= Introduction and Overview =
The National Aeronautics and Space Administration (NASA) has recently received strong evidence of volcanic activity on the long-believed volcanically dormant planet, Mars. Radar measurements from the Mars Express spacecraft have detected the presence of a 20 km wide lake of liquid water located underneath a layer of ice in the Planum Australe region. Modern research about the discovery suggests that the only way to maintain water in the liquid state in the conditions present on Mars is with the presence of a magma chamber located underneath the body of liquid water. To explore the possibility of active volcanic activity on the Red Planet, NASA has issued a request for proposal for a Mars Rover Robot (MRR) that is capable of traversing the steep slopes of Olympus Mons, the second tallest mountain and largest volcano in the solar system. This rover will dig near the base of the volcano and photograph it from its peak. By studying the data obtained, NASA hopes to understand the past volcanic activity of the planet and use that data to weigh the possibility of present-day volcanic activity.
The mission has two parts that must be completed. The first part is to collect a rock sample and bring it back to the start tile for analysis. The second part of the mission involves climbing to the peak of Olympus Mons to take a picture of the surrounding environment. To complete the mission, a sensor must be used to increase the accuracy of the rover's movement.
= Specifications =
Design a robot using Fusion 360 as the primary design tool. The robot must meet the following specifications:
*Size & Material Constraints
**The robot must fit within a 15" x 15" footprint.
**The design must use the materials provided. A cost estimate of the robot’s components must be created and all revisions to the cost estimate must be recorded and explained.
** The robot must use '''no more than two motors.'''
*Sensor Requirement
**The design must incorporate a sensor. This could be a gyro, ultrasonic, touch or IR obstacle sensor.
*Microcontroller Requirement
**The robot’s movements must be directed by an Arduino program. All revisions to the Arduino program must be recorded and explained.
*Autonomous Navigation
**The robot must be fully autonomous, and so cannot be touched during testing. The Arduino program may not be altered or switched during any part of the mission.
<!--Your team must build a model of your design using the materials provided. An Arduino program that will direct the robot's movements must be created. A cost estimate of the robot's components must be provided. All revisions to the original design must be recorded and explained. This includes technical design drawings as well as cost estimates. All revisions to the Arduino program must be recorded and explained.
The MRR must be able to move autonomously over the course, pick up the rock sample, and return to the start point, all while using a sensor. The sensor can be a gyro sensor, ultrasonic sensor, or touch sensor. The robot must traverse to the highest peak of the course. For extra credit, the robot can traverse the secondary ramp and return to the start tile. In completing the extra credit, the robot must descend the primary ramp similar to how it ascended it for Commissioning. <b>The robot cannot jump off the primary ramp directly to the secondary ramp.</b> The robot must fit within a 15 in &times; 15 in footprint. These specifications must be met for final Commissioning.
The robot's Arduino program may not be altered or switched during any part of the mission. Likewise, the robot must be fully autonomous, and therefore cannot be touched by any person during testing.-->
Please refer to the course syllabus for all due dates.
'''<span style="color: red;">Please note that this project aims to reflect certain real-life scenarios; the robot must be able to handle minor imperfections in the course. Any attempt to physically step on the course or have the robot drive off a cliff is unsafe and will result in a point penalty in the final project grade.</span>'''
== Course Layout ==
The MRR course (Figure 1) consists of two primary ramps, labeled Ramps 2 and 3, and one additional ramp, Ramp 1. The robot must traverse the uneven terrain to reach the rock sample, return to the Start tile, and traverse Ramps 2 and 3 and come to a complete stop at the peak. For extra credit, the robot can traverse Ramp 1, incorporate an additional sensor, and/or return to the start tile at the end of the run. In completing the extra credit, the robot must descend on the primary ramp for Commissioning.<b> The robot cannot jump off the primary ramp directly to Ramp 1.</b>
<!--<b>Ramp 1</b> is the secondary ramp that can be traversed for extra credit. <b>Ramps 2 and 3</b> comprise the primary ramp that must be traversed for Commissioning.-->
[[Image:MRR_Labeled.png|thumb|650px|frame|center|Figure 1: View of MRR Course]]
{{SLDP: Microsoft Project}}
== Drawings ==
All drawings and sketches should be made using the Assembly tool in Fusion 360. Fusion 360 can be downloaded for free from the [https://www.autodesk.com/products/fusion-360/students-teachers-educators Autodesk website] using an NYU email or accessed from any computer in the Modelshop during Open Lab hours.
Using Fusion 360, create four drawings of the robot: front, top, most detailed side, and a drawing of the gear train(s). Sensors, motors, and gears must be included in each drawing. Smaller pieces such as nuts, bolts, and axles may be omitted from the drawings.
Each revision of the design must be documented and all changes must be presented during Milestone presentations.
[[Image:Vex_mrr.png|thumb|400px|frame|center|Figure 2: Example Drawing of VEX MRR]]
== Model ==
Build a scale model (1:1) of the design. The following materials will be provided:
# VEX robotics pieces
# Basic electronics prototyping kit
# Sensors
# Motors
The finished MRR must not exceed a footprint of 15" × 15". There is no height limitation. Any additional components that the MRR is equipped with must also fit within the footprint. Additional materials can be supplied by a TA.
{{SLDP: Cost Estimate (VEX)}}
== CATME ==
When working on engineering team projects, peer evaluations and self-evaluations are critical for assessing how effective individual contributions are to the project. In this course, the recitation professor will use evaluations at each Milestone using a software called the Comprehensive Assessment of Team Member Effectiveness (CATME). More information can be found on the [[Teamwork Expectations]] page.
== Engineering Notebook ==
All work done on the project and future plans and goals must be documented in an Engineering Notebook. To complete a Benchmark assessment, the Engineering Notebook must be presented to the Open Lab TA completing the assessment. For Milestone 1, Milestone 2, Milestone 3, and Early or Final Submission, the Engineering Notebook must be approved by the recitation professor and be prepared to make it available to an Open Lab TA in a Word Document (.docx) format. A guide to writing the notebook and a basic overview of the expectations and frequency at which the Engineering Notebook must be updated can be found on the [[Keeping an Engineering Notebook]] page.
== Extra Credit ==
The tasks listed below show the opportunities to receive extra credit at commissioning:
* Returning to the Start tile at the end of the entire run. If completing multiple extra credit tasks, returning to the Start tile should be the final task completed.
* Traversing the secondary ramp (Ramp 1). The robot must be able to descend the primary ramp similar to how it ascended the ramp for commissioning. '''For safety reasons, the robot cannot jump off the primary ramp directly to Ramp 1.'''
* Implementing an additional sensor
Additional extra credit opportunities are as follows:
* Completing Early Submission
Refer to the [[EG1004 Grading Policy]] for exact point values. Creativity and innovation are always rewarded. Original designs will receive extra credit.
{{SLDP: Milestones and Benchmarks}}
{{SLDP: Milestone 1 (Robots)}}
{{SLDP: Benchmark A}}
* Robot reaches the rock sample (the robot does not have to pick it up)
* PDI
* Initial CAD model
