Difference between revisions of "Boom Construction Competition"

From EG1004 Lab Manual
Jump to: navigation, search
 
(53 intermediate revisions by 8 users not shown)
Line 1: Line 1:
=Objective=
==Objective==


The experimental objective of this lab is to design and assemble a boom. This is a competition lab, and the booms will be judged by a design ratio  that uses boom weight, boom length, weight held, and anchor time. The highest design ratio wins the competition.
The objective of this lab is to design and assemble a boom. The performance of the boom will be judged by a design equation that includes boom mass, boom length, mass held, and anchor time. The team with the highest equation result will win the competition.


=Overview=
==Overview==


A <b>boom</b> is used to lift and move heavy objects, often objects that are much heavier than the boom itself. Distributing the load being lifted over the length of the boom is the main problem in boom design. The design must consider the maximum load the boom will be required to lift, how high the load will be lifted, and whether the boom will be moved or remain stationary while loaded.  
A <b>boom</b> is a device used to lift and move heavy objects that are heavier than the boom itself. Booms can be found everywhere in society, particularly in construction; cantilever bridges and cranes, for example, are common examples of booms.


== Examples of Booms ==
A common example of a boom is a cantilever bridge, which uses two booms extending from a common base (Figure 1).  
 
Certain types of bridges use booms. A cantilever bridge uses two booms extending from a common base. One type of cantilever bridge is a cable-stayed bridge (Figure 1).


[[Image:Lab_boom_13.png|650px|thumb|center|Figure 1: A Cable-Stayed (Cantilever) Bridge]]
[[Image:Lab_boom_13.png|650px|thumb|center|Figure 1: A Cable-Stayed (Cantilever) Bridge]]
Line 15: Line 13:
The Ed Koch Queensboro Bridge is a double cantilever bridge (Figure 2). It has two bases with two booms extending from each base and the cantilevers placed end to end.
The Ed Koch Queensboro Bridge is a double cantilever bridge (Figure 2). It has two bases with two booms extending from each base and the cantilevers placed end to end.


[[Image:lab_boom_10.jpg|frame|center|Figure 2: Ed Koch Queensboro Bridge (Double Cantilever)]]
[[Image:lab_boom_10.jpg|frame|center|Figure 2: Ed Koch Queensboro Bridge]]


The Grand Bridge over Newtown Creek is a swing bridge, also known as a rotating bridge (Figure 3). This bridge has two booms mounted on a base that rotates.
The Grand Bridge over Newtown Creek is a swing bridge, also known as a rotating bridge (Figure 3). This bridge has two booms mounted on a base that rotates.


[[Image:lab_boom_11.jpg|650px|thumb|center|Figure 3: Grand Bridge (Swing Bridge)]]
[[Image:lab_boom_11.jpg|650px|thumb|center|Figure 3: Grand Bridge]]


Figure 4 shows a bascule bridge, more commonly known as a drawbridge, where it is clear that the bridge uses a big, very flat boom.
Figure 4 shows a bascule bridge, more commonly known as a drawbridge. This bridge uses a big, flat boom.


[[Image:lab_boom_12.jpg|650px|thumb|center|Figure 4: Bascule Bridge]]
[[Image:lab_boom_12.jpg|650px|thumb|center|Figure 4: Bascule Bridge]]


Not all bridges are booms. Suspension bridges use a deck that is supported by steel cables, not booms. Examples of suspension bridges are the Brooklyn Bridge, Manhattan Bridge, Verrazano-Narrows Bridge, and the George Washington Bridge.


Cranes are the most common example of booms. The crane pictured in Figure 5 is a tower crane. These cranes are a fixture on construction sites around the world. A tower crane can lift a 40,000 lb load. It is attached to the ground by anchor bolts driven through a 400,000 lb concrete pad poured a few weeks before the crane is erected (Howstuffworks.com, 2003).
Cranes are another common example of booms. The crane pictured in Figure 5 is a tower crane. These cranes are a fixture on construction sites around the world. A tower crane can lift a 40,000 lb load. It is attached to the ground by anchor bolts driven through a 400,000 lb concrete pad poured a few weeks before the crane is erected (Howstuffworks.com, 2003).


[[Image:Tower Crane.jpg|650px|thumb|center|Figure 5: A Tower Crane (Jennings, 2015)]]
[[Image:Tower Crane.jpg|650px|thumb|center|Figure 5: A Tower Crane (Jennings, 2015)]]


== Stress and Strain ==
=== Stress and Strain ===


The design of a boom must consider the properties of the materials used to build the boom. The mechanical properties and deformation of solids are explained by stress and strain. When an external force is applied to a material, it changes shape (e.g. changes length and cross-section perpendicular to the length). Understanding how deformation will affect materials is a critical consideration in boom design.
Distributing the load being lifted over the length of the boom is the main challenge in boom design. The design must consider the maximum load the boom will be required to lift, how high the load will be lifted, and whether the boom will be moved or remain stationary while loaded. The design of a boom must also consider the properties of the materials used to build the boom.


According to Serway and Beichner in “Physics for Scientists and Engineers,” <b>stress</b> is the external force acting on an object per unit cross sectional area. <b>Strain</b> is the measure of deformation resulting from an applied stress (Figure 6).
When an external force is applied to a material, it changes shape (e.g. changes length and cross-section perpendicular to the length). Understanding how deformation will affect materials is a critical consideration in boom design. The mechanical properties and deformation of solids are explained by stress and strain (Serway and Beichner, 2000). '''Stress''' is the external force acting on an object per cross sectional area. '''Strain''' is the measure of deformation resulting from an applied stress (Figure 6).


[[Image:lab_boom_1.jpg|frame|center|Figure 6: Material Under Tension]]
[[Image:lab_boom_1.jpg|frame|center|Figure 6: Material Under Tension]]


The expression (1) for tensile stress shows the relationship between an applied force and the cross-sectional area.
Tensile stress, &sigma;, is the relationship between an applied force, ''F'', and the cross-sectional area, ''A'' (1).


