroughly in your final LEED Accreditation Report to satisfy the prerequisites.
For the purposes of this Semester Long Design Project (SLDP), the building project will adhere to the Streamlined Checklist below. '''All prerequisites from a category must be incorporated into the building design to count toward accreditation'''. Achievement of each prerequisite will be accomplished through drawings, cost estimates, and explanations of the design. There will be a few design features that cannot be shown in Revit, but they must be discussed thoroughly in the final LEED Accreditation Report to satisfy the prerequisites.


Streamlined  Checklist:
Streamlined  Checklist:
# Location and Transportation
# Location and Transportation
## Diverse land use (p.16<ref name="checklist"></ref>) – Design provides space for goods and services not directly related to the college campus. (Examples: cafe, gym, multi-purpose spaces for the public, etc.)
## Diverse land use – Design provides space for goods and services not directly related to the college campus. (Examples: cafe, gym, multi-purpose spaces for the public, etc.)
## Disability access – Detailed features are provided for Americans with Disability Act. (Examples: reserved parking, wheelchair-accessible ramps)
## Disability access – Detailed features are provided for Americans with Disability Act. (Examples: reserved parking, wheelchair-accessible ramps)
## Bicycle and EV facilities (p.22<ref name="checklist"></ref>) – Bike racks and electric vehicle charging stations <u>labeled in drawings</u>.
## Bicycle and EV facilities – Bike racks and electric vehicle charging stations <u>labeled in drawings</u>.
## Reduced parking footprint (p.26<ref name="checklist"></ref>) – Realistic dimensions for parking spaces with minimal allocated space for a parking lot if the facility of choice is a parking area.
## Reduced parking footprint – Realistic dimensions for parking spaces with minimal allocated space for a parking lot if the facility of choice is a parking area.
# Sustainable Sites
# Sustainable Sites
## Open space (p.36<ref name="checklist"></ref>) – Inclusion of green space on the campus grounds. (Examples: gardens, park space, rooftop vegetation, pond)
## Open space – Inclusion of green space on the campus grounds. (Examples: gardens, park space, rooftop vegetation, pond)
## Rainwater management (p.37<ref name="checklist"></ref>) – Reducing stormwater runoff and built land impact on the hydrologic cycle. (Examples: rainwater retention pond, rainwater storage, rainwater reuse)
## Rainwater management – Reducing stormwater runoff and built land impact on the hydrologic cycle. (Examples: rainwater retention pond, rainwater storage, rainwater reuse)
## Heat island reduction (p.39<ref name="checklist"></ref>) – Minimizing paved and rooftop surfaces. (Examples: vegetative surfaces, trees, shade from energy generation systems)
## Heat island reduction – Minimizing paved and rooftop surfaces. (Examples: vegetative surfaces, trees, shade from energy generation systems)
## Light pollution reduction (p.41<ref name="checklist"></ref>) – Detailed placement of outdoor lighting fixtures, maximizing security and minimizing light pollution.
## Light pollution reduction – Detailed placement of outdoor lighting fixtures, maximizing security and minimizing light pollution.
# Water Efficiency
# Water Efficiency
## Water quality management – Real-time quality monitoring system, shutoff system for cases of contamination.  
## Water quality management – Real-time quality monitoring system, shutoff system for cases of contamination.  
## Water use reduction (p.51<ref name="checklist"></ref>) – Use of low flow appliances and minimal irrigation, details for all water uses. (Example: sprinklers, sinks, toilets)
## Water use reduction – Use of low flow appliances and minimal irrigation, details for all water uses. (Example: sprinklers, sinks, toilets)
## Water heating and cooling (p.60<ref name="checklist"></ref>) – Intelligent placement of high efficiency systems.
## Water heating and cooling – Intelligent placement of high efficiency systems.
## Advanced water metering – Real-time quantity monitoring system of all water use. (Examples: irrigation, indoor plumbing, reclaimed water, boiler usage)
## Advanced water metering – Real-time quantity monitoring system of all water use. (Examples: irrigation, indoor plumbing, reclaimed water, boiler usage)
# Energy and Atmosphere
# Energy and Atmosphere
## Optimize energy performance (p.74<ref name="checklist"></ref>) – Use of low energy systems. (Examples: lighting, refrigeration, appliances)
## Optimize energy performance – Use of low energy systems. (Examples: lighting, refrigeration, appliances)
## Advanced energy metering (p.77<ref name="checklist"></ref>) – All electrical use runs through a single meter.  
## Advanced energy metering – All electrical use runs through a single meter.  
## Demand response (p.79<ref name="checklist"></ref>) – Energy use changes throughout the day.
## Demand response – Energy use changes throughout the day.
## Renewable energy production (p.80<ref name="checklist"></ref>) – Location and connection to the electrical system. (Examples: solar, wind, thermal)  
## Renewable energy production – Location and connection to the electrical system. (Examples: solar, wind, thermal)  
# Indoor Environmental Quality
# Indoor Environmental Quality
## Air quality management (p.107<ref name="checklist"></ref>) – Ventilation and monitoring of air. (Examples: carbon monoxide detectors, exhaust vents, air filtration system)
## Air quality management – Ventilation and monitoring of air. (Examples: carbon monoxide detectors, exhaust vents, air filtration system)
## Interior lighting/daylight (p.129<ref name="checklist"></ref>) – Enhanced interior lighting. (Examples: dimmers, daylight, window shades)
## Interior lighting/daylight – Enhanced interior lighting. (Examples: dimmers, daylight, window shades)
## Thermal comfort (p.127<ref name="checklist"></ref>) – Enhanced temperature control for individual comfort. (Examples: localized heating and cooling, circulating fans, radiant flooring)
## Thermal comfort – Enhanced temperature control for individual comfort. (Examples: localized heating and cooling, circulating fans, radiant flooring)
## Acoustic performance (p.136<ref name="checklist"></ref>) – Sound absorbent surfaces are greater than the ceiling area. (Examples: acoustic tiles, acoustic wall panels)
## Acoustic performance – Sound absorbent surfaces are greater than the ceiling area. (Examples: acoustic tiles, acoustic wall panels)
# Innovation (p.140<ref name="checklist"></ref>)
# Innovation  
## Connected building – Design the campus for internet connectivity and connected devices. (Examples: Wi-Fi router, networked registers, inventory systems)
## Connected building – Design the campus for internet connectivity and connected devices. (Examples: Wi-Fi router, networked registers, inventory systems)
## Intelligent inventory – Real-time monitoring of inventory, if applicable. (Examples: shelves with sensors, database connected to registers, exit door scanners)
## Intelligent inventory – Real-time monitoring of inventory, if applicable. (Examples: shelves with sensors, database connected to registers, exit door scanners)
Line 84: Line 84:
## Sustainability – Focus on innovative green technologies not included in other categories.
## Sustainability – Focus on innovative green technologies not included in other categories.


Examples mentioned in the Streamlined Checklist can be found on [https://www.revitcity.com/index.php Revit City] or [https://bimsmith.com/ BimSmith]. You are not limited to the examples in the checklist.
Examples mentioned in the Streamlined Checklist can be found on [https://www.revitcity.com/index.php Revit City] or [https://bimsmith.com/ BimSmith]. The design is not limited to the examples in the checklist.