* Submit an .STL and a .3mf (Bambu Studio Project file) of the company logo through the 3D Printing Submission portal on the EG website
** <b>The [[3D Printing and Logo Guide]] contains information on the 3D printing requirements and guidelines.</b>
** The ProtoLab schedule is available on the [[3D Printing and Logo Guide]]
* Updated Engineering Notebook
== Milestone 2 ==
'''<span style="color: red;">See [[Media:Eg_milestones.pptx|How To Give a Milestone Presentation]] for the format of a Milestone presentation.</span>'''
Milestone 2 will be a project progress update. It must explain all changes and developments made to date, particularly in regards to Benchmark A. Include whether or not Benchmark A requirements are completed, and if not, explain why. Also, highlight any changes you plan on making to your design or project, in general.
The Milestone 2 presentation must include:
* Company profile
** Company name
** Product name
** Company officer title(s)
** Mission statement
* Project objective
** What is the project about?
** What tasks is the company aiming to accomplish? (Benchmark A/Benchmark B requirements)
** Overall design approach to complete objective
* Background information
** Why is the project happening?
** What does the audience need to know?
* Technical design description
** Explanation of design changes, if any
** CAD drawings: top, front, most detailed side, isometric, and gear train view
** Circuit and schematic diagram(s)
** Relevant pictures
** Flowchart of code
* Cost estimate (previous and current costs)
** Major components of design listed
** Miscellaneous category listed
** Projected labor listed
** What changes were made, if any?
* Microsoft Project schedule (previous and current)
** What changes were made, if any?
** Click [https://nyu.service-now.com/sp?id=kb_article&sysparm_article=KB0018302&sys_kb_id=b996a7281b6210906441c8c11a4bcbce&spa=1| here] to access the guide on how to transfer a file
* Summary
** Overall assessment on current state of project
** Is the project on schedule? Is it on budget?
** Next steps and future tasks
{{SLDP: Benchmark B}}
* Rock sample is carried by the robot
* Robot returns to the Start tile
*Implement and use a sensor to aid the robot's navigation
* Updated CAD model
* Have an .STL and a .3mf (Bambu Studio Project file) of the company logo approved by a ProtoLab TA through the 3D Printing Submission portal on the EG website. Students must physically go to the ProtoLab before Modelshop Session 3 to get the logo approved. Logos cannot be approved during Modelshop sessions.
** <b>The [[3D Printing and Logo Guide]] contains information on the 3D printing requirements and guidelines</b>
** The ProtoLab schedule is available on the [[3D Printing and Logo Guide]]
* Updated Engineering Notebook
== Milestone 3 ==
'''<span style="color: red;">See [[Media:Eg_milestones.pptx|How To Give a Milestone Presentation]] for the format of a Milestone presentation.</span>'''
Milestone 3 will be the last project progress update. It must explain all changes and developments made to date, particularly in regards to Benchmark B. Include whether or not Benchmark B requirements are completed, and if not, explain why. Also, highlight any changes you plan on making to your design or project, in general.
The Milestone 3 presentation must include:
* Company profile
** Company name
** Product name
** Company officer title(s)
** Mission statement
* Project objective
** What is the project about?
** What tasks is the company aiming to accomplish? (Benchmark A/Benchmark B requirements)
** Overall design approach to complete objective
* Background information
** Why is the project happening?
** What does the audience need to know?
* Technical design description
** Explanation of design changes, if any
** CAD drawings: top, front, most detailed side, isometric, and gear train view
** Circuit and schematic diagram(s)
** Relevant pictures
** Flowchart of code
* Cost estimate (previous and current costs)
** Major components of design listed
** Miscellaneous category listed
** Projected labor listed
** What changes were made, if any?
* Microsoft Project schedule (previous and current)
** What changes were made, if any?
** Click [https://nyu.service-now.com/sp?id=kb_article&sysparm_article=KB0018302&sys_kb_id=b996a7281b6210906441c8c11a4bcbce&spa=1| here] to access the guide on how to transfer a file
* Summary
** Overall assessment on current state of project
** Is the project on schedule? Is it on budget?
** Next steps and future tasks
{{SLDP: Commissioning}}
* Complete tasks for Benchmarks A and B
* Robot reaches the highest point of the mountain
** The robot must come to a complete stop at the peak
* Robot meets all specifications
* Finalized CAD model
* Have an .STL file of the company logo printed through the 3D Printing Submission portal on the EG website
** <b>The [[3D Printing and Logo Guide]] contains information on the 3D printing requirements and guidelines</b>
** The ProtoLab schedule is available on the [[3D Printing and Logo Guide]]
* All 3D prints must be approved by a ProtoLab TA
* Updated Engineering Notebook
'''The robot must complete the required tasks in a single run to obtain full credit for commissioning.'''
= Final Design Report =
The Final Design Report (FDR) provides a comprehensive overview of the project process and developments from initial brainstorm to finished prototype. All project expectations and outcomes must be clearly detailed in the document. This report will also provide documentation experience useful for completing a Senior Design final report and other projects.
The FDR must include the following documentation:
* CAD drawings
* Wiring diagrams
* Project schedule
* Cost estimate
The FDR uses different section headers and content than those in the lab reports, but all FDRs must follow the [[Media:EG_1004_Writing_Style_Guide.pdf| EG1004 Writing Style Guide]]. Use this [[Media:MRR_Final_Design_Report.docx|FDR]] template with the following outline:
* Introduction
**  Purpose of Project
**  Background
* Requirements
** Physical Components
** Software Components
* Procedures
** Physical Construction
** Software Setup
** Software Troubleshooting
* Milestone and Final Product Requirements
** Benchmark A Requirements
** Benchmark B Requirements
** Final Submission Requirements
** Human Resources and Training (e.g. TA expertise utilized, etc.)
* Results
** Benchmark A Results
** Benchmark B Results
** Difficulties Experienced
* Conclusion
** Results of Project
** Future Improvements
The FDR is due at the time of submission.
{{SLDP: Final Presentation MRR}}
{{SLDP: Submission}}
** Final presentation
** Final Arduino program
** Final circuit diagrams
** Initial sketch
** All the drawings of the design (initial through final)
** Video
** Final Microsoft Project schedule
** Final cost estimate
** Resume(s) (no fictitious resumes will be accepted)
** Final notebook/project journal
** Final Design Report
Please note that submission times are based on the most recent submission.
{{SLDP: Early Acceptance}}
{{SLDP: Late Delivery}}
= Frequently Asked Questions =
<b>Q: Is stepping on the course allowed as it is difficult to retrieve a robot from the middle of the course due to its size?</b>
A: No. If needed,  ask a TA for assistance.
<b>Q: Can the course be bumped if the robot gets stuck?</b>
A: No. It is not possible to bump Mars, so bumping the course is not an option.
<b>Q: Can rubber bands be used on the wheels for more traction?</b>
A: Yes. This is highly encouraged, especially when dealing with slopes.
<b>Q: All the VEX parts are really big. Is there a size constraint?</b>
A: There is a size limitation of a 15 in &times; 15 in footprint. Exceeding this constraint is okay, but it may create difficulties in navigating the robot through the course.
<b>Q: Can more than 2 motors be used?</b>
A: '''No.''' Robot designs are limited to two motors.
<b>Q: Can the robot jump from one hill to another?</b>
A: <b>No.</b> This will cause damage to both the robot and course and is also unsafe. If the robot does this, the trial will be invalidated and the project may receive point penalties to the final project grade.
<b>Q: What is the best way to start building the robot? </b>
A: For help with building, refer to the [[VEX How-To Manual]].
{{Semester-Long Design Project}}
<!--{{SLDP: RFP|Mars Rover Robot (MRR)}}