<center><math>\sigma = \frac{F}{A}\,</math></center>
<center><math>\sigma = \frac{F}{A}\,</math></center>
<p style="text-align:right">(1)</p>
<p style="text-align:right">(1)</p>


In (1), &sigma; is the stress, F is the applied force, and A is the cross-sectional area of the object perpendicular to the force. The resulting strain (2) is calculated by dividing the change in length of the object by the original length.
The resulting strain (2) is calculated by dividing the change in length of the material by the original length. This equation finds the strain for a rod of a material. In (2), &Delta;L is the change in length and L<sub>0</sub> is the rod's original length.


<center><math>\varepsilon = \frac{\Delta L}{L_{\text{0}}}\,</math></center>
<center><math>\varepsilon = \frac{\Delta L}{L_{\text{0}}}\,</math></center>
<p style="text-align:right">(2)</p>
<p style="text-align:right">(2)</p>


In (2), &Delta;L is the change in length and L<sub>0</sub> is the object's original length.
There are three basic types of stresses; <b>tensile</b> (pulling or stretching), <b>compressive</b> (squeezing or squashing), and <b>shear</b> (bending or cleaving). Consider a straight metal beam. If a <b>tensile stress</b> is applied to both ends of the beam, the length of the beam will increase, while the cross-sectional area of the beam perpendicular to the force applied will decrease. Under <b>compressive stress</b>, the opposite will occur. If the beam is subjected to <b>shear stress</b>, it will bend towards the direction of the applied force, and both the length and cross-sectional area of the beam will become distorted. Figure 7 depicts a graphic representation of the three common forms of stress.


There are three basic types of stresses; <b>tensile</b> (pulling or stretching), <b>compressive</b> (squeezing or squashing), and <b>shear</b> (bending or cleaving). Consider a straight metal beam. If a <b>tensile stress</b> is applied to both ends, its length will increase in both directions of the force, while its cross-sectional area perpendicular to the force applied will decrease. Under <b>compressive stress</b>, the opposite will occur. If the beam is subjected to <b>shear stress</b>, it will bend towards the direction of the applied force, and both the length and cross-sectional area of the beam will become distorted. Figure 7 depicts a graphic representation of the three common forms of stress.
[[Image:Lab_boom_7.gif|thumb|400px|center|Figure 7: Example of a Boom Under Three Common Modes of Stress]]


[[Image:Lab_boom_7.gif|frame|center|Figure 7: Example of Cylindrical Material Under Three Common Modes of Stress]]
Strain is proportional to stress for material dependent values of strain. If the material is known, it is possible to derive strain from measured stress, and vice-versa, up to a certain level of stress. This proportionality constant is referred to as the <b>elastic modulus</b>, or '''Young’s modulus'''.  The moduli of different materials is an important factor to consider when designing or building any form of structure that will be under stress.


Strain is proportional to stress for material dependent values of strain. If the material is known, it is possible to derive strain from measured stress, and vice-versa, up to a certain level of stress. This unitless mathematical constant is referred to as the elastic modulus, or Young’s modulus.  The moduli of different materials is an important factor to consider when designing or building any form of structure meant to encounter stresses.
=== Stress-Strain Curve ===


== Stress-Strain Curve ==
A graph of <b>stress-strain</b> shows the relationship between the stress and strain of a material under load. Figure 8 shows the stress-strain curve of a common metallic building material. In the <b>elastic region</b>, the material will regain its original shape once the stress is removed. The elastic region in Figure 8 is fairly linear. The slope of this linear portion of the stress-strain curve is the elastic modulus.  
 
A <b>stress-strain</b> curve graphically shows the relationship between the stress and strain of a material under load. Figure 8 shows the stress-strain curve of a common metallic building material. In the elastic region, the material will regain its original shape once the stress or load is removed. Note that the <b>elastic region</b> in Figure 8 is fairly linear. The slope of this linear portion of the stress-strain curve is the elastic modulus, as defined above.


[[Image:lab_boom_2.jpg|frame|center|Figure 8: Stress-Strain Curve of a Material Under Tension]]
[[Image:lab_boom_2.jpg|frame|center|Figure 8: Stress-Strain Curve of a Material Under Tension]]