== Power/AC/Heat Calculations ==
== Power/AC/Heat Calculations ==


Using the information from electrical schematics, plumbing schematics, and outside research to compare:
Use the information from electrical schematics, plumbing schematics, and outside research to:


# Calculate the total power usage for the operation of the building per day.
# Calculate the total power usage for the operation of the building per day.
# Calculate the energy costs for a typical year.
# Calculate the energy costs for a typical year.
# Determine the total A/C and heating requirements.
# Determine the total A/C and heating requirements.
## To do this, research the power, heat, and AC calculations of buildings that are similar in size and efficiency ratings as your building design
## To do this, research the power, heat, and AC calculations of buildings that are similar in size and efficiency ratings as the building design
# Tabulate this data neatly in a table, graph, or chart that presents the information clearly.
# Tabulate this data neatly in a table, graph, or chart that presents the information clearly.
## The standard unit of measurement for these power measurements is the kilowatt-hour (kWh).
## The standard unit of measurement for these power measurements is the kilowatt per hour (kWh).


== Microsoft Project ==
== Microsoft Project ==


You must create two separate Microsoft Project schedules; one SLDP Schedule to manage the progress of your design process and one Construction Schedule outlining the theoretical construction schedule of your building design. Instructions for how to access Microsoft Project can be found on the [[Software Requirements]] page of the manual. You can learn Microsoft Project by accessing the [[Media: Microsoft Project Student Guide.pptx |Microsoft Project Student Guide]].  
Two separate Microsoft Project schedules must be made; one schedule to manage the progress of the design process and one Construction Schedule outlining the theoretical construction schedule of the building design. Instructions for how to access Microsoft Project can be found on the [[Software Requirements]] page of the manual. Learn Microsoft Project by accessing the [[Media: Microsoft Project Student Guide.pptx |Microsoft Project Student Guide]].  


The <b>SLDP Schedule</b> must include all tasks related to the project design from the start of it to Submission. The Microsoft Project schedule should include the following:
The <b>SLDP Schedule</b> must include all tasks related to the project design from the start to Early or Final Submission. The Microsoft Project schedule should include the following:


* Minimum of 20 tasks, not including Milestones.
* Minimum of 20 tasks, not including Milestones.
Line 107: Line 107:
* The person responsible for completing the task (Resource names).
* The person responsible for completing the task (Resource names).


The original and updated SLDP Schedules should be included in the Milestone Presentations.  
The original and updated SLDP Schedules must be included in the Milestone Presentations.  


Use the "Copy Picture" function to include the project plan in the presentations. '''Do not take a screenshot'''.
Use the "Copy Picture" function to include the project plan in the presentations. '''Do not take a screenshot'''.


* Gantt charts must be displayed alongside the tasks list (fit onto one slide).
* Gantt charts must be displayed alongside the tasks list (fit onto one slide)
* Gantt charts must clearly show a progress line.
* Gantt charts must clearly show a progress line
* Clearly state during the presentation whether the project is on-time, behind schedule, or ahead of schedule.
* Clearly state during the presentation whether the project is on-time, behind schedule, or ahead of schedule


For help in planning the project, review the manual page [[Planning Project Scheduling & Costs]].
For help in planning the project, review the manual page [[Planning Project Scheduling & Costs]].
Line 126: Line 126:
* Plumbing
* Plumbing


You can model the schedule after similar sample construction projects.
Model the schedule after similar sample construction projects.


== Drawings ==
== Drawings ==
The following paragraphs discuss the drawings required for the project using Revit. '''No other software will be accepted for submission.''' Revit is free to download using your NYU email on Autodesk student accounts, and all computers in the EG1004 Model Shop and NYU Tandon computer lab have full copies of the software.  
The following paragraphs discuss the drawings required for the project using Revit. '''No other software will be accepted for submission.''' Revit is free to download using an NYU email on Autodesk student accounts, and all computers in the EG1004 Model Shop and NYU Tandon computer lab have full copies of the software.  


Consult the [[Revit-How-To Guide]] to create your college campus expansion. The How-To Guide contains useful examples for designing your building, but '''do not copy the instructions for your project as they only serve as examples of the features available in Revit.'''  
Consult the [[Revit How-To Guide]] to create the building design. The How-To Guide contains useful examples for designing the building, but '''do not copy the instructions for the project as they only serve as examples of the features available in Revit.'''  


Other helpful resources include the [https://knowledge.autodesk.com/support/revit-products/learn Autodesk Revit Knowledge] Network. The Linkedin Learning [https://www.linkedin.com/learning/revit-2020-essential-training-for-architecture-imperial/revit-2020-for-architecture-2?u=2131553 Architectural] & [https://www.linkedin.com/learning/revit-2020-essential-training-for-mep-imperial/adding-lighting-fixtures?u=2131553 Mechanical] Guides are also very useful for any questions you might have.
Other helpful resources include the [https://knowledge.autodesk.com/support/revit-products/learn Autodesk Revit Knowledge] Network. The Linkedin Learning [https://www.linkedin.com/learning/revit-2020-essential-training-for-architecture-imperial/revit-2020-for-architecture-2?u=2131553 Architectural] & [https://www.linkedin.com/learning/revit-2020-essential-training-for-mep-imperial/adding-lighting-fixtures?u=2131553 Mechanical] Guides are also very useful for any questions.


Each floor of your campus must have an accompanying drawing. It must be fully dimensioned and include all aspects of the room design including:
Each floor of the building design must have an accompanying drawing. It must be fully dimensioned and include all aspects of the room design including:
* All door and window openings
* All door and window openings
* Material choices
* Material choices
Line 149: Line 149:
* Sprinkler systems
* Sprinkler systems


<b>All of the floors must be created in one project file.</b> To design all of the floors in the same file you will need to add levels. First, click on an elevation view (North, South, East, or West), then, click on "Level" in the Datum panel of the Architecture tab in the Ribbon. Then, you can draw the level elevation with your cursor. You can change the elevation of the level by editing “Elevation” in the Properties tab and applying the change in the "Offset" input. You can see how many levels you have by looking at Floor Plans in the Project Browser Tab. '''Do not create new files for each floor. You will only be allowed to submit a single Revit file for Submission'''.
<b>All of the floors must be created in one project file.</b> To design all of the floors in the same file, levels must be added. Click on an elevation view (North, South, East, or West), then, click on Level in the Datum panel of the Architecture tab in the Ribbon. Draw the level elevation with the cursor. The elevation of the level can be changed by editing Elevation in the Properties tab and applying the change in the Offset input. The levels can be viewed by looking at Floor Plans in the Project Browser Tab. '''Do not create new files for each floor. Only a single Revit file can be used for Submission'''.


== Model ==
== Model ==
Design your campus using Autodesk Revit as your primary design tool. Create a convenient layout to accommodate the items listed in Specifications. Once the design is complete, generate a walk-through video of the campus. You can create a walkthrough by clicking on the View tab and then clicking on “Walkthrough” from the 3D View dropdown in the Create tab Additional 3D printing details can be found in the [[3D Printing and Logo Guide]]. You can receive extra credit by 3D printing on the floor plan with only structural elements of that floor. That does not include any furniture.
Design the building using Autodesk Revit as the primary design tool. Create a layout to accommodate the items listed in Specifications. Once the design is complete, generate a walk-through video of the campus. Create a walkthrough by clicking on the View tab and then clicking on Walkthrough from the 3D View dropdown in the Create tab Additional 3D printing details can be found in the [[3D Printing and Logo Guide]]. Extra credit can be achieved by 3D printing on the floor plan with only structural elements of that floor. That does not include any furniture.