{{SLDP: Real-life Scenarios (Robots)}}
{{SLDP: Real-life Scenarios (Robots)}}
Line 8: Line 301:
The United States National Aeronautics and Space Administration (NASA) has received increased funding and have been able to reinstate the Constellation program. To help accelerate the process of development, NASA has issued an RFP (request for proposal) for a rover that will be used in the first of the Constellation missions. This rover will provide data about the landing site and begin preparations of the surrounding area to aid the manned missions arriving 26 months later. The robot should be able to get an accurate salinity reading of any water source, collect soil samples, travel across uneven terrain, and return to the landing site.
The United States National Aeronautics and Space Administration (NASA) has received increased funding and have been able to reinstate the Constellation program. To help accelerate the process of development, NASA has issued an RFP (request for proposal) for a rover that will be used in the first of the Constellation missions. This rover will provide data about the landing site and begin preparations of the surrounding area to aid the manned missions arriving 26 months later. The robot should be able to get an accurate salinity reading of any water source, collect soil samples, travel across uneven terrain, and return to the landing site.


The mission has two parts that must be completed. The first part uses a salinity sensor to measure the salt content of one water source and a soil collection module to collect a soil sample, both taken by an autonomous robot (see Course Specifications for more details). The second part of this mission involves analyzing a water source and a soil sample. The water must be tested for salt content. There are two soil tests that the robot can choose from: a pH test and a compounds separation test. Once the tests are done, a conclusion must be reached about whether life can exist in the water sources on Mars, and (depending on the soil test) whether plants can potentially grow in the soil and/or if there is enough Fe2O3 and Fe3O4 to produce an adequate amount of rocket fuel.
The mission has two parts that must be completed. The first part uses a salinity sensor to measure the salt content of one water source and a soil collection module to collect a soil sample, both taken by an autonomous robot (see Course Specifications for more details). The second part of this mission involves analyzing a water source and a soil sample. The water must be tested for salt content. There are two soil tests that the robot can choose from: a pH test and a compounds separation test. Once the tests are done, a conclusion must be reached about whether life can exist in the water sources on Mars, and (depending on the soil test) whether plants can potentially grow in the soil and/or if there is enough Fe<sub>2</sub>O<sub>3</sub> and Fe<sub>3</sub>O<sub>4</sub> to produce an adequate amount of rocket fuel.


= Course Specifications =
= Course Specifications =
Design a robot using Lego Digital Designer as your primary design tool. A model of your design must be built using the materials provided. A Mindstorms program that will direct the robot's movements must be created. A cost estimate of the robot's components must be provided. All revisions to the original design must be recorded and explained. This includes technical design drawings and cost estimates. All revisions to the Mindstorms program must be recorded and explained.
Design a robot using Lego Digital Designer as your primary design tool. A model of your design must be built using the materials provided. A Mindstorms program that will direct the robot's movements must be created. A cost estimate of the robot's components must be provided. All revisions to the original design must be recorded and explained. This includes technical design drawings and cost estimates. All revisions to the Mindstorms program must be recorded and explained.


The Mars Rover Robot (MRR) must be able to move autonomously over the surface of Mars and collect salinity readings from a water source and a soil reading from a soil sample. Salinity readings will be taken using a salinity sensor while soil readings will be taken using a soil collection module. The robot must return to start to pick up the next module/sensor; if the robot can hold both the sensor and module while traversing the course, there is no need to go back to start between readings. The NXT adapter must be fixed to the robot at all times. The robot must finish in the start area, which is 11” by 11”. There is no height restriction. The part of the robot containing the Vernier sensor and collection modules must also fit within the size specifications.  
The Mars Rover Robot (MRR) must be able to move autonomously over the surface of Mars and collect salinity readings from a water source and a soil reading from a soil sample. Salinity readings will be taken using a salinity sensor while soil readings will be taken using a soil collection module. The robot must return to start to pick up the next module/sensor; if the robot can hold both the sensor and module while traversing the course, there is no need to go back to start between readings. The NXT adapter must be fixed to the robot at all times. The robot must finish in the start area, which is 25 cm by 25 cm. There is no height restriction. The part of the robot containing the Vernier sensor and collection modules must also fit within the size specifications.  