The <b>elastic limit</b> for a material is the maximum strain it can sustain before it becomes permanently deformed (i.e. if the stress is decreased, the object no longer returns to its original size and shape). In the <b>plastic region</b>, the material loses its elasticity and is permanently deformed. A linear approximation with the elastic modulus is no longer accurate.  
The <b>elastic limit</b> for a material is the maximum strain it can sustain before it becomes permanently deformed (i.e. if the stress is decreased, the object no longer returns to its original size and shape). In the <b>plastic region</b>, the material loses its elasticity and is permanently deformed. A linear approximation with the elastic modulus is no longer accurate.  
The <b>ultimate tensile strength</b> is the maximum stress a material can undergo. The <b>fracture stress</b> is the point at which the material breaks. Fracture stress is lower than the ultimate tensile strength of a material as by the time a material reaches that level of stress, it has already begun to rip apart. Thus, the cross-sectional area is constantly decreasing until the material finally breaks.
In addition to these intrinsic materials factors, the behavior of materials as they age and are used in service must be considered in boom design. These factors do not relate directly to the boom design in this lab, but they must be considered when deciding what material to use for an actual design. The loss of desirable properties through use, called <b>fatigue</b>, is important. Non-static loads, repeated loading and unloading, or loads that include vibrations or oscillations will eventually lead to failure in service. Special care must be taken with live loads and situations where small motions may be magnified by design features.
<!--<p>The first aging factor is chemical degradation and, in particular, <b><i>corrosion</i></b>.  Light and
chemicals present in the
environment can cause chemical reactions with the materials chosen for a
design.  These reactions can cause a loss
of strength, flexibility or other desirable material properties.  Corrosion
occurs when two or more materials or substances react with each other, in the
presence of an electrolyte.  For example,
rust results when iron or simple steel is exposed to water, or just even humid
air.  Rust is particularly damaging
because it flakes off, thinning and weakening the underlying material.  Careful choice of material will minimize the effects of chemical degradation.  However,
the cost is often limiting factor and cheap countermeasures like paint and other
coatings are often employed.</p>
<p><b><i>Erosion</i></b> is another
factor in material failure. It is weathering caused by exposure to
environmental factors like wind driven dust or sand, rain or flowing water. The
smoothing of rocks by a river or the sea is a good example of this kind of
process.  Care in the design process can
help minimize the effect of erosion.
Again the cost is often the limiting factor and coatings are often employed
to protect an object.</p>
<p>A third factor in material failure is <b><i>thermal
cycling</i></b>.  Materials in an object
will routinely warm up and cool down while in use (especially device that
generates heat internally), over the course of a normal day, or even over a
year.  This thermal cycling is
accompanied by physical expansion and contraction of the object.  Different materials expand and contract by
different amounts and this can lead to internal stress and strains, and
ultimately failure.  Careful choice and
matching of materials can minimize the effects of thermal cycling, but the cost may
limit the choices.  Accumulations of
water, which can freeze and thaw, can be very damaging and coatings are often
especially vulnerable to thermal cycling as they may crack and peel off,
exposing the underlying material in need of protection.</p>
<p>A related but more dramatic mode of failure is <b><i>thermal shock</i></b>.
This can occur when objects made of certain
materials are exposed to extreme temperature changes over a short period of
time.  If the material is inhomogeneous
(i.e., properties not uniform throughout), thermal expansion or contraction can
be sufficiently non-uniform to cause cracking.
If the cracks spread far enough, the material will fail in spectacular
fashion.  Imagine quickly immersing a
very cold ordinary glass bottle in very hot water.  Often such failures can be avoided by heat
treatment (annealing) and in general, material properties can be improved
significantly through heat treatment and mechanical working.  For example, the familiar Pyrex<sup>TM</sup>
glass is specially treated to avoid thermal shock.</p>-->
There are many factors to consider in any design project. When designing and constructing the boom for this competition, remember to consider the materials being used and what might cause those materials to fail under a load.
== Simulations ==
An extremely important tool in an engineer’s skillset is the use of simulation tools. Many times, complex designs require quick analysis that cannot be done by calculation or prototyping, so simulation comes in handy and as it saves both time and money. Specifically, <b>Finite Element Analysis (FEA)</b> is a process that a computer software undergoes to simulate a desired scenario. The software calculates mathematical formulas at hundreds to thousands of points on a design, referred to as a mesh, and computes them simultaneously to get a complete look at what would happen. This simulation only works for isotropic materials, meaning that the materials properties (tensile strengths, modulus, etc.) are the same for all sides of the material. This may not be true for certain materials, and an engineer must take this into account. While members of the group are designing and building a boom, others will simulate a basic design in order to understand the effect of the forced displacement, and use that information to improve the initial design.


== Fusion 360 ==
The <b>ultimate tensile strength</b> is the maximum stress a material can undergo. The <b>fracture stress</b> is the point at which the material breaks. Fracture stress is lower than the ultimate tensile strength of a material because the material has reached that level of stress and has already begun to fail. The cross-sectional area is constantly decreasing until the material finally breaks.
A brief digest of the tools and functions of the Fusion 360 Design workspace is presented below. This digest is specific to this virtual lab and many of the CAD functions can be performed differently in other situations.


===  Navigation Tools  ===
In addition to these intrinsic materials factors, the behavior of materials as they age and are used in service must be considered in boom design. These factors are not applicable to the boom design in this lab, but they must be considered when deciding what material to use for  a design. The loss of desirable properties through use, called <b>fatigue</b>, is important. Non-static loads, repeated loading and unloading, or loads that include vibrations or oscillations will eventually lead to failure in service. Special care must be taken with live loads and situations where small motions may be magnified by design features.
* The <b>Orbit</b> tool allows rotating the current view around a pivot point in three dimensions. This can also be done by grabbing the orthographic cube in the top right corner and rotating it. To make the view normal to a face, edge, or corner, click the respective part of the orthographic cube.  
* The <b>Zoom tool</b> allows for the magnifying or minimizing of an object.
* If the component is lost in the view, either use the <b>Pan tool</b> to move the current view in 2D until it is found, or click Zoom Window > Fit. These tools will help navigate the workspace while putting together the boom.


[[Image:Bc1.png|300px|thumb|center|Figure 9: Orbit, Pan and Zoom Tools]]
There are many factors to consider in any design project. When designing and constructing the boom for this competition, consider the materials being used and what might cause those materials to fail under a load.


=== Moving Components  ===
==Competition Rules==
* Once a component is placed into the workspace, Fusion 360 will remember the component in that space. To move it again, use the <b>Move/Copy tool</b> after right clicking the component (Figure 10).


[[Image:Bc2.png|400px|thumb|center|Figure 10: Move/Copy Tool]]
The following rules must be followed to qualify for the competition.
 
* Once the component is moved to the desired position, use the <b>Capture Position tool</b> to set the component in that place (Position > Capture Position). If it is ever moved unintentionally, use the <b>Revert button</b> (Position >  Revert) to move the component back to its original position. These tools will only show up when the model is an unsaved position (Figure 11).
 
[[Image:Bc3.png|450px|thumb|center|Figure 11: Capture Position Tool]]
 
===  Deleting Components  ===
* Deleting parts requires an extra step. Clicking on an object automatically selects the face of a body and not the whole body, and Fusion 360 will not be able to delete a face. To get past this, in the toolbar go to Select > Selection Priority > Select Body Priority (Figure 12).
 
[[Image:Bc4.png|700px|thumb|center|Figure 12: Select Tool]]
 
* A part can only be deleted by selecting its body. Make sure to use the same steps to change the selection priority back to face, or to edge/component if necessary. Another way to delete is to right click on the component in the Browser tab and click Delete.
 
===  Aligning Components  ===
* The <b>Align tool</b> is found under the Modify tab of the toolbar. This is useful when attempting to place cylinders in a position defined by an opening. Simply select the outside face of the cylinder and the inside face of the hollow cylinder to align the two parts. Make sure to check the <b>Capture Position Box</b> or use the <b>Capture Position tool</b> to save this setup of the model (Figure 13).
 