[[Image:Sls_1.PNG|thumb|500px|center|Figure 3: Example of a classroom in Autodesk Revit]]
[[Image:Sls_1.PNG|thumb|500px|center|Figure 3: Example of a classroom in Autodesk Revit]]
Line 158: Line 158:
== Cost Estimate ==
== Cost Estimate ==


<b>Three separate tables (construction, operation, and labor)</b> for cost estimation must be created using the following guidelines:
<b>Three separate tables (construction, operation, and labor)</b> for cost estimates must be created using the following guidelines:


*<b>Cost of Construction:</b> Using the wholesale price of all materials and components in your design, calculate the total cost of construction of your building design (not including labor). The materials can be found in the “Schedules” tab and you can create a tabulated bill of materials and generate a complete cost estimate for the entire building.
*<b>Cost of Construction:</b> Using the wholesale price of all materials and components in the design, calculate the total cost of construction of the building design (not including labor). The materials can be found in the Schedules tab and create a tabulated bill of materials and generate a complete cost estimate for the entire building


* <b>Cost of Operation:</b> Calculate the total cost of operation per day and per year of the design for reconstruction. Tabulate energy usage and associated costs into a neatly organized table, as described in the Power/AC/Heat Calculations section.
* <b>Cost of Operation:</b> Calculate the total cost of operation per day and per year of the design for reconstruction. Tabulate energy usage and associated costs into a neatly organized table, as described in the Power/AC/Heat Calculations section


* <b>Labor:</b> Calculate the total cost of labor for the construction of the building. Do not include the cost of labor for operation. Refer to the Construction Schedule to create this estimate. Neatly tabulate the costs into a table.
* <b>Labor:</b> Calculate the total cost of labor for the construction of the building. Do not include the cost of labor for operation. Refer to the Construction Schedule to create this estimate. Neatly tabulate the costs into a table


== CATME ==
== CATME ==


When working on engineering team projects, peer evaluations and self-evaluations are critical for assessing how effective your contributions are to the team. In our course, your recitation professor will use evaluations at each Milestone using a software called the Comprehensive Assessment of Team Member Effectiveness (CATME). More information can be found on the [[Teamwork Expectations]] page.
When working on engineering team projects, peer evaluations and self-evaluations are critical for assessing how effective all contributions are to the project. In EG1004, the recitation professor will use evaluations at each Milestone using a software called the Comprehensive Assessment of Team Member Effectiveness (CATME). More information can be found on the [[Teamwork Expectations]] page.


== Engineering Notebook ==
== Engineering Notebook ==


While working on your project, you are expected to keep a record of all work done, as well as future plans and goals. In order to complete a Benchmark assessment, show your Engineering Notebook to the Lab/Open Lab TA completing your assessment. For all Milestones and Final Submission, you must have it approved by your Recitation Professor and be prepared to make it available to an Open Lab TA in a Word Document (DOC or DOCX) format. A guide to writing the notebook, as well as a basic overview of its expectations and frequency at which you should log in your notebook, can be found on the [[Keeping an Engineering Notebook]] page.
While working on the project, a record of all work done and future plans and goals must be maintained. To complete a Benchmark assessment, show the Engineering Notebook to the Lab/Open Lab TA completing the assessment. For all Milestones and Final Submission, the Engineering Notebook must be approved by the recitation professor and be prepared to make it available to an Open Lab TA in a Word Document (.doc or .dox) format. A guide to writing a notebook, and a basic overview of the expectations and frequency of updates to the notebook, can be found on the [[Keeping an Engineering Notebook]] page.


== Extra Credit ==  
== Extra Credit ==  


HIR groups can receive extra credit for:
HIR groups can receive extra credit for:
* Achieving Platinum LEED certification in their building design.  
* Achieving Platinum LEED certification in the building design.  
* 3D printing the exterior of your building
* 3D printing the exterior of the building
** More details about creating an Exterior Print for HIR Extra Credit can be found in this [https://docs.google.com/document/u/1/d/1_8k6RcfDBQsWteHMAvK_hCbWyBfvJTWsYtYOBSud-1k/edit Basic Exterior Print Guide]
** More details about creating an Exterior Print for HIR extra credit can be found in this [https://docs.google.com/document/u/1/d/1_8k6RcfDBQsWteHMAvK_hCbWyBfvJTWsYtYOBSud-1k/edit Basic Exterior Print Guide]


Additional extra credit opportunities are as follows:
Additional extra credit opportunities are as follows:
* Completing Benchmark A, Benchmark B, or Submission early
* Completing Benchmark A, Benchmark B, or Submission early
* Completing '''HIR's 3D printing Extra Credit''' task of printing TWO stackable adjacent floor plans as described in the [[3D Printing and Logo Guide]].
* Completing '''HIR's 3D printing Extra Credit''' task of printing two stackable adjacent floor plans as described in the [[3D Printing and Logo Guide]].
** More details about creating TWO stackable adjacent floor plans for '''HIR 3D printing Extra Credit''' can be found in this [https://docs.google.com/document/u/1/d/1dj2yXERXwIE_XQhqVGzW7dzMuuFOPU_HV8IXl6XM3l4/edit Basic Floor Plan Print Guide]
** More details about creating two stackable adjacent floor plans for '''HIR 3D printing Extra Credit''' can be found in this [https://docs.google.com/document/u/1/d/1dj2yXERXwIE_XQhqVGzW7dzMuuFOPU_HV8IXl6XM3l4/edit Basic Floor Plan Print Guide]


Refer to the [[EG1004 Grading Policy]] for exact point values. Creativity and innovation are always rewarded. Original designs will receive extra credit.
Refer to the [[EG1004 Grading Policy]] for exact point values. Creativity and innovation are always rewarded. Original designs will receive extra credit.


= Milestones, Benchmarks, and Deliverables =
= Milestones, Benchmarks, and Deliverables =
As you work on your project, you will be required to present periodic reports on your progress. We call these Milestones. All of the items assigned in each Benchmark are called deliverables. These deliverables often consist of a combination of written submissions, presentations, and demonstrations. Benchmark assessments evaluate the progress of your project.
As work on your project continues, periodic reports on the progress will be presented in three Milestones. All of the items assigned in each Benchmark are the deliverables. These deliverables often consist of a combination of written submissions, presentations, and demonstrations. Benchmark assessments evaluate the progress of the project.


'''<span style="color: red;"> Note: You are only allowed to get a benchmark and commission approval from a TA at the end of Lab or during Open Lab times before your specific deadline. <span>'''
'''<span style="color: red;"> Note: A benchmark and commission approval from a TA for the project may only be made at the end of the Lab or during Open Lab <span>'''


== Preliminary Design Investigation ==
== Preliminary Design Investigation ==


The Preliminary Design Investigation (PDI) is extremely important, as it lays the groundwork for your project. You will be outlining your project idea, inspiration, and goals.  
The Preliminary Design Investigation (PDI) is extremely important, as it lays the groundwork for the project. The PDI outlines the project idea, inspiration, and goals.  