Projectile (catapult, slingshot) designs are not allowed.
Projectile (catapult, slingshot) designs are not allowed.
Line 26: Line 319:
** Salinity sensor must be dipped into the water sample by the robot
** Salinity sensor must be dipped into the water sample by the robot
* Collect one soil sample from a dig site using a collection module
* Collect one soil sample from a dig site using a collection module
** The robot must carry the collection module from the Start tile to the dig site
** The robot must carry the collection module '''from the Start tile to the dig site'''
** Soil collection modules can be placed by hand onto the soil sample once the robot comes within 2 cm of the sample  
** Soil collection modules can be placed by hand onto the soil sample once the robot comes within 2 cm of the sample  
** Collection modules are color coded; refer to the layout to determine which module to use
** Collection modules are color coded; refer to the layout to determine which module to use
Line 36: Line 329:
== Extra Credit ==
== Extra Credit ==
Extra Credit will be awarded if:
Extra Credit will be awarded if:
*A second different type of soil sample is taken
*The robot obtains 3 readings (at least 1 soil and 1 water)
**The corresponding test must also be done to get extra credit
*The robot crosses the canyon
*The robot travels up and down the mountain
*The robot takes a reading from an extra credit tile
*The robot takes a reading from an extra credit tile
*The robot crosses the canyon
**This means the robot completely enters on one side and exits from the opposing side
**All four wheels must cross the canyon


== Layout ==
== Layout ==
[[Image:Mrr_F2016_layout.jpg|thumb|500px|center|Figure 2: Labeled Mars Rover Course Map]]
[[Image:Labelled-mrr-super-correct.jpg|thumb|600px|center|Figure 2: Mars Rover Course Map]]


{{SLDP: Microsoft Project}}
{{SLDP: Microsoft Project}}
Line 59: Line 350:
# Motors  
# Motors  
# Salinity sensor*
# Salinity sensor*
# NXT Sensor Adapter
# NXT Sensor Adapter (you won't need this until you're working on MRR Part 2)
# Two soil collection modules
# Two soil collection modules


Line 72: Line 363:
= Data Specifications =
= Data Specifications =
== Overview ==
== Overview ==
'''Part 2 is now available. Download the [[Media:MRR_Part_2_Template.docx|Part 2 Template]] and complete all applicable questions before submitting the final folder.'''   
'''Download the [[Media:MARS ROVER ROBOT_DATA SPECIFICATIONS SHEET.pdf|Part 2 Template]] and complete all applicable questions before submitting the final folder.'''   


The second part of the mission is to:
The second part of the mission is to:
* Analyze a water sample’s salinity and specific gravity to determine if life can exist in the waters of Mars
* Analyze 3 water samples' salinities and specific gravities to determine if life can exist in the waters of Mars
* Analyze a soil sample depending on which dig site(s) the robot traveled to:
* Analyze a soil sample depending on which dig site(s) the robot traveled to:
** pH Test: Test the pH to determine if plants/vegetables can grow, and if possible, state 3 different potential plants/vegetables that could be planted
** pH Test: Test the pH to determine if plants/vegetables can grow, and if possible, state 3 different potential plants/vegetables that could be planted
** Fuel (Separation) Test: Separate out the <math>Fe_3O_4</math> in a soil sample to determine how much rocket fuel can be made
** Fuel Test: Analyze a sample of Fe<sub>2</sub>O<sub>3</sub> and a sample of Fe<sub>3</sub>O<sub>4</sub> to determine how much rocket fuel can be made


== Background Information ==
== Background Information ==
Line 135: Line 426:


=== Magnetite, Hematite, and Wustite ===
=== Magnetite, Hematite, and Wustite ===
The issue that plagues a voyage to Mars is the amount of resources necessary for the astronauts to have a successful return trip. The inherent weight of the fuel alone makes the trip exceptionally difficult. However, as unmanned missions have progressed the presence of Hematite (Fe<sub>2</sub>O<sub>3</sub>) and Wustite (FeO) on the surface of Mars brings a new hope to a mission of this sort.
The issue that plagues a voyage to Mars is the number of resources necessary for the astronauts to have a successful return trip. The inherent weight of the fuel alone makes the trip exceptionally difficult. However, as unmanned missions have progressed the presence of '''hematite''' (Fe<sub>2</sub>O<sub>3</sub>) and '''wustite''' (FeO) on the surface of Mars brings a new hope to a mission of this sort.
For the majority of rockets, pressurized hydrogen is the main source of fuel. Its high potential energy, relatively low weight, and abundance make it an ideal choice. On Mars there is an abundance of both Hematite and Wustite. Hematite, a reddish black mineral consisting of ferric oxide, and Wustite, a greenish gray crystallite, are the two martian components required. Prior to the creation of the hydrogen fuel, the Hematite and hydrogen must be reacted to create Magnetite (Fe<sub>3</sub>O<sub>4</sub>). With Magnetite and Wustite, hydrogen can be created and so the rocket fuel.  On Mars this process is an in-situ, on location, production of oxygen, hydrogen, and carbon monoxide through a two-step thermochemical splitting process or redox cycle.  In this process, hydrogen reacts with Hematite to form magnetite which is combined with water to create hydrogen.  The chemical equations can be seen below:
For the majority of rockets, pressurized hydrogen (H<sub>2</sub>) is the main source of fuel. Its high potential energy, relatively low weight, and abundance make it an ideal choice. On Mars, there is an abundance of both hematite and wustite. Hematite, a reddish black mineral consisting of ferric oxide, and wustite, a greenish gray crystallite, are the two martian components required. Prior to the creation of the hydrogen fuel, the hematite and hydrogen must be reacted to create '''magnetite''' (Fe<sub>3</sub>O<sub>4</sub>). With magnetite and wustite, hydrogen can be created, which is a form of rocket fuel.  On Mars this process is an in-situ, on location, production of oxygen, hydrogen, and carbon monoxide through a two-step thermochemical splitting process or redox cycle.  In this process, hydrogen reacts with magnetite to form wustite, which is then combined with water to create hydrogen.  The chemical equations can be seen below:
* <math>3Fe_2O_3 + CO \rightarrow 2Fe_3O_4 + CO_2</math>
* <math>Fe_3O_4 (+ energy) \rightarrow 3FeO + \frac{1}{2}O_2</math>
* <math>Fe_3O_4 (+ energy) \rightarrow 3FeO + \frac{1}{2}O_2</math>
* <math>3FeO + H_2O \rightarrow Fe_3O_4 + H_2</math>
* <math>3FeO + H_2O \rightarrow Fe_3O_4 + H_2</math>


The samples in this course consist of Fe<sub>3</sub>O<sub>4</sub> and soluble compound. The amount of H<sub>2</sub> (rocket fuel) can be determined from the amount of Fe<sub>3</sub>O<sub>4</sub> found in the sample by using the above chemical reactions.
The samples in this course consist of Fe<sub>2</sub>O<sub>3</sub> and Fe<sub>3</sub>O<sub>4</sub>. The amount of H<sub>2</sub> (rocket fuel) can be determined from the amount of Fe<sub>2</sub>O<sub>3</sub> and Fe<sub>3</sub>O<sub>4</sub> found in the sample by using the above chemical reactions.
[[Image:Mrr_rocket.JPG|thumb|500px|center|Figure 9: Space shuttle launch on May 31, 2008]]
[[Image:Mrr_rocket.JPG|thumb|500px|center|Figure 9: SpaceX's Falcon Heavy launch on February 6, 2018]]