[[Image:Bc51.png|700px|thumb|center|Figure 13: Align Tool]]
 
===  Changing Boom Length  ===
* To cut a part of the boom, first open the boom file by double clicking on it from the Data Panel.
* Click on the circular face of the boom. In the toolbar, go to Modify > Press Pull. Use the blue arrow in the current view to change the length of the boom, or type in the desired change in Distance.
* Use Save as to make a new component with a different name. Only the total length supplied by the materials provided can be used (do not increase the length of the full dowels or skewers).
 
=Competition Rules=
 
The competition rules must be followed at all times during the competition.
Violation of any of these rules will result in the disqualification of the
Violation of any of these rules will result in the disqualification of the
design.
design.


<ul>
<ul>
<li>The boom is to be secured (i.e. anchored) to the white plastic anchorage provided at the front of the lab
<li>The boom must be anchored to the white plastic anchorage provided at the front of the lab
<li>The boom must extend at least 1.5 meters horizontally from the front edge of
<li>The boom mass ratio must be greater than 1
the anchorage</li>
<li> The dowels must be used as-is; they cannot be cut further
<li>The boom must be anchored in two minutes or less</li>
<li>The boom must extend at least 1.5 m horizontally from the front edge of
the anchorage for the entire run
<li> The boom must start at least 0.30 m from the ground after adding 15 grams of preload
<li>The boom must be anchored in 2 min or less</li>
<li>The boom may not touch anything but the anchorage</li>
<li>The boom may not touch anything but the anchorage</li>
<li>The <b>basic weight ratio</b> (3) for the competition uses the weight supported divided by the boom weight</li><br>
<li>The boom’s performance will be assessed by its anchor time, boom mass, boom length, and the mass it can support before deflecting 0.20 m vertically</li>  
<li> A team can use any number of dowels, as long as their total length is less than or equal to the length of 4 uncut dowels (4 x 122 cm, or 488 cm)
</ul>


<center><math>Weight\ Ratio = \frac{Weight\ Supported}{Boom\ Weight}\,</math></center>
The '''basic mass ratio''' (3) is defined via the mass supported in grams divided by the boom mass in grams.
 
<center><math>Mass\ Ratio = \frac{Mass\ Supported\left[\text{g}\right]}{Boom\ Mass\left[\text{g}\right]}\,</math></center>
<p style="text-align:right">(3)</p>
<p style="text-align:right">(3)</p>


<li>The winning design will be determined by the <b>weighted design ratio</b> (4), which uses the weight ratio, anchor time, and boom length</li>
The winning design will be determined by the competition equation (4) which includes the mass ratio, anchor time in seconds, and boom length in meters.
</ul>


<center><math>Design\ Ratio = \frac{Weight\ Supported}{Boom\ Weight} \times \frac{60\left[\text{s}\right]}{Anchor\ Time\left[\text{s}\right]+30\left[\text{s}\right]} \times \frac{Boom\ Length\left[\text{m}\right]}{1.5\left[\text{m}\right]}\,</math></center>
<center><math>Competition\ Equation = (Mass\ Ratio)^2 \times \frac{60\left[\text{s}\right]}{Anchor\ Time\left[\text{s}\right]+30\left[\text{s}\right]} \times \frac{Boom\ Length\left[\text{m}\right]}{1.5\left[\text{m}\right]}\,</math></center>
<p style="text-align:right">(4)</p>
<p style="text-align:right">(4)</p>


=Design Considerations=
==Design Considerations==
* Which aspects of the competition ratio are most advantageous?
* How can the boom be built and/or reinforced to prevent as much deflection as possible?
* How can the boom be built and/or reinforced to prevent as much deflection as possible?
* In which instances should you use the thin vs thick dowels?
* What design aspects will maximize and minimize the design equation result?


=Materials and Equipment=
==Materials and Equipment==


<ul>
The following materials are available to construct the boom.
<li>Two thick dowels (1.1 cm &times; 122 cm)</li>
<li>Two thin dowels (0.8 cm &times; 122 cm)</li>
<li>Six bamboo skewers (30.5 cm)</li>
<li>3D printed dowel connectors</li>
<li>Cellophane tape</li>
<li>Kevlar string</li>
<li>Fusion 360 (Remote students)</li>
</ul>


<font color="red"><b>'''Note: A saw is available to cut the dowels. Ask a TA for assistance, as only TAs may use the saw.'''</b></font>
*Thick dowels (122.00 cm, 81.20 cm, 61.00 cm, 40.60 cm long × 1.10 cm diameter)
*Thin dowels (122.00 cm, 81.20 cm, 61.00 cm, 40.60 cm long × 0.80 cm diameter)
*3D printed dowel adaptors
*Cellophane tape
*String


=Procedure=
<!--{| class="wikitable"
|+ Table 1: Materials Available for Boom Construction
!Item Name!!!!Dimensions!!!!Quantity
|-
|Dowel Length || || Dowel Diameter || ||
|-
|Full Length || 122 cm || Thick || 1.1 cm ||
|-
| || || Thin || 0.8 cm ||
|-
|2/3 Length || 81.2 cm || Thick || 1.1 cm ||
|-
| || || Thin || 0.8 cm ||
|-
|1/2 Length || 61 cm || Thick || 1.1 cm ||
|-
| || || Thin || 0.8 cm ||
|-
|1/3 Length || 40.6 cm || Thick || 1.1 cm ||
|-
| || || Thin || 0.8 cm ||
|-
|3D Printed Dowel Adaptors || || || || Unlimited
|-
|Cellophane Tape || || || || Unlimited
|-
|String || || || || Unlimited
|}-->


== Note for Hybrid Session ==
== Procedure ==
In-person students are expected to complete the competition part of the procedure, indicated by the label <b>(In-Person)</b>. Remote students are expected to complete the virtual boom analysis part of the procedure, indicated by the label <b>(Remote)</b>. Any procedure labeled <b>(Hybrid)</b> is expected to be completed through a joint collaboration between remote and in-person students.