The PDI must include:
The PDI must include:
Line 206: Line 206:
*Relevant Pictures
*Relevant Pictures


An example PDI template can be found [[Media:HIR_PDI_Template_1004.docx|here]]. <b>The PDI is due by Benchmark A and can be approved by any Open Lab TA.</b> Do not forget to include the items listed above, but do not feel limited to only these items. Use this link to access the [https://docs.google.com/document/d/1DeNqr-xFcK8b_R2tADBNgd6B4ipAK-npOm7BXcQZ1OE/edit?usp=sharing HIR PDI Rubric].
An PDI template can be found [[Media:HIR_PDI_Template_1004.docx|here]]. <b>The PDI is due by Benchmark A and can be approved by any Open Lab TA.</b> Do not forget to include the items listed above, but do not feel limited to only these items. Use this link to access the [https://docs.google.com/document/d/1DeNqr-xFcK8b_R2tADBNgd6B4ipAK-npOm7BXcQZ1OE/edit?usp=sharing HIR PDI Rubric].


== Milestone 1==
== Milestone 1==
Line 212: Line 212:
'''<span style="color: red;">See [[Media:HOW_TO_GIVE_A_MILESTONE_PRESENTATION_Fall_2020.pptx|How to Give a Milestone Presentation]] for the format of a Milestone presentation.</span>'''
'''<span style="color: red;">See [[Media:HOW_TO_GIVE_A_MILESTONE_PRESENTATION_Fall_2020.pptx|How to Give a Milestone Presentation]] for the format of a Milestone presentation.</span>'''


Milestone 1 is a presentation of your Preliminary Design Investigation. It is important that you outline your project goals and show that your project is realizable. This includes:
Milestone 1 is a presentation of the PDI. It is important that this presentation outlines the project goals and shows that the project is realizable.  


Your Milestone 1 presentation must include:
The Milestone 1 presentation must include:
* Company profile
* Company profile
** Company name
** Company name
** Product name
** Product name
** Group member title(s)
** Company officer title(s)
** Mission statement
** Mission statement
* Project objective
* Project objective
** What is your project about?
** What is the project about?
** What tasks are you aiming to accomplish? (Benchmark A requirements)
** What tasks are the company aiming to accomplish? (Benchmark A requirements)
** Overall design approach to complete objective
** Overall design approach to complete objective
* Background information
* Background information
Line 228: Line 228:
** What does the audience need to know?
** What does the audience need to know?
* Technical design description
* Technical design description
** Brief explanation of what LEED categories are being tackled
** Brief explanation of the LEED categories being tackled
*** All four required categories
*** All four required categories
*** Give a few examples on how it will be accomplished
*** Give a few examples on how it will be accomplished
Line 241: Line 241:
* Summary
* Summary
** Overall assessment on current state of project
** Overall assessment on current state of project
** Are you on schedule? Are you on budget?
** Is the project on schedule? Is it on budget?
** Next steps and future tasks
** Next steps and future tasks


Line 247: Line 247:


{{SLDP: Benchmark A}}
{{SLDP: Benchmark A}}
* Preliminary Design Investigation
* One recreational space Revit design
* One recreational space Revit design
* One 40-student classroom Revit design
* One 40-student classroom Revit design
* One 20-student classroom Revit design
* One 20-student classroom Revit design
* Submit an .STL and a .3mf (Cura Project file) of the team logo through the 3D Printing Submission portal on the EG website
* Submit an .STL and a .3mf (Cura Project file) of the company logo through the 3D Printing Submission portal on the EG website
** The [[3D Printing and Logo Guide]] contains information on the 3D printing requirements and guidelines.
** The [[3D Printing and Logo Guide]] contains information on the 3D printing requirements and guidelines.
** The Protolab schedule is available on the [[3D Printing and Logo Guide]]
** The ProtoLab schedule is available on the [[3D Printing and Logo Guide]]
* Updated Engineering Notebook
* Updated Engineering Notebook


Line 262: Line 261:
'''<span style="color: red;">See [[Media:HOW_TO_GIVE_A_MILESTONE_PRESENTATION_Fall_2020.pptx|How to Give a Milestone Presentation]] for the format of a Milestone presentation.</span>'''
'''<span style="color: red;">See [[Media:HOW_TO_GIVE_A_MILESTONE_PRESENTATION_Fall_2020.pptx|How to Give a Milestone Presentation]] for the format of a Milestone presentation.</span>'''


Milestone 2 is a project progress update. You must explain all changes and developments made thus far, particularly in regards to Benchmark A. Include whether or not you were able to complete your Benchmark A requirements, and if not, explain why. Also, highlight any changes you plan on making to your design or project, in general. Your Milestone 2 presentation must include:
Milestone 2 is a project progress update. It must explain all changes and developments made to date, particularly in regard to Benchmark A. Include whether or not the Benchmark A requirements were completed, and if not, explain why. Also, highlight any planned changes for the design or project, in general.  


Your Milestone 2 presentation must include:
The Milestone 2 presentation must include:
* Company profile
* Company profile
** Company name
** Company name
** Product name
** Product name
** Group member title(s)
** Company officer title(s)
** Mission statement
** Mission statement
* Project objective
* Project objective
** What is your project about?
** What is the project about?
** What tasks are you aiming to accomplish? (Benchmark A/Benchmark B requirements)
** What tasks are the company aiming to accomplish? (Benchmark A/Benchmark B requirements)
** Overall design approach to complete objective
** Overall design approach to complete objective
* Background information
* Background information
Line 279: Line 278:
* Technical design description
* Technical design description
** Explanation of design changes, if any
** Explanation of design changes, if any
** Brief explanation of what LEED categories are being tackled
** Brief explanation of the LEED categories being tackled
*** All four required categories
*** All four required categories
*** Show examples of LEED implementations in Revit
*** Show examples of LEED implementations in Revit
Line 298: Line 297:
* Summary
* Summary
** Overall assessment on current state of project
** Overall assessment on current state of project
** Are you on schedule? Are you on budget?
** is the project on schedule? Is it on budget?
** Next steps and future tasks
** Next steps and future tasks


Line 312: Line 311:
* Electrical and plumbing for one dorm room
* Electrical and plumbing for one dorm room
** Some of the LEED requirements should be shown in the Revit model
** Some of the LEED requirements should be shown in the Revit model
** Ideas that cannot be shown in the Revit model should have a more detailed explanation:
** Elements of the design that cannot be shown in the Revit model should have a more detailed explanation:
*** Examples of other building projects implementing something similar
*** Examples of other building projects implementing something similar
*** Explanation of the technology required
*** Explanation of the technology required
*** Justify this decision over more common solutions
*** Justify this decision over more common solutions
* Have an .STL and a .3mf (Cura Project file) of the team logo approved by a ProtoLab TA through the 3D Printing Submission portal on the EG website. Students must physically go to the Protolab before their Modelshop Session 3 to get their logo approved. Logos cannot be approved during Modelshop sessions.
* Have an .STL and a .3mf (Cura Project file) of the company logo approved by a ProtoLab TA through the 3D Printing Submission portal on the EG website. Students must physically go to the ProtoLab before their Modelshop Session 3 to get their logo approved. Logos cannot be approved during Modelshop sessions.
** The [[3D Printing and Logo Guide]] contains information on the 3D printing requirements and guidelines.
** The [[3D Printing and Logo Guide]] contains information on the 3D printing requirements and guidelines.
* Updated Engineering Notebook
* Updated Engineering Notebook
Line 326: Line 325:
'''<span style="color: red;">See [[Media:HOW_TO_GIVE_A_MILESTONE_PRESENTATION_Fall_2020.pptx|How to Give a Milestone Presentation]] for the format of a Milestone presentation.</span>'''
'''<span style="color: red;">See [[Media:HOW_TO_GIVE_A_MILESTONE_PRESENTATION_Fall_2020.pptx|How to Give a Milestone Presentation]] for the format of a Milestone presentation.</span>'''


Milestone 3 is the last project progress update. You must explain all changes and developments made thus far, particularly in regards to Benchmark B. Include whether or not you were able to complete your Benchmark B requirements, and if not, explain why. Also, highlight any changes you plan on making to your Revit design or project, in general. Your Milestone 3 presentation must include:
Milestone 3 is the last project progress update. It must explain all changes and developments made to date, particularly in regards to Benchmark B. Include whether or not all Benchmark B requirements were completed, and if not, explain why. Also, highlight any planned changes to the Revit design or project, in general.  