== Obtaining and Analyzing Data ==
== Obtaining and Analyzing Data ==
Line 153: Line 445:
**pH indicator
**pH indicator
**A stirring stick
**A stirring stick
*Fuel Test
*For Fuel Test
** One 100 mL beaker filled with black iron oxide and a soluble compound
** One packet of Fe<sub>2</sub>O<sub>3</sub>
** One beaker of water
** One packet of Fe<sub>3</sub>O<sub>4</sub>
** An empty beaker
** One empty packet (to tare)
** A bar magnet
** A scale
** A scale
** A stirring stick


== Testing Procedures ==
== Testing Procedures ==
Line 165: Line 455:


Fuel Test (Yellow Soil Sample)
Fuel Test (Yellow Soil Sample)
* A mixture of Fe<sub>3</sub>O<sub>4</sub> and soluble powder must be separated in order to find out how much rocket fuel can be produced by the sample found on Mars
* A packet of Fe<sub>2</sub>O<sub>3</sub> and a packet of Fe<sub>3</sub>O<sub>4</sub> must be weighed in order to find out how much rocket fuel can be produced by the samples found on Mars
** Knowing that the red compound in the mixture is soluble and black compound is magnetic, utilize the beaker of water, magnet, and heat lamp to separate out the Fe<sub>3</sub>O<sub>4</sub>.
** Tare the scale using the empty packet
*** Pour water from the water beaker into the beaker with the mixture to dissolve the red compound
** Mass the packet of Fe<sub>2</sub>O<sub>3</sub>
*** Swirl the magnet in the mixture to pick up the black compound and scrap it into the now-empty water beaker
** Mass the packet of Fe<sub>3</sub>O<sub>4</sub>
*** Leave the beaker with the black compound under the heat lamp for a few minutes to evaporate as much water as possible
*** Mass an empty beaker on the scale to tare it to zero
*** Mass the beaker with the black compound to find how much Fe<sub>3</sub>O<sub>4</sub> is in the sample
** Calculate how much rocket fuel can be created and answer Analysis questions accordingly
** Calculate how much rocket fuel can be created and answer Analysis questions accordingly
pH Test (Red Soil Sample)
pH Test (Red Soil Sample)
Line 190: Line 477:


== Analysis ==
== Analysis ==
In the [[Media:MRR_Part_2_Template.docx|Part 2 template]], answer the following questions. Only answer questions for the tests performed:
In the [[Media:MARS ROVER ROBOT_DATA SPECIFICATIONS SHEET.pdf|Part 2 template]], answer the following questions. Only answer questions for the tests performed:
 
* Salinity Test
* Salinity Test
** What are the salinities of the three samples?
** What are the salinities of the three samples?
** Based off of the samples' salinities and specific gravities, which, if any, of the water samples are habitable for freshwater fish? saltwater fish?
** The salinity of the great lakes is at most 0.60 ppt, the salinity of the Atlantic ocean is 37 ppt. Just based on salinity is it reasonable to suspect that fish can survive in the salinity conditions of these waters?
*** Both the salinity and specific gravity must allow for life in order to conclude that life can exist.
** Name 3 examples of how salinity impacts the environment on Earth? Both on land and in water.
** Would euryhalines survive? How about halophiles?
*pH Test
*pH Test
** What is the number on the sample's beaker?
** What is the pH of the sample?
** What is the pH of the sample?
** Can plants survive in this pH? If so, name three plants that could potentially be planted.
** Can plants survive in this pH? If so, name three plants that could potentially be planted.
*Fuel Test
*Fuel Test
** How much Fe<sub>2</sub>O<sub>3</sub> (in grams) was found in the sample?
** How much Fe<sub>3</sub>O<sub>4</sub> (in grams) was found in the sample?
** How much Fe<sub>3</sub>O<sub>4</sub> (in grams) was found in the sample?
** How much fuel (H<sub>2</sub>) can be produced (in grams) by the Fe<sub>3</sub>O<sub>4</sub> found in the sample?
** How much fuel (H<sub>2</sub>) can be produced (in grams) by the Fe<sub>2</sub>O<sub>3</sub> and Fe<sub>3</sub>O<sub>4</sub> found in the sample? Show calculations.
** How much Fe<sub>2</sub>O<sub>3</sub> (in kilograms) is needed to produced 5kg of (H<sub>2</sub>)? Show calculations.


Show all the formulas and calculations used to answer the questions as well as a few sentences explaining the calculations and the thought process. A simple formula and calculation will not suffice. Please note that these questions do require some critical thinking.
Show all the formulas and calculations used to answer the questions as well as a few sentences explaining the calculations and the thought process. A simple formula and calculation will not suffice. Please note that these questions do require some critical thinking.


'''<nowiki>*</nowiki> Please remember to save all documents from part two (questions and answers) because they are required in the final submission folder. '''
'''<nowiki>*</nowiki> Please remember to save all documents from part two (questions and answers) because they are required for final submission. '''


{{SLDP: Milestones and Benchmarks}}
{{SLDP: Milestones and Benchmarks}}
Line 213: Line 503:


{{SLDP: Benchmark A}}
{{SLDP: Benchmark A}}
* Obtain a reading from any of the six available sources
* Obtain one soil reading from any of the four available soil sources


{{SLDP: Milestone 2 (Robots)}}
{{SLDP: Milestone 2 (Robots)}}


{{SLDP: Benchmark B}}
{{SLDP: Benchmark B}}
* Obtain a first reading from any of the six available sources
* Obtain a first soil reading from any of the four available soil sources
* Return to the landing site to pick up module and/or salinity sensor if necessary
* Return to the landing site to pick up salinity sensor if necessary
* Obtain second reading from a sample of a different type:
* Obtain a second reading from a water source
** If first reading was water, next sample must be soil
** If first reading was soil, next sample must be water


{{SLDP: Milestone 3 (Robots)}}
{{SLDP: Milestone 3 (Robots)}}


{{SLDP: Commissioning}}
{{SLDP: Commissioning}}
* Obtain a first reading from any of the six available sources
* Obtain a water and soil reading
* Return to landing site to pick up module and/or salinity sensor if necessary
* Return to the landing site
* Obtain a second reading from a sample of a different type:
* Conduct all corresponding tests
** If first reading was water, next sample must be soil
* Completed [[Media:MARS ROVER ROBOT_DATA SPECIFICATIONS SHEET.pdf|Part 2 Template]] of test results from [[#Analysis|Data Specifications: Analysis]]
** If first reading was soil, next sample must be water
**NOTE: UAI students do NOT need to complete Part 2 in order to commission
* Return to landing site at the end
 
*: '''<span style="text-decoration: underline;">Note</span>''': All questions and answers (including formulas and calculations as well as explanations) must be neatly typed on a MS Word Document.