== 1. Boom Design and Construction (Hybrid) ==
=== Part 1. Boom Design and Construction ===


<!--# Assess the materials and consider the design options, keeping in mind the competition specifications. Preliminary sketches must be completed during this process.
# Assess the materials and consider the design options, keeping in mind the competition specifications. Preliminary sketches must be completed during this process.
# Sketch the basic design in pencil using the lab notes paper provided by a TA. Label the design clearly and have a TA sign and date it.
# Sketch the basic design in pencil using the lab notes paper provided by a TA. Label the design clearly and have a TA sign and date it.
# Construct the boom based on the completed sketch and the available materials. A TA will provide the materials allowed for the design. If the design is modified during the construction phase, make sure to note the changes and describe the reasons for them
# A TA will weigh the boom and record the weight in the competition spreadsheet for the section-->
# Assess the materials and consider the design options, keeping in mind the competition specifications. Preliminary sketches must be completed during this process
# Sketch the basic design in pencil using the lab notes paper provided by a TA or on the EG1003 website. Label the design clearly and discuss the pros and cons of the design with your teammates.
# Construct the boom based on the completed sketch and the available materials. A TA will provide the materials allowed for the design. If the design is modified during the construction phase, make sure to note the changes and describe the reasons for them.
# Construct the boom based on the completed sketch and the available materials. A TA will provide the materials allowed for the design. If the design is modified during the construction phase, make sure to note the changes and describe the reasons for them.
# While in-person students begin to construct the boom, remote students will analyze a sample boom simulation on Fusion 360 to gain a better understanding of the forces that will affect the boom. After viewing the simulation, remote students will then move to construct their groups boom design in Fusion 360. This is highlighted in the section below.
# Since anchor space is limited, each  boom is only allowed to use an anchor for '''10 min''' at a time. The TAs will keep track of the time, and booms  will rotate every 10 min to ensure that every boom has access to an anchor. During the downtime, continue working on  the boom to make the best use of the next anchoring opportunity.
# After the virtual students have completed the Virtual Boom Analysis procedure, and in-person students have completed step 3 of this procedure, ask a TA to begin load testing for your in-person boom.
# A TA will weigh the boom and record the weight in the competition spreadsheet for the section.
 
== 2. Virtual Boom Analysis (Remote) ==
The steps below will go through how to analyze and understand the boom simulation, and find the corresponding design ratio for it. The boom simulation was made using the parts with the same shape of the in-person boom parts, and an assumed material with the approximate inputted properties of wood was used (Research isotropic vs orthotropic materials). The data needed for the design ratio will be found and translated and the forces along the boom will be analyzed to improve the in-person boom design.
 
# The example of the boom model can be found in a ZIP folder [[Media: Theoretical_Boom_Lab_7.zip|here]]. The latest version of Fusion 360 must be downloaded for the parts to appear properly.
# Unzip the parts to a space on the computer.
# In Fusion 360, open the Data Panel (icon with 9 boxes at the top left) and click Upload. Select the unzipped part files to upload them to Fusion 360’s cloud memory. Fusion 360 can only import files uploaded to its cloud.
# Ensure that the Design workspace is open in Fusion 360. This is indicated at the top left.
# Double click on the Theoretical Boom file in the Data Panel to open it.
 
=== Mass of the Boom ===
 
# Ensure that the Design workspace is open in Fusion 360. This is indicated at the top left.
# Go to the Browser on the left-hand side of the workspace. Use the small, white arrows on the left of the part names to open their folders. Open the Bodies folder of the part, right click the body of interest, and select Properties (Figure 14).  
# In the Properties dialog that appears, record the mass of the body.
# Repeat these steps for all the bodies in the boom design and add the masses to obtain the total mass of the boom. Record the total mass of the boom in your Lab Notes.
[[Image:Bc11.png|600px|thumb|center|Figure 14: Obtain Mass of Bodies]]
 
=== Length of the Boom ===
 
# Ensure that the Design workspace is open in Fusion 360. This is indicated at the top left.
# In the toolbar, go to Inspect > Measure.
# In a side view of the boom, select a point at the front of the anchor and then another point at the tip of the boom.
# In the Measure dialog, check the XYZ Delta box.
# From the Measure dialog, record the length in meters in your Lab Notes.       
[[Image:Bc12.png|600px|thumb|center|Figure 15: Sample Boom Length Measurement]]
 
=== Understanding the Results ===
 
# Switch the workspace from Design to Simulation at the top left of the screen. <b>Note: If you get an interference warning it can be ignored since seeing the contacts allows better visualization of the boom’s deflection.</b>
# The results will now be calculated and obtained. In the Browser tab, right click Results > Solve. In the Solve dialog, click Solve 1 Study. Wait for the simulation to complete.
# After the simulation has been solved, the workspace will show a deflected boom similar to the one shown below in Figure 16.[[Image:Bc18.png|600px|thumb|center|Figure  16: Sample Boom Deflection]]
# The scale on the right will be reading Safety Factor with a scale from 0-15. Make sure the minimum safety factor is above 1. The safety factor is the yield strength of the material divided by the maximum stress calculated at a point. If this is under 1, this is the simulation showing a broken part.
# Use the drop down menu of the other options, for example the drop down menu for Reaction Force (figure 16), to analyze the boom further. Simulation contacts describe the interaction between parts in an assembly. Take a look at where the contact force is and use this knowledge for the analysis of your team's boom. This simulation is being displaced 20 cm, just like your boom will be, so the general reactions should be relevant to the actual boom that will be built by the in-person students.