Your Milestone 3 presentation must include:
Your Milestone 3 presentation must include:
Line 332: Line 331:
** Company name
** Company name
** Product name
** Product name
** Group member title(s)
** Company officer title(s)
** Mission statement
** Mission statement
* Project objective
* Project objective
** What is your project about?
** What is the project about?
** What tasks are you aiming to accomplish? (Benchmark A/Benchmark B/Co requirements)
** What tasks is the company aiming to accomplish? (Benchmark A/Benchmark B requirements)
** Overall design approach to complete objective
** Overall design approach to complete objective
* Background information
* Background information
Line 343: Line 342:
* Technical design description
* Technical design description
** Explanation of design changes, if any
** Explanation of design changes, if any
** Brief explanation of what LEED categories are being tackled
** Brief explanation of LEED categories being tackled
*** All four required categories
*** All four required categories
*** Show examples of LEED implementations in Revit
*** Show examples of LEED implementations in Revit
Line 364: Line 363:
* Summary
* Summary
** Overall assessment on current state of project
** Overall assessment on current state of project
** Are you on schedule? Are you on budget?
** Is the project on schedule? Is it on budget?
** Next steps and future tasks
** Next steps and future tasks


Line 371: Line 370:
{{SLDP: Commissioning}}
{{SLDP: Commissioning}}


* Approved and updated Engineering Notebook. The Engineering Notebook can be approved by any open lab TA. Make sure significant progress has been made and recorded since Benchmark B.
* Approved and updated Engineering Notebook. The Engineering Notebook can be approved by any Open Lab TA. Make sure significant progress has been made and recorded since Benchmark B.
* Revit drawings (1:240 scale)
* Revit drawings (1:240 scale)
** Floor plan for all floors
** Floor plan for all floors
Line 377: Line 376:
*** In addition to traditional appliances, like sinks, include fire alarms and sprinkler systems.
*** In addition to traditional appliances, like sinks, include fire alarms and sprinkler systems.
** Electrical system (recreational space, one classroom, and one dorm room)
** Electrical system (recreational space, one classroom, and one dorm room)
** Front elevation of your project
** Front elevation of the building design
** Most detailed side view of your project
** Most detailed side view of the building design
** Be sure to also include each of these requirements in your LEED Accreditation Report
** Be sure to also include each of these requirements in your LEED Accreditation Report
* Model of building (3D Revit) (1:240 scale)
* Model of building (3D Revit) (1:240 scale)
Line 384: Line 383:
* Achieve Gold LEED accreditation
* Achieve Gold LEED accreditation
* A LEED accreditation report
* A LEED accreditation report
* Have an .STL file of the team logo printed through the 3D Printing Submission portal on the EG website
* Have an .STL file of the company logo printed through the 3D Printing Submission portal on the EG website
** The [[3D Printing and Logo Guide]] contains information on the 3D printing requirements and guidelines.
** The [[3D Printing and Logo Guide]] contains information on the 3D printing requirements and guidelines.
** The protolab schedule is available on the [[3D Printing and Logo Guide]]
** The ProtoLab schedule is available on the [[3D Printing and Logo Guide]]
* All 3D prints must be approved by a Protolab TA  
* All 3D prints must be approved by a ProtoLab TA  


== LEED Accreditation Report ==
== LEED Accreditation Report ==


A LEED accreditation report is required for Commissioning. The report should be about 5-10 pages long. A recommended outline of the report is given below:
A LEED accreditation report is required for Commissioning. The LEED accreditation report uses different section headers and content than those used int he lab reports, but all LEED accreditation reports must follow the EG1004 style guide. Use this LEED outline accreditation report template with the following outline:


* Cover Page including a title, project name, and group member names
* Cover Page including a title, project name, and group member names

Revision as of 17:10, 2 September 2023

Request for Proposal: Housing & Innovation in Revit


Introduction and Overview

As Brooklyn establishes itself as a technology and innovation hub, projects to modernize Downtown Brooklyn and the MetroTech area are being set into motion. New York University (NYU) plans to expand its Brooklyn campus to reflect its desire to foster innovation, engineering, and a successful college experience. To that effect, NYU has issued a request for proposal seeking organizations that can create a unique design for the reconstruction of the Jacobs Administration Building (JB) at the Tandon School of Engineering.

The current industry-standard software for Building Information Modeling (BIM) is Autodesk Revit. The ultimate goal is to present the university with a building model that will include classrooms, lecture halls, a recreational space, dorms, and facilities to enhance the student quality of life. The final submission will include an Architectural, Electrical, and Plumbing Plan.

The Housing & Innovation in Revit (HIR) project is a pivotal step in solidifying NYU’s place in Brooklyn and providing students with modern living space, resources, and an ever-growing campus.

Figure 1: The Washington Square Arch, widely regarded as the main symbol of NYU.

Specifications

The new building must meet the high standards and aesthetic expectations of the university. NYU has provided the following guidelines for the building.

The completed building must have at least six floors. The lot is approximately 200 ft by 200 ft and bound by Jay Street and Johnson Street. The campus expansion must include:

  • Classrooms
    • Ten 40-student classrooms
    • Eight 20-student classrooms
    • Two 100-student lecture halls
  • One recreational space
  • Dorm rooms to accommodate 100 students
  • One facility of choice
    • Restaurant/cafeteria, gym, tennis court, etc.

Additional rooms should be placed in the building as long as the basic requirements are met. Additionally, electrical and plumbing schematics must be completed for one recreational space, one dorm room, and one classroom. This includes all electrical wiring and plumbing. Using these schematics, the cost of operation must be calculated for the entire facility. The campus must also achieve a Leadership in Energy & Environmental Design (LEED) accreditation of at least Gold (four categories of the six available categories). The LEED accreditation system is explained further down the page.

Figure 2: Exterior of the Jacobs Administration Building on Jay Street

Building Code

The new campus must adhere to the General Engineering Building Code:

  • Fire Code
    • Each floor must be equipped with sprinkler heads and emergency evacuation stairs
      • It is mandatory to include the sprinkler system in the plumbing plan of the classrooms
    • Fire alarms must be placed in each classroom, dorm hallway, and recreational space
      • Electrical wiring for the fire alarms is not necessary.
  • Wheelchair Accessibility
    • Each walkway must be at least 6 ft wide
    • At least one bathroom stall per floor must be wheelchair accessible.
  • Security
    • Every entrance and exit must be guarded by a 24/7 security guard with a desk and tap-in system. This can be illustrated in the design by having a security desk with turnstiles or a system to scan IDs
    • Entrances to dorm areas must have a turnstile in addition to a security guard
  • Structural Rules
    • All doors must be at least 6 ft 8 in tall and 3 ft wide
    • All walls must be at least 8 ft tall (from floor to ceiling)

LEED Accreditation

LEED accreditation is a green building certification program encouraging environmentally-conscious design. To receive LEED accreditation, building projects must satisfy prerequisites and earn points to achieve different levels of accreditation. Designs choose the prerequisites that best fit their project goals. The six categories of the LEED checklist [1] correspond to principles of design, construction, and maintenance. LEED Silver acreditation requires completion of at least two categories; LEED Gold, at least four categories; and LEED Platinum, all six categories.