{{SLDP: Final Presentation}}
{{SLDP: Final Presentation}}
Line 248: Line 535:
{{SLDP: Submission}}
{{SLDP: Submission}}
** Final presentation
** Final presentation
** Cover page and table of contents
** Final Mindstorms program
** Final Mindstorms program
** Initial sketch
** Initial sketch
Line 256: Line 542:
** Final cost estimate
** Final cost estimate
** Resume(s) (No fictitious resumes will be accepted.)
** Resume(s) (No fictitious resumes will be accepted.)
** Microsoft Word document of test results from [[#Main Tasks 2|Data Specifications: Main Tasks]]
** Completed [[Media:MARS ROVER ROBOT_DATA SPECIFICATIONS SHEET.pdf|Part 2 Template]] of test results from [[#Analysis|Data Specifications: Analysis]]


{{SLDP: Early Acceptance}}
{{SLDP: Early Acceptance}}
Line 318: Line 604:
{{Reflist}}
{{Reflist}}


{{Semester-Long Design Project}}
{{Semester-Long Design Project}}-->

Latest revision as of 11:07, 4 March 2024

Request for Proposal: Mars Rover Robot (MRR)



Introduction and Overview

The National Aeronautics and Space Administration (NASA) has recently received strong evidence of volcanic activity on the long-believed volcanically dormant planet, Mars. Radar measurements from the Mars Express spacecraft have detected the presence of a 20 km wide lake of liquid water located underneath a layer of ice in the Planum Australe region. Modern research about the discovery suggests that the only way to maintain water in the liquid state in the conditions present on Mars is with the presence of a magma chamber located underneath the body of liquid water. To explore the possibility of active volcanic activity on the Red Planet, NASA has issued a request for proposal for a Mars Rover Robot (MRR) that is capable of traversing the steep slopes of Olympus Mons, the second tallest mountain and largest volcano in the solar system. This rover will dig near the base of the volcano and photograph it from its peak. By studying the data obtained, NASA hopes to understand the past volcanic activity of the planet and use that data to weigh the possibility of present-day volcanic activity.

The mission has two parts that must be completed. The first part is to collect a rock sample and bring it back to the start tile for analysis. The second part of the mission involves climbing to the peak of Olympus Mons to take a picture of the surrounding environment. To complete the mission, a sensor must be used to increase the accuracy of the rover's movement.

Specifications

Design a robot using Fusion 360 as the primary design tool. The robot must meet the following specifications:

  • Size & Material Constraints
    • The robot must fit within a 15" x 15" footprint.
    • The design must use the materials provided. A cost estimate of the robot’s components must be created and all revisions to the cost estimate must be recorded and explained.
    • The robot must use no more than two motors.
  • Sensor Requirement
    • The design must incorporate a sensor. This could be a gyro, ultrasonic, touch or IR obstacle sensor.
  • Microcontroller Requirement
    • The robot’s movements must be directed by an Arduino program. All revisions to the Arduino program must be recorded and explained.
  • Autonomous Navigation
    • The robot must be fully autonomous, and so cannot be touched during testing. The Arduino program may not be altered or switched during any part of the mission.


Please refer to the course syllabus for all due dates.

Please note that this project aims to reflect certain real-life scenarios; the robot must be able to handle minor imperfections in the course. Any attempt to physically step on the course or have the robot drive off a cliff is unsafe and will result in a point penalty in the final project grade.

Course Layout

The MRR course (Figure 1) consists of two primary ramps, labeled Ramps 2 and 3, and one additional ramp, Ramp 1. The robot must traverse the uneven terrain to reach the rock sample, return to the Start tile, and traverse Ramps 2 and 3 and come to a complete stop at the peak. For extra credit, the robot can traverse Ramp 1, incorporate an additional sensor, and/or return to the start tile at the end of the run. In completing the extra credit, the robot must descend on the primary ramp for Commissioning. The robot cannot jump off the primary ramp directly to Ramp 1.


Figure 1: View of MRR Course

Microsoft Project

A project schedule must be created in Microsoft Project. Learn to use Microsoft Project by accessing the Microsoft Project Student Guide. This schedule must include all tasks related to the project from the start of the project to Early or Final submission. Click here to access the guide on how to transfer a file. The Microsoft Project schedule should include:

  • Minimum of 20 tasks, excluding Milestones
  • Milestones should be clearly indicated on the project plan (duration of zero days)
  • Each task must include the person responsible for completing the task (resource names)
  • Use the "Copy Picture" function to include the schedule in the presentations. Do not take a screenshot
  • Gantt chart must be displayed alongside the tasks list (fit onto one slide)
  • Gantt chart must show a progress line
  • Clearly state during the presentations whether the project is on-time, behind schedule, or ahead of schedule

For help planning the project, review the manual page Planning Project Scheduling & Costs.

Drawings

All drawings and sketches should be made using the Assembly tool in Fusion 360. Fusion 360 can be downloaded for free from the Autodesk website using an NYU email or accessed from any computer in the Modelshop during Open Lab hours.

Using Fusion 360, create four drawings of the robot: front, top, most detailed side, and a drawing of the gear train(s). Sensors, motors, and gears must be included in each drawing. Smaller pieces such as nuts, bolts, and axles may be omitted from the drawings.

Each revision of the design must be documented and all changes must be presented during Milestone presentations.

Figure 2: Example Drawing of VEX MRR

Model

Build a scale model (1:1) of the design. The following materials will be provided:

  1. VEX robotics pieces
  2. Basic electronics prototyping kit
  3. Sensors
  4. Motors

The finished MRR must not exceed a footprint of 15" × 15". There is no height limitation. Any additional components that the MRR is equipped with must also fit within the footprint. Additional materials can be supplied by a TA.

Cost Estimate

Once a robot design is complete, a cost estimate must be generated that specifies the cost of all the materials and labor required for the construction of the design. Tabulate this cost information clearly in an Excel spreadsheet, using the materials cost list provided. Help in calculating the cost is available by reviewing how to plan the schedule and calculate costs for a project. The costs for the parts can be found on the Price list for VEX parts for robot projects.