=== Finding the Reaction Force ===
=== Part 2. Competition ===


# The reaction force will be determined. In the Results toolbar, go to Inspect > Reactions and click the bottom face of the boom anchor as the Entity. <b>By Newton's Second Law, the static displaced structure should have a reaction force on the fixed face equal to an imaginary weight placed when the beam was deflected.</b> There is a force on the bottom face of the boom anchor that is a resultant of the 20 cm displacement at the end of the boom. This is the reaction force.
<p><b>Note: </b>Attaching the boom to the anchorage is a critical phase of the competition. Anchoring will be timed. Making  a plan to anchor the boom quickly will improve its standing in the competition. Practice anchoring before the trial begins. The boom will be disqualified if anchoring the boom takes more than 2 min.  
# From the Reactions dialog, record the axial force on the same axis that the displacement was directed on (Figure 17). It should be the largest of the three axial forces.[[Image:Bc20.png|600px|thumb|center|Figure 17: Reactions]]
# Using the Reaction Force found, calculate the weight supported (5) as well as the basic weight ratio (3) and weighted design ratio (4) for the given virtual boom.  This is done by following the math below derived from Newton’s Second Law. Assume Anchor time as 30 seconds. <center><math>Weight\ Supported\left[\text{kg}\right] = \frac{Reaction\ Force\left[\text{N}\right]}{10\left[\text{m}/{s^2}\right]}\,</math></center><p style="text-align:right">(5)</p>
# Use the knowledge gained from the simulation to edit the boom designed in Part 1. Record any changes to the design


==3. Virtual Boom Construction in Fusion 360 (remote) ==
# When the TA says "Go," attach the boom to the anchorage and shout "Done" when the boom is anchored. The TA will only stop the timer once all hands are off the boom. The TA will give the anchoring time that will be used to compute the boom's design ratio.
# A TA will measure the  horizontal length of the boom and record the length in the competition spreadsheet for the section. The boom must remain past the 1.50 m mark throughout the whole run in order to be an accepted run.
# A TA will attach a basket to the end of the boom and add weights until the boom deflects (bends) 0.20 m vertically. The load will be weighed on the lab scale and recorded in the competition spreadsheet for the section.
# Calculate the mass with  [[Media: Lab 4 Student Sheet.xlsx|this sheet]] by filling out the required values colored in gray. Students can also chose to calculate a preliminary mass ratio and competition result by filling out the sheet.
# The design ratio for the boom design will be used to decide the winner of the competition.


<font color="red">'''Note: Fusion 360, like all software, can take time to learn for new users. Reach out to a TA for any help and clarification needed. Some useful tools and functions are given in the Overview section but learn Fusion 360’s panels and functions beforehand.'''</font>
<p>A TA will prepare an Excel file with the section's results and upload it to the the [http://eg.poly.edu/documents.php Lab Documents] section of the EG1004 website.


=== Importing Parts ===
==Assignment==


# The parts for the boom can be found in a ZIP folder [[Media: Boom_Materials_final.zip|here]]. The latest version of Fusion 360 must be downloaded for the parts to appear properly.
=== Individual Lab Report ===
# Unzip the parts to a space on the computer.
# In Fusion 360, open the Data Panel (icon with 9 boxes at the top left) and click Upload. Select the unzipped part files to upload them to Fusion 360’s cloud memory (Figure 18). Fusion 360 can only import files uploaded to its cloud.


[[Image:Bc9.png|300px|thumb|center|Figure 18: Data Panel with Boom Connectors Uploaded]]
* What factors were considered in designing the boom?  Discuss the background information that was used
 
* Describe the competition rules, the ratio, and materials in the Introduction. What impact did the rules, the materials and ratio have on any design decisions?  
=== Model the Boom ===
* Describe the function of each component used in the design  
 
# Ensure that the Design workspace is open in Fusion 360. This is indicated at the top left.
# The part files can be inserted into a new Fusion 360 file by simply dragging and dropping them from the Data Panel into the space. Alternatively, right click the components and select Insert into Current Design (Figure 19). Save the blank file before assembling the boom by going to File > Save as.[[Image:Bc10.png|400px|thumb|center|Figure 19: Inserting the Boom Anchor]]                             
# The first part that is inserted into Fusion 360 acts as the base for the entire model. The boom anchor should be inserted first as the boom should be designed around it.
# Import the other parts based on the design that was sketched. Connect all the parts using the Align tool to complete the model. Use the tips from the Fusion 360 section in the Overview.
# Take time to get comfortable with moving each part around. Keep in mind that Fusion 360 is a 3D workspace and depth is not shown on a 2D screen, so use the orthographic cube at the top right of the workspace to change the view and ensure the components fit together.
# A short video is provided for reference [https://drive.google.com/file/d/1pvvBVhneC8kx9-cMV3TkLxK7C4m74hCw/view here].
 
== 4. Competition (In-Person) ==
 
<p><b>Note: </b>Attaching the boom to the anchorage is a critical phase of the competition. Anchoring will be timed. Making sure there is a plan to anchor the boom quickly will improve its standing in the competition. Practice anchoring before the trial begins. The boom will be disqualified if anchoring the boom takes more than two minutes.
 
# When the TA says "go," attach the boom to the anchorage and shout "done" when the boom is anchored. The TA will only stop the timer once there are no more hands touching the boom. The TA will give the anchoring time. This value will be used to compute the boom's design ratio.
# A TA will measure the boom and record the length in the competition spreadsheet for the section
# A TA will attach a basket to the end of the boom and add weights until the boom deflects (bends) 0.2 m vertically. The load supported will be weighed on the lab scale and recorded in the competition spreadsheet for the section (Figure 120)
# The design ratio for the in-person boom design will be used to decide the winner of the competition.
[[Image:lab_boom_5.jpg|frame|center|Figure 20: Sample Competition Spreadsheet]]
 
<p>A TA has prepared an Excel file with the section's results. It can be accessed in the [http://eg.poly.edu/documents.php Lab Documents] section of the EG1003 website. This chart must be included in the PowerPoint presentation and in the Data/Observations section of the lab report. The lab work is now complete. Please clean up the workstation. Return all unused materials to a TA. Refer to the Assignment section for the instructions to prepare the lab report.
 