For the purposes of this Semester Long Design Project (SLDP), the building project will adhere to the Streamlined Checklist below. All prerequisites from a category must be incorporated into the building design to count toward accreditation. Achievement of each prerequisite will be accomplished through drawings, cost estimates, and explanations of the design. There will be a few design features that cannot be shown in Revit, but they must be discussed thoroughly in the final LEED Accreditation Report to satisfy the prerequisites.

Streamlined Checklist:

  1. Location and Transportation
    1. Diverse land use – Design provides space for goods and services not directly related to the college campus. (Examples: cafe, gym, multi-purpose spaces for the public, etc.)
    2. Disability access – Detailed features are provided for Americans with Disability Act. (Examples: reserved parking, wheelchair-accessible ramps)
    3. Bicycle and EV facilities – Bike racks and electric vehicle charging stations labeled in drawings.
    4. Reduced parking footprint – Realistic dimensions for parking spaces with minimal allocated space for a parking lot if the facility of choice is a parking area.
  2. Sustainable Sites
    1. Open space – Inclusion of green space on the campus grounds. (Examples: gardens, park space, rooftop vegetation, pond)
    2. Rainwater management – Reducing stormwater runoff and built land impact on the hydrologic cycle. (Examples: rainwater retention pond, rainwater storage, rainwater reuse)
    3. Heat island reduction – Minimizing paved and rooftop surfaces. (Examples: vegetative surfaces, trees, shade from energy generation systems)
    4. Light pollution reduction – Detailed placement of outdoor lighting fixtures, maximizing security and minimizing light pollution.
  3. Water Efficiency
    1. Water quality management – Real-time quality monitoring system, shutoff system for cases of contamination.
    2. Water use reduction – Use of low flow appliances and minimal irrigation, details for all water uses. (Example: sprinklers, sinks, toilets)
    3. Water heating and cooling – Intelligent placement of high efficiency systems.
    4. Advanced water metering – Real-time quantity monitoring system of all water use. (Examples: irrigation, indoor plumbing, reclaimed water, boiler usage)
  4. Energy and Atmosphere
    1. Optimize energy performance – Use of low energy systems. (Examples: lighting, refrigeration, appliances)
    2. Advanced energy metering – All electrical use runs through a single meter.
    3. Demand response – Energy use changes throughout the day.
    4. Renewable energy production – Location and connection to the electrical system. (Examples: solar, wind, thermal)
  5. Indoor Environmental Quality
    1. Air quality management – Ventilation and monitoring of air. (Examples: carbon monoxide detectors, exhaust vents, air filtration system)
    2. Interior lighting/daylight – Enhanced interior lighting. (Examples: dimmers, daylight, window shades)
    3. Thermal comfort – Enhanced temperature control for individual comfort. (Examples: localized heating and cooling, circulating fans, radiant flooring)
    4. Acoustic performance – Sound absorbent surfaces are greater than the ceiling area. (Examples: acoustic tiles, acoustic wall panels)
  6. Innovation
    1. Connected building – Design the campus for internet connectivity and connected devices. (Examples: Wi-Fi router, networked registers, inventory systems)
    2. Intelligent inventory – Real-time monitoring of inventory, if applicable. (Examples: shelves with sensors, database connected to registers, exit door scanners)
    3. Security and safety – Enhanced security technology. (Examples: automatic police contact, automatic fire contact, notifications)
    4. Sustainability – Focus on innovative green technologies not included in other categories.

Examples mentioned in the Streamlined Checklist can be found on Revit City or BimSmith. The design is not limited to the examples in the checklist.

Power/AC/Heat Calculations

Use the information from electrical schematics, plumbing schematics, and outside research to:

  1. Calculate the total power usage for the operation of the building per day.
  2. Calculate the energy costs for a typical year.
  3. Determine the total A/C and heating requirements.
    1. To do this, research the power, heat, and AC calculations of buildings that are similar in size and efficiency ratings as the building design
  4. Tabulate this data neatly in a table, graph, or chart that presents the information clearly.
    1. The standard unit of measurement for these power measurements is the kilowatt per hour (kWh).

Microsoft Project

Two separate Microsoft Project schedules must be made; one schedule to manage the progress of the design process and one Construction Schedule outlining the theoretical construction schedule of the building design. Instructions for how to access Microsoft Project can be found on the Software Requirements page of the manual. Learn Microsoft Project by accessing the Microsoft Project Student Guide.

The SLDP Schedule must include all tasks related to the project design from the start to Early or Final Submission. The Microsoft Project schedule should include the following:

  • Minimum of 20 tasks, not including Milestones.
  • Milestones, which should be clearly indicated on the project plan (Duration of zero days).
  • The person responsible for completing the task (Resource names).

The original and updated SLDP Schedules must be included in the Milestone Presentations.

Use the "Copy Picture" function to include the project plan in the presentations. Do not take a screenshot.

  • Gantt charts must be displayed alongside the tasks list (fit onto one slide)
  • Gantt charts must clearly show a progress line
  • Clearly state during the presentation whether the project is on-time, behind schedule, or ahead of schedule

For help in planning the project, review the manual page Planning Project Scheduling & Costs.

The Construction Schedule must include:

  • Clearing site
  • Laying foundation
  • Studs and structural members
  • Wall construction and window installation
  • Painting
  • Electrical wiring and lighting installation
  • Plumbing

Model the schedule after similar sample construction projects.

Drawings

The following paragraphs discuss the drawings required for the project using Revit. No other software will be accepted for submission. Revit is free to download using an NYU email on Autodesk student accounts, and all computers in the EG1004 Model Shop and NYU Tandon computer lab have full copies of the software.

Consult the Revit How-To Guide to create the building design. The How-To Guide contains useful examples for designing the building, but do not copy the instructions for the project as they only serve as examples of the features available in Revit.

Other helpful resources include the Autodesk Revit Knowledge Network. The Linkedin Learning Architectural & Mechanical Guides are also very useful for any questions.

Each floor of the building design must have an accompanying drawing. It must be fully dimensioned and include all aspects of the room design including:

  • All door and window openings
  • Material choices
  • Furniture
  • Lighting fixtures

All electrical and plumbing drawings must include:

  • Wiring, outlets, switches, and light fixtures
  • Sinks and showers
    • Sanitary pipes, hot water pipes, cold water pipes
  • Toilets
    • Sanitary pipes
  • Sprinkler systems

All of the floors must be created in one project file. To design all of the floors in the same file, levels must be added. Click on an elevation view (North, South, East, or West), then, click on Level in the Datum panel of the Architecture tab in the Ribbon. Draw the level elevation with the cursor. The elevation of the level can be changed by editing Elevation in the Properties tab and applying the change in the Offset input. The levels can be viewed by looking at Floor Plans in the Project Browser Tab. Do not create new files for each floor. Only a single Revit file can be used for Submission.