Note: Only the materials contained in the price list for VEX parts for robot projects may be used. To use other parts, get permission from a faculty member, and also to determine the cost of the additional parts used that are not in this price list.

The cost estimate should include the following:

  • Labor cost breakdown with hours and rates ($50.00 per person per hour)
  • Consolidate low-cost pieces: axles, beams, bricks, bushings, connectors, gears, plates
  • Consolidate low-cost electrical components: microcontrollers, breadboard, wires, motor shield
  • Itemize high-cost pieces: sensors, motors, and battery
  • Total cost must be shown in the bottom right corner of the table

CATME

When working on engineering team projects, peer evaluations and self-evaluations are critical for assessing how effective individual contributions are to the project. In this course, the recitation professor will use evaluations at each Milestone using a software called the Comprehensive Assessment of Team Member Effectiveness (CATME). More information can be found on the Teamwork Expectations page.

Engineering Notebook

All work done on the project and future plans and goals must be documented in an Engineering Notebook. To complete a Benchmark assessment, the Engineering Notebook must be presented to the Open Lab TA completing the assessment. For Milestone 1, Milestone 2, Milestone 3, and Early or Final Submission, the Engineering Notebook must be approved by the recitation professor and be prepared to make it available to an Open Lab TA in a Word Document (.docx) format. A guide to writing the notebook and a basic overview of the expectations and frequency at which the Engineering Notebook must be updated can be found on the Keeping an Engineering Notebook page.

Extra Credit

The tasks listed below show the opportunities to receive extra credit at commissioning:

  • Returning to the Start tile at the end of the entire run. If completing multiple extra credit tasks, returning to the Start tile should be the final task completed.
  • Traversing the secondary ramp (Ramp 1). The robot must be able to descend the primary ramp similar to how it ascended the ramp for commissioning. For safety reasons, the robot cannot jump off the primary ramp directly to Ramp 1.
  • Implementing an additional sensor

Additional extra credit opportunities are as follows:

  • Completing Early Submission

Refer to the EG1004 Grading Policy for exact point values. Creativity and innovation are always rewarded. Original designs will receive extra credit.

Milestones, Benchmarks, and Deliverables

As work is done on the project, three Milestone presentations will report on the project's progress. All of the items assigned in each phase of the project are called Benchmark deliverables. These deliverables often consist of a combination of written submissions, presentations, and demonstrations. Benchmark assessments evaluate the progress of the project.

Preliminary Design Investigation

The Preliminary Design Investigation (PDI) is extremely important, as it lays the groundwork for the project. It outlines the project idea, inspiration, and goals.

The PDI must include:

  • Cover Page
  • Project Overview
  • Goals & Objectives
  • Design & Approach
  • Cost Estimate
  • Project Schedule
  • Relevant Pictures

An example PDI template can be found here. The PDI is due by Benchmark A. Do not forget to include the items listed above. Use this link to access the VEX PDI Rubric.

Milestone 1

See How To Give a Milestone Presentation for the format of a Milestone presentation.

Milestone 1 is a presentation of the PDI. It is important that it outlines the project goals and show that the project is realizable.

The Milestone 1 presentation must include:

  • Company profile
    • Company name
    • Product name
    • Company officer title(s)
    • Mission statement
  • Project objective
    • What is the project about?
    • What tasks is the company aiming to accomplish? (Benchmark A requirements)
    • Overall design approach to complete objective
  • Background information
    • Why is the project happening?
    • What does the audience need to know?
  • Technical design description
    • Preliminary conceptual drawing of robot design
      • Rendered and digital sketches are acceptable, CAD not required
    • What components will be used and why?
  • Cost estimate
    • Major components of design listed
    • Miscellaneous category listed
    • Projected labor listed
  • Microsoft Project schedule
    • Click here to access the guide on how to transfer a file
  • Teamwork agreement summary
  • Summary
    • Overall assessment on current state of project
    • Is the project on schedule? Is it on budget?
    • Next steps and future tasks


Look Ahead: What tasks are planned between now and Milestone 2?

Benchmark Assessment A

Benchmarks evaluate the progress of the project. Benchmark A is due at the end of Model Shop Session II. There are penalties for not completing this on time. Refer to the EG1004 Grading Policy for more information.

To pass Benchmark A, the design must complete all of the following:

  • Robot reaches the rock sample (the robot does not have to pick it up)
  • PDI
  • Initial CAD model
  • Submit an .STL and a .3mf (Bambu Studio Project file) of the company logo through the 3D Printing Submission portal on the EG website
  • Updated Engineering Notebook

Milestone 2

See How To Give a Milestone Presentation for the format of a Milestone presentation.

Milestone 2 will be a project progress update. It must explain all changes and developments made to date, particularly in regards to Benchmark A. Include whether or not Benchmark A requirements are completed, and if not, explain why. Also, highlight any changes you plan on making to your design or project, in general.

The Milestone 2 presentation must include:

  • Company profile
    • Company name
    • Product name
    • Company officer title(s)
    • Mission statement
  • Project objective
    • What is the project about?
    • What tasks is the company aiming to accomplish? (Benchmark A/Benchmark B requirements)
    • Overall design approach to complete objective
  • Background information
    • Why is the project happening?
    • What does the audience need to know?
  • Technical design description
    • Explanation of design changes, if any
    • CAD drawings: top, front, most detailed side, isometric, and gear train view
    • Circuit and schematic diagram(s)
    • Relevant pictures
    • Flowchart of code
  • Cost estimate (previous and current costs)
    • Major components of design listed
    • Miscellaneous category listed
    • Projected labor listed
    • What changes were made, if any?
  • Microsoft Project schedule (previous and current)
    • What changes were made, if any?
    • Click here to access the guide on how to transfer a file
  • Summary
    • Overall assessment on current state of project
    • Is the project on schedule? Is it on budget?
    • Next steps and future tasks

Benchmark Assessment B

Benchmark Assessment B is due at the end of Model Shop Session III. There are penalties for not completing this on time. Refer to the EG1004 Grading Policy for more information.

To pass, complete all of the following tasks:

  • Rock sample is carried by the robot
  • Robot returns to the Start tile
  • Implement and use a sensor to aid the robot's navigation
  • Updated CAD model
  • Have an .STL and a .3mf (Bambu Studio Project file) of the company logo approved by a ProtoLab TA through the 3D Printing Submission portal on the EG website. Students must physically go to the ProtoLab before Modelshop Session 3 to get the logo approved. Logos cannot be approved during Modelshop sessions.
  • Updated Engineering Notebook

Milestone 3

See How To Give a Milestone Presentation for the format of a Milestone presentation.