=Assignment=
 
== Individual Lab Report ==
{{Labs:Lab Report}}
 
 
* Describe the rules of the competition in the Introduction. What consequences did the rules have for any design decisions? Use the appropriate equations in the answer.
* What factors were considered in designing the boom? Was any of the background information used?
* What was the basic weight ratio and design ratio for the design?
* Describe how the components chosen functioned in the design, and describe its height/length/shape
* Describe the advantages and disadvantages of the boom design
* Describe the advantages and disadvantages of the boom design
* Discuss design improvements. How can the design be optimized (i.e. improve the ratio) based on experience?
* Discuss potential design improvements. How can the design be optimized (i.e. improve the design ratio) using the experience gained from this lab?
* Which elements of the boom were stressed by the load, in what directions, and contributed to the failure?
* Which elements of the boom were stressed by the load? Did the load deflect to the side, and if so, did that contribute to the boom failing? Describe the load’s direction and how  the load contributed to the failure?
* How can theoretical models help to predict experimental models?
* Include the Excel spreadsheet with all the boom designs in the class. Discuss other designs in the class
* Does the simulation tell us everything about the system? If not, what sources of error are important to mention?
* Contribution Statement
* Include the spreadsheet with every boom's results. Describe the results and talk about other designs in the class.
 
 
{{Labs:Lab Notes}}
 
<h3>Team PowerPoint Presentation</h3>


{{Labs:Team Presentation}}
===Team PowerPoint Presentation===


<ul>
<ul>
<li>How can the boom design be improved?</li>
<li>How can the boom design be improved?</li>
<li>Other than the examples given in this lab, what are other examples of booms?</li>
<li>Other than the examples given in this lab, what are other boom examples in the real world?</li>
<li>Which elements of the boom (e.g., wooden dowels, 3D printed dowel connectors, Kevlar string, etc.,) were stressed by the load, in what directions, and contributed to the failure?
<li>Which elements of the boom (e.g., wooden dowels, 3D printed dowel connectors, string, etc.,) were stressed by the load, in what directions, and could potentially lead to the failure?
</ul>
</ul>


= References =
== References ==


<i>How Stuff Works</i> website. 2003. SHW Media Network. Retrieved July 28, 2003.
<i>How Stuff Works</i> website. 2003. SHW Media Network. Retrieved July 28, 2003.

Latest revision as of 15:12, 4 October 2024

Objective

The objective of this lab is to design and assemble a boom. The performance of the boom will be judged by a design equation that includes boom mass, boom length, mass held, and anchor time. The team with the highest equation result will win the competition.

Overview

A boom is a device used to lift and move heavy objects that are heavier than the boom itself. Booms can be found everywhere in society, particularly in construction; cantilever bridges and cranes, for example, are common examples of booms.

A common example of a boom is a cantilever bridge, which uses two booms extending from a common base (Figure 1).

Figure 1: A Cable-Stayed (Cantilever) Bridge

The Ed Koch Queensboro Bridge is a double cantilever bridge (Figure 2). It has two bases with two booms extending from each base and the cantilevers placed end to end.

Figure 2: Ed Koch Queensboro Bridge

The Grand Bridge over Newtown Creek is a swing bridge, also known as a rotating bridge (Figure 3). This bridge has two booms mounted on a base that rotates.

Figure 3: Grand Bridge

Figure 4 shows a bascule bridge, more commonly known as a drawbridge. This bridge uses a big, flat boom.

Figure 4: Bascule Bridge


Cranes are another common example of booms. The crane pictured in Figure 5 is a tower crane. These cranes are a fixture on construction sites around the world. A tower crane can lift a 40,000 lb load. It is attached to the ground by anchor bolts driven through a 400,000 lb concrete pad poured a few weeks before the crane is erected (Howstuffworks.com, 2003).

Figure 5: A Tower Crane (Jennings, 2015)

Stress and Strain

Distributing the load being lifted over the length of the boom is the main challenge in boom design. The design must consider the maximum load the boom will be required to lift, how high the load will be lifted, and whether the boom will be moved or remain stationary while loaded. The design of a boom must also consider the properties of the materials used to build the boom.

When an external force is applied to a material, it changes shape (e.g. changes length and cross-section perpendicular to the length). Understanding how deformation will affect materials is a critical consideration in boom design. The mechanical properties and deformation of solids are explained by stress and strain (Serway and Beichner, 2000). Stress is the external force acting on an object per cross sectional area. Strain is the measure of deformation resulting from an applied stress (Figure 6).

Figure 6: Material Under Tension

Tensile stress, σ, is the relationship between an applied force, F, and the cross-sectional area, A (1).

(1)

The resulting strain (2) is calculated by dividing the change in length of the material by the original length. This equation finds the strain for a rod of a material. In (2), ΔL is the change in length and L0 is the rod's original length.

(2)

There are three basic types of stresses; tensile (pulling or stretching), compressive (squeezing or squashing), and shear (bending or cleaving). Consider a straight metal beam. If a tensile stress is applied to both ends of the beam, the length of the beam will increase, while the cross-sectional area of the beam perpendicular to the force applied will decrease. Under compressive stress, the opposite will occur. If the beam is subjected to shear stress, it will bend towards the direction of the applied force, and both the length and cross-sectional area of the beam will become distorted. Figure 7 depicts a graphic representation of the three common forms of stress.

Figure 7: Example of a Boom Under Three Common Modes of Stress

Strain is proportional to stress for material dependent values of strain. If the material is known, it is possible to derive strain from measured stress, and vice-versa, up to a certain level of stress. This proportionality constant is referred to as the elastic modulus, or Young’s modulus. The moduli of different materials is an important factor to consider when designing or building any form of structure that will be under stress.

Stress-Strain Curve

A graph of stress-strain shows the relationship between the stress and strain of a material under load. Figure 8 shows the stress-strain curve of a common metallic building material. In the elastic region, the material will regain its original shape once the stress is removed. The elastic region in Figure 8 is fairly linear. The slope of this linear portion of the stress-strain curve is the elastic modulus.

Figure 8: Stress-Strain Curve of a Material Under Tension

The elastic limit for a material is the maximum strain it can sustain before it becomes permanently deformed (i.e. if the stress is decreased, the object no longer returns to its original size and shape). In the plastic region, the material loses its elasticity and is permanently deformed. A linear approximation with the elastic modulus is no longer accurate.