Model

Design the building using Autodesk Revit as the primary design tool. Create a layout to accommodate the items listed in Specifications. Once the design is complete, generate a walk-through video of the campus. Create a walkthrough by clicking on the View tab and then clicking on Walkthrough from the 3D View dropdown in the Create tab Additional 3D printing details can be found in the 3D Printing and Logo Guide. Extra credit can be achieved by 3D printing on the floor plan with only structural elements of that floor. That does not include any furniture.

Figure 3: Example of a classroom in Autodesk Revit

Cost Estimate

Three separate tables (construction, operation, and labor) for cost estimates must be created using the following guidelines:

  • Cost of Construction: Using the wholesale price of all materials and components in the design, calculate the total cost of construction of the building design (not including labor). The materials can be found in the Schedules tab and create a tabulated bill of materials and generate a complete cost estimate for the entire building
  • Cost of Operation: Calculate the total cost of operation per day and per year of the design for reconstruction. Tabulate energy usage and associated costs into a neatly organized table, as described in the Power/AC/Heat Calculations section
  • Labor: Calculate the total cost of labor for the construction of the building. Do not include the cost of labor for operation. Refer to the Construction Schedule to create this estimate. Neatly tabulate the costs into a table

CATME

When working on engineering team projects, peer evaluations and self-evaluations are critical for assessing how effective all contributions are to the project. In EG1004, the recitation professor will use evaluations at each Milestone using a software called the Comprehensive Assessment of Team Member Effectiveness (CATME). More information can be found on the Teamwork Expectations page.

Engineering Notebook

While working on the project, a record of all work done and future plans and goals must be maintained. To complete a Benchmark assessment, show the Engineering Notebook to the Lab/Open Lab TA completing the assessment. For all Milestones and Final Submission, the Engineering Notebook must be approved by the recitation professor and be prepared to make it available to an Open Lab TA in a Word Document (.doc or .dox) format. A guide to writing a notebook, and a basic overview of the expectations and frequency of updates to the notebook, can be found on the Keeping an Engineering Notebook page.

Extra Credit

HIR groups can receive extra credit for:

  • Achieving Platinum LEED certification in the building design.
  • 3D printing the exterior of the building

Additional extra credit opportunities are as follows:

  • Completing Benchmark A, Benchmark B, or Submission early
  • Completing HIR's 3D printing Extra Credit task of printing two stackable adjacent floor plans as described in the 3D Printing and Logo Guide.
    • More details about creating two stackable adjacent floor plans for HIR 3D printing Extra Credit can be found in this Basic Floor Plan Print Guide

Refer to the EG1004 Grading Policy for exact point values. Creativity and innovation are always rewarded. Original designs will receive extra credit.

Milestones, Benchmarks, and Deliverables

As work on your project continues, periodic reports on the progress will be presented in three Milestones. All of the items assigned in each Benchmark are the deliverables. These deliverables often consist of a combination of written submissions, presentations, and demonstrations. Benchmark assessments evaluate the progress of the project.

Note: A benchmark and commission approval from a TA for the project may only be made at the end of the Lab or during Open Lab

Preliminary Design Investigation

The Preliminary Design Investigation (PDI) is extremely important, as it lays the groundwork for the project. The PDI outlines the project idea, inspiration, and goals.

The PDI must include:

An PDI template can be found here. The PDI is due by Benchmark A and can be approved by any Open Lab TA. Do not forget to include the items listed above, but do not feel limited to only these items. Use this link to access the HIR PDI Rubric.

Milestone 1

See How to Give a Milestone Presentation for the format of a Milestone presentation.

Milestone 1 is a presentation of the PDI. It is important that this presentation outlines the project goals and shows that the project is realizable.

The Milestone 1 presentation must include:

  • Company profile
    • Company name
    • Product name
    • Company officer title(s)
    • Mission statement
  • Project objective
    • What is the project about?
    • What tasks are the company aiming to accomplish? (Benchmark A requirements)
    • Overall design approach to complete objective
  • Background information
    • Why is the project happening?
    • What does the audience need to know?
  • Technical design description
    • Brief explanation of the LEED categories being tackled
      • All four required categories
      • Give a few examples on how it will be accomplished
    • Preliminary conceptual drawing of floor plans
      • Rendered and digital sketches are acceptable, CAD not required
  • Cost estimate
    • Cost of construction table
    • Cost of labor table
  • Microsoft Project schedule
    • Click here to access the guide on how to transfer a file
  • Teamwork agreement summary
  • Summary
    • Overall assessment on current state of project
    • Is the project on schedule? Is it on budget?
    • Next steps and future tasks

Look Ahead: What tasks are planned between now and Milestone 2?

Benchmark Assessment A

Benchmarks evaluate the progress of the project. Benchmark A is due at the end of Model Shop Session II. There are penalties for not completing this on time. Refer to the EG1004 Grading Policy for more information.

To pass Benchmark A, the design must complete all of the following:

  • One recreational space Revit design
  • One 40-student classroom Revit design
  • One 20-student classroom Revit design
  • Submit an .STL and a .3mf (Cura Project file) of the company logo through the 3D Printing Submission portal on the EG website
  • Updated Engineering Notebook

Reminder: All of the floors and rooms must be created in one project file.

Milestone 2

See How to Give a Milestone Presentation for the format of a Milestone presentation.

Milestone 2 is a project progress update. It must explain all changes and developments made to date, particularly in regard to Benchmark A. Include whether or not the Benchmark A requirements were completed, and if not, explain why. Also, highlight any planned changes for the design or project, in general.

The Milestone 2 presentation must include:

  • Company profile
    • Company name
    • Product name
    • Company officer title(s)
    • Mission statement
  • Project objective
    • What is the project about?
    • What tasks are the company aiming to accomplish? (Benchmark A/Benchmark B requirements)
    • Overall design approach to complete objective
  • Background information
    • Why is the project happening?
    • What does the audience need to know?
  • Technical design description
    • Explanation of design changes, if any
    • Brief explanation of the LEED categories being tackled
      • All four required categories
      • Show examples of LEED implementations in Revit
    • Revit floor plan drawings
      • Dimensions
      • 1:240 scale
    • Exterior 3D views of building: front, side, and isometric
      • Dimensions
      • Give a few examples on how it will be accomplished
    • Preliminary conceptual drawing of floor plans
  • Cost estimate (previous and current costs)
    • Cost of construction table
    • Cost of labor table
    • What changes were made, if any?
  • Microsoft Project schedule (previous and current)
    • What changes were made, if any?
    • Click here to access the guide on how to transfer a file
  • Summary
    • Overall assessment on current state of project
    • is the project on schedule? Is it on budget?
    • Next steps and future tasks

Look Ahead: What tasks are planned between now and Milestone 3?

Benchmark Assessment B

Benchmark Assessment B is due at the end of Model Shop Session III. There are penalties for not completing this on time. Refer to the EG1004 Grading Policy for more information.