Milestone 3 will be the last project progress update. It must explain all changes and developments made to date, particularly in regards to Benchmark B. Include whether or not Benchmark B requirements are completed, and if not, explain why. Also, highlight any changes you plan on making to your design or project, in general.

The Milestone 3 presentation must include:

  • Company profile
    • Company name
    • Product name
    • Company officer title(s)
    • Mission statement
  • Project objective
    • What is the project about?
    • What tasks is the company aiming to accomplish? (Benchmark A/Benchmark B requirements)
    • Overall design approach to complete objective
  • Background information
    • Why is the project happening?
    • What does the audience need to know?
  • Technical design description
    • Explanation of design changes, if any
    • CAD drawings: top, front, most detailed side, isometric, and gear train view
    • Circuit and schematic diagram(s)
    • Relevant pictures
    • Flowchart of code
  • Cost estimate (previous and current costs)
    • Major components of design listed
    • Miscellaneous category listed
    • Projected labor listed
    • What changes were made, if any?
  • Microsoft Project schedule (previous and current)
    • What changes were made, if any?
    • Click here to access the guide on how to transfer a file
  • Summary
    • Overall assessment on current state of project
    • Is the project on schedule? Is it on budget?
    • Next steps and future tasks

Commissioning

Projects must be commissioned before Submission. Refer to the syllabus for Submission deadlines. There are penalties for not completing this on time. Refer to the EG1004 Grading Policy for more information.

To pass, the design must complete all of the following:

  • Complete tasks for Benchmarks A and B
  • Robot reaches the highest point of the mountain
    • The robot must come to a complete stop at the peak
  • Robot meets all specifications
  • Finalized CAD model
  • Have an .STL file of the company logo printed through the 3D Printing Submission portal on the EG website
  • All 3D prints must be approved by a ProtoLab TA
  • Updated Engineering Notebook

The robot must complete the required tasks in a single run to obtain full credit for commissioning.

Final Design Report

The Final Design Report (FDR) provides a comprehensive overview of the project process and developments from initial brainstorm to finished prototype. All project expectations and outcomes must be clearly detailed in the document. This report will also provide documentation experience useful for completing a Senior Design final report and other projects.

The FDR must include the following documentation:

  • CAD drawings
  • Wiring diagrams
  • Project schedule
  • Cost estimate

The FDR uses different section headers and content than those in the lab reports, but all FDRs must follow the EG1004 Writing Style Guide. Use this FDR template with the following outline:

  • Introduction
    • Purpose of Project
    • Background
  • Requirements
    • Physical Components
    • Software Components
  • Procedures
    • Physical Construction
    • Software Setup
    • Software Troubleshooting
  • Milestone and Final Product Requirements
    • Benchmark A Requirements
    • Benchmark B Requirements
    • Final Submission Requirements
    • Human Resources and Training (e.g. TA expertise utilized, etc.)
  • Results
    • Benchmark A Results
    • Benchmark B Results
    • Difficulties Experienced
  • Conclusion
    • Results of Project
    • Future Improvements

The FDR is due at the time of submission.


Final Presentation

The Final Presentation will be a technical briefing, similar to the Milestones, but also serves as a sales presentation explaining why the company should be selected instead of the competition.

Your Final Presentation must include:

  • Company profile
    • Company name
    • Employee profile, role(s), and qualifications
    • Mission statement
  • Problem statement
    • Why is the project happening?
    • What does the audience need to know?
  • Project objective
    • What is the purpose of the project?
    • Who does your project help?
    • What problem does the project solve?
  • Project description
    • Explanation of design changes, if any
    • CAD drawings: top, front, most detailed side, isometric, and gear train view
    • Relevant pictures
    • Flowchart of code
  • Market and product viability
    • Does the company have competitors?
    • What makes the project unique?
    • How does the design compare to competitors - cost, quality, features?
    • Is the project versatile?
    • What is the price of the project?
  • Conclusion
    • Reiterating project purpose
    • Highlight project features
    • Future goals of the company
    • Why should the company be awarded this contract?
  • Video pitch
    • Price of project
    • Demonstration of robot run
    • Embedded into Final Presentation

Submission

All SLDPs must be submitted online. Please visit this page for the link to the Project Submission form and each project’s individualized login information. To submit, login to the EG1004 website using this special login information. Submitting with an NYU account or any other account will generate an error. Components may be resubmitted at any time before the deadline. Please note that submission times are based on the most recent submission.

Please note the deliverables for this project are as follows. If any of the following items are omitted, there will be a penalty. Be sure to click "Submit" at the bottom of the form and allow sufficient time for uploading. The following list includes deliverable items that are required:

  • Submission deliverables:
    • Final presentation
    • Final Arduino program
    • Final circuit diagrams
    • Initial sketch
    • All the drawings of the design (initial through final)
    • Video
    • Final Microsoft Project schedule
    • Final cost estimate
    • Resume(s) (no fictitious resumes will be accepted)
    • Final notebook/project journal
    • Final Design Report

Please note that submission times are based on the most recent submission.


Late Submission

Late submission is not allowed. If a project does not Commission or receive Partial Commission by the deadline set forth in the syllabus, the project will not be allowed to submit and will receive a 0 for the project grade. To receive Partial Commissioning, two TAs must evaluate the project and determine its degree of completion according to the Commissioning requirements and the project will be given a grade accordingly. Please refer to the EG1004 Grading Policy for more information.

Frequently Asked Questions

Q: Is stepping on the course allowed as it is difficult to retrieve a robot from the middle of the course due to its size?

A: No. If needed, ask a TA for assistance.

Q: Can the course be bumped if the robot gets stuck?

A: No. It is not possible to bump Mars, so bumping the course is not an option.

Q: Can rubber bands be used on the wheels for more traction?

A: Yes. This is highly encouraged, especially when dealing with slopes.

Q: All the VEX parts are really big. Is there a size constraint?

A: There is a size limitation of a 15 in × 15 in footprint. Exceeding this constraint is okay, but it may create difficulties in navigating the robot through the course.

Q: Can more than 2 motors be used?

A: No. Robot designs are limited to two motors.

Q: Can the robot jump from one hill to another?

A: No. This will cause damage to both the robot and course and is also unsafe. If the robot does this, the trial will be invalidated and the project may receive point penalties to the final project grade.

Q: What is the best way to start building the robot?

A: For help with building, refer to the VEX How-To Manual.