The ultimate tensile strength is the maximum stress a material can undergo. The fracture stress is the point at which the material breaks. Fracture stress is lower than the ultimate tensile strength of a material because the material has reached that level of stress and has already begun to fail. The cross-sectional area is constantly decreasing until the material finally breaks.

In addition to these intrinsic materials factors, the behavior of materials as they age and are used in service must be considered in boom design. These factors are not applicable to the boom design in this lab, but they must be considered when deciding what material to use for a design. The loss of desirable properties through use, called fatigue, is important. Non-static loads, repeated loading and unloading, or loads that include vibrations or oscillations will eventually lead to failure in service. Special care must be taken with live loads and situations where small motions may be magnified by design features.

There are many factors to consider in any design project. When designing and constructing the boom for this competition, consider the materials being used and what might cause those materials to fail under a load.

Competition Rules

The following rules must be followed to qualify for the competition. Violation of any of these rules will result in the disqualification of the design.

  • The boom must be anchored to the white plastic anchorage provided at the front of the lab
  • The boom mass ratio must be greater than 1
  • The dowels must be used as-is; they cannot be cut further
  • The boom must extend at least 1.5 m horizontally from the front edge of the anchorage for the entire run
  • The boom must start at least 0.30 m from the ground after adding 15 grams of preload
  • The boom must be anchored in 2 min or less
  • The boom may not touch anything but the anchorage
  • The boom’s performance will be assessed by its anchor time, boom mass, boom length, and the mass it can support before deflecting 0.20 m vertically
  • A team can use any number of dowels, as long as their total length is less than or equal to the length of 4 uncut dowels (4 x 122 cm, or 488 cm)

The basic mass ratio (3) is defined via the mass supported in grams divided by the boom mass in grams.

(3)

The winning design will be determined by the competition equation (4) which includes the mass ratio, anchor time in seconds, and boom length in meters.

(4)

Design Considerations

  • How can the boom be built and/or reinforced to prevent as much deflection as possible?
  • In which instances should you use the thin vs thick dowels?
  • What design aspects will maximize and minimize the design equation result?

Materials and Equipment

The following materials are available to construct the boom.

  • Thick dowels (122.00 cm, 81.20 cm, 61.00 cm, 40.60 cm long × 1.10 cm diameter)
  • Thin dowels (122.00 cm, 81.20 cm, 61.00 cm, 40.60 cm long × 0.80 cm diameter)
  • 3D printed dowel adaptors
  • Cellophane tape
  • String


Procedure

Part 1. Boom Design and Construction

  1. Assess the materials and consider the design options, keeping in mind the competition specifications. Preliminary sketches must be completed during this process.
  2. Sketch the basic design in pencil using the lab notes paper provided by a TA. Label the design clearly and have a TA sign and date it.
  3. Construct the boom based on the completed sketch and the available materials. A TA will provide the materials allowed for the design. If the design is modified during the construction phase, make sure to note the changes and describe the reasons for them.
  4. Since anchor space is limited, each boom is only allowed to use an anchor for 10 min at a time. The TAs will keep track of the time, and booms will rotate every 10 min to ensure that every boom has access to an anchor. During the downtime, continue working on the boom to make the best use of the next anchoring opportunity.

Part 2. Competition

Note: Attaching the boom to the anchorage is a critical phase of the competition. Anchoring will be timed. Making a plan to anchor the boom quickly will improve its standing in the competition. Practice anchoring before the trial begins. The boom will be disqualified if anchoring the boom takes more than 2 min.

  1. When the TA says "Go," attach the boom to the anchorage and shout "Done" when the boom is anchored. The TA will only stop the timer once all hands are off the boom. The TA will give the anchoring time that will be used to compute the boom's design ratio.
  2. A TA will measure the horizontal length of the boom and record the length in the competition spreadsheet for the section. The boom must remain past the 1.50 m mark throughout the whole run in order to be an accepted run.
  3. A TA will attach a basket to the end of the boom and add weights until the boom deflects (bends) 0.20 m vertically. The load will be weighed on the lab scale and recorded in the competition spreadsheet for the section.
  4. Calculate the mass with this sheet by filling out the required values colored in gray. Students can also chose to calculate a preliminary mass ratio and competition result by filling out the sheet.
  5. The design ratio for the boom design will be used to decide the winner of the competition.

A TA will prepare an Excel file with the section's results and upload it to the the Lab Documents section of the EG1004 website.

Assignment

Individual Lab Report

  • What factors were considered in designing the boom? Discuss the background information that was used
  • Describe the competition rules, the ratio, and materials in the Introduction. What impact did the rules, the materials and ratio have on any design decisions?
  • Describe the function of each component used in the design
  • Describe the advantages and disadvantages of the boom design
  • Discuss potential design improvements. How can the design be optimized (i.e. improve the design ratio) using the experience gained from this lab?
  • Which elements of the boom were stressed by the load? Did the load deflect to the side, and if so, did that contribute to the boom failing? Describe the load’s direction and how the load contributed to the failure?
  • Include the Excel spreadsheet with all the boom designs in the class. Discuss other designs in the class
  • Contribution Statement

Team PowerPoint Presentation

  • How can the boom design be improved?
  • Other than the examples given in this lab, what are other boom examples in the real world?
  • Which elements of the boom (e.g., wooden dowels, 3D printed dowel connectors, string, etc.,) were stressed by the load, in what directions, and could potentially lead to the failure?

References

How Stuff Works website. 2003. SHW Media Network. Retrieved July 28, 2003. http://science.howstuffworks.com/tower-crane3.htm

Jennings, James. 2015. “Up, UP in a Crane: What Life is Like as a Tower Crane Operator.” Philadelphia. Accessed 14 January 2020 from www.phillymag.com

Serway, R., Beichner, R., Physics for Scientists and Engineers with Modern Physics, 5th Edition. Fort Worth, TX: Saunders College Publishing, 2000