To pass, complete all of the following tasks:

  • One recreational space Revit design
  • All classroom Revit designs
    • Eight 20-student classrooms
    • Ten 40-student classrooms
    • Two 100-student lecture halls
  • Facility of choice Revit design
  • Electrical and plumbing for one dorm room
    • Some of the LEED requirements should be shown in the Revit model
    • Elements of the design that cannot be shown in the Revit model should have a more detailed explanation:
      • Examples of other building projects implementing something similar
      • Explanation of the technology required
      • Justify this decision over more common solutions
  • Have an .STL and a .3mf (Cura Project file) of the company logo approved by a ProtoLab TA through the 3D Printing Submission portal on the EG website. Students must physically go to the ProtoLab before their Modelshop Session 3 to get their logo approved. Logos cannot be approved during Modelshop sessions.
  • Updated Engineering Notebook

Reminder: All of the floors and rooms must be created in one project file.

Milestone 3

See How to Give a Milestone Presentation for the format of a Milestone presentation.

Milestone 3 is the last project progress update. It must explain all changes and developments made to date, particularly in regards to Benchmark B. Include whether or not all Benchmark B requirements were completed, and if not, explain why. Also, highlight any planned changes to the Revit design or project, in general.

Your Milestone 3 presentation must include:

  • Company profile
    • Company name
    • Product name
    • Company officer title(s)
    • Mission statement
  • Project objective
    • What is the project about?
    • What tasks is the company aiming to accomplish? (Benchmark A/Benchmark B requirements)
    • Overall design approach to complete objective
  • Background information
    • Why is the project happening?
    • What does the audience need to know?
  • Technical design description
    • Explanation of design changes, if any
    • Brief explanation of LEED categories being tackled
      • All four required categories
      • Show examples of LEED implementations in Revit
  • Revit floor plans
    • All floor plans
    • Plumbing plan
    • Electrical plan
    • Dimensions
    • 1:240 scale
  • Exterior 3D views of building: front, side, and isometric
    • Dimensions
  • Cost estimate (previous and current costs)
    • Cost of construction table
    • Cost of operations table
    • Cost of labor table
    • What changes were made, if any?
  • Microsoft Project schedule (previous and current)
    • What changes were made, if any?
    • Click here to access the guide on how to transfer a file
  • Summary
    • Overall assessment on current state of project
    • Is the project on schedule? Is it on budget?
    • Next steps and future tasks

Look Ahead: What tasks are planned between now and the completion of the project?

Commissioning

Projects must be commissioned before Submission. Refer to the syllabus for Submission deadlines. There are penalties for not completing this on time. Refer to the EG1004 Grading Policy for more information.

To pass, the design must complete all of the following:

  • Approved and updated Engineering Notebook. The Engineering Notebook can be approved by any Open Lab TA. Make sure significant progress has been made and recorded since Benchmark B.
  • Revit drawings (1:240 scale)
    • Floor plan for all floors
    • Plumbing system (recreational space, one classroom, and one dorm room)
      • In addition to traditional appliances, like sinks, include fire alarms and sprinkler systems.
    • Electrical system (recreational space, one classroom, and one dorm room)
    • Front elevation of the building design
    • Most detailed side view of the building design
    • Be sure to also include each of these requirements in your LEED Accreditation Report
  • Model of building (3D Revit) (1:240 scale)
    • Walk-through video
  • Achieve Gold LEED accreditation
  • A LEED accreditation report
  • Have an .STL file of the company logo printed through the 3D Printing Submission portal on the EG website
  • All 3D prints must be approved by a ProtoLab TA

LEED Accreditation Report

A LEED accreditation report is required for Commissioning. The LEED accreditation report uses different section headers and content than those used int he lab reports, but all LEED accreditation reports must follow the EG1004 style guide. Use this LEED outline accreditation report template with the following outline:

  • Cover Page including a title, project name, and group member names
  • Introduction
    • Short explanation of what LEED is
    • Explain why LEED certification is beneficial
    • Explanation of the project
      • Include screenshots of your Revit model
    • Level of LEED certification being tackled
  • Overview
    • Checklist showcasing what LEED categories are being tackled
      • Can be showcased through a table, checklist, or other form of graphic
  • LEED categories
    • Explanation on how each of the requirements for the category are being implemented
      • Examples of other buildings (only to be done if implementation cannot be showcased through Revit model)
      • Explanations of how and why requirements that cannot be illustrated in the Revit model would be implemented
    • Screenshots of Revit model where these are implemented
    • Drawings showcasing some of the LEED requirements being implemented

Final Presentation

The Final Presentation will be a technical briefing, similar to the Milestones, but also serves as a sales presentation explaining why the company should be selected instead of the competition.

The Final Presentation must include:

  • Company profile
    • Company name
    • Company officer profiles, role(s), and qualifications
    • Mission statement
  • Problem statement
    • Why is the project happening?
    • What does the audience need to know?
  • Project objective
    • What is the purpose of the project?
    • Who does this project help?
    • What problem does the project solve?
  • Project description
    • Specify LEED certification
      • Examples of LEED implementations in Revit
    • Revit drawings
      • All floor plan drawings
      • Dimensions
      • 1:240 scale
    • Views of exterior of building: front elevation, side elevation, isometric elevation
      • Dimensions
  • Market and product viability
    • Does the company have competitors?
    • What makes the project unique?
    • How does the design compare to competitors - cost, quality, features?
    • Is the project versatile?
    • What is the price of the project?
  • Conclusion
    • Reiterating project purpose
    • Highlight project features
    • Future goals of the company
    • Why should the company be awarded this contract?
  • Video pitch

Submission

All SLDPs must be submitted online. Please visit this page for the link to the Project Submission form and each project’s individualized login information. To submit, login to the EG1004 website using this special login information. Submitting with an NYU account or any other account will generate an error. Components may be resubmitted at any time before the deadline. Please note that submission times are based on the most recent submission.

Please note the deliverables for this project are as follows. If any of the following items are omitted, there will be a penalty. Be sure to click "Submit" at the bottom of the form and allow sufficient time for uploading. The following list includes deliverable items that are required:

  • Submission deliverables:
    • Final presentation
    • LEED accreditation report
    • Initial sketches
    • Final drawings of Revit design
      • All floors must have an accompanying drawing
    • Model
    • Walk-through video
    • Final Microsoft Project schedule
    • Final construction schedule
    • Final cost estimates (include all costs - construction, labor, operations)
    • Table with power, A/C, and heat tabulations
    • Resume(s) (no fictitious resumes will be accepted)
    • Final Engineering Notebook

You may resubmit at any time before the deadline. Please note that submission times are based on the most recent submission. Multiple members can update different parts of the form at the same time to expedite the uploading and submission process. Just make sure that whoever submits refreshes the form and confirms all necessary files have been saved to it.


Late Submission

Late submission is not allowed. If a project does not Commission or receive Partial Commission by the deadline set forth in the syllabus, the project will not be allowed to submit and will receive a 0 for the project grade. To receive Partial Commissioning, two TAs must evaluate the project and determine its degree of completion according to the Commissioning requirements and the project will be given a grade accordingly. Please refer to the EG1004 Grading Policy for more information.

Frequently Asked Questions

Q: Can I use a 40-student classroom as a 20-student classroom as well?

A: No, each type of classroom must have a unique design. However, all ten 40-student classrooms can be the same design as each other. The same applies to the 20-student classrooms and 100-student lecture halls.

Q: What's the largest number of floors I can create?

A: The largest number of drawings you feel confident creating before the end of the semester. 100 floors = 100 drawings.

Q: Why am I getting an error when I try to add sanitation pipes to my plumbing plan?

A: Check the Plumbing section of the Revit How-To guide!


References