Search results

Jump to: navigation, search

Page title matches

  • {{SLDP: RFP|Biomedical SLDP}} {{SLDP: Milestones and Benchmarks}}
    10 KB (1,468 words) - 18:47, 22 August 2022

Page text matches

  • * [[Biomedical SLDP]] = SLDP Updates =
    7 KB (865 words) - 02:11, 31 August 2022
  • {{SLDP: RFP|Subterranean Infiltrator & Fortune Retriever (SIFR)}} {{SLDP: Real-life Scenarios (Robots)}}
    5 KB (724 words) - 14:56, 11 July 2019
  • {{SLDP: RFP|Mars Rover Robot (MRR)}} {{SLDP: Real-Life Scenarios (Vex Robots)}}
    6 KB (983 words) - 00:56, 19 August 2019
  • ...ceive a penalty of <span style="color: red;">'''2 points'''</span> to your SLDP grade for every missing item ...into your account on eg.poly.edu and clicking the tab on the left labeled "SLDP Final Submission".
    2 KB (285 words) - 02:07, 31 August 2022
  • {{SLDP: RFP|Search & Recovery Robot (SRR)}} {{SLDP: Real-life Scenarios (Robots)}}
    7 KB (1,175 words) - 02:25, 31 August 2022
  • {{SLDP: RFP|Bomb Disarming Robot (BDR)}} {{SLDP: Real-life Scenarios (Robots)}}
    8 KB (1,199 words) - 02:39, 31 August 2022
  • {{SLDP: RFP|Retrieval and Delivery System (RDS)}} {{SLDP: Real-life Scenarios (Robots)}}
    9 KB (1,436 words) - 02:26, 31 August 2022
  • {{SLDP:|Nuclear Regulatory Commission (NRC)}} {{SLDP: Milestones and Benchmarks}}
    6 KB (971 words) - 19:01, 22 August 2022
  • {{SLDP: RFP|Disaster Relief Robot (DRR)}} {{SLDP: Real-life Scenarios (Robots)}}
    10 KB (1,593 words) - 20:00, 23 January 2017
  • ...ing notebook needs to be maintained for each Semester Long Design Project (SLDP) group. ...Google Doc for your engineering notebook and all other files used for your SLDP including but not limited to presentations, CAD files, code, circuit diagra
    5 KB (800 words) - 16:35, 4 March 2024
  • {{SLDP: RFP|Autonomous Underwater Vehicle (AUV)}} {{SLDP: Real-life Scenarios (Robots)}}
    9 KB (1,429 words) - 15:06, 4 May 2018
  • {{SLDP: RFP|Autonomous Underwater Vehicle (AUV)}} {{SLDP: Real-life Scenarios (Robots)}}
    9 KB (1,437 words) - 15:06, 4 May 2018
  • {{SLDP: RFP|Security Infiltration Drone (SID)}} {{SLDP: Real-life Scenarios (Robots)}}
    13 KB (2,119 words) - 16:48, 17 April 2018
  • {{SLDP: RFP|Mars Rover Robot (MRR)}} {{SLDP: Real-life Scenarios (Robots)}}
    10 KB (1,576 words) - 18:41, 22 August 2022
  • <li>SLDP Early Submission (Week) <li>SLDP Standard Submission (Week)
    6 KB (813 words) - 14:18, 28 April 2016
  • {{SLDP: RFP|Autonomous Underwater Vehicle (AUV)}} {{SLDP: Real-life Scenarios (Robots)}}
    10 KB (1,615 words) - 15:01, 8 August 2018
  • {{SLDP: RFP|Autonomous Underwater Vehicle (AUV)}} {{SLDP: Real-life Scenarios (Robots)}}
    10 KB (1,716 words) - 17:24, 4 November 2018
  • {{SLDP: RFP|Biomedical SLDP}} {{SLDP: Milestones and Benchmarks}}
    10 KB (1,468 words) - 18:47, 22 August 2022
  • <li>SLDP Early Submission (Week) <li>SLDP Standard Submission (Week)
    6 KB (863 words) - 02:03, 31 August 2022
  • ...Lego Computer Aided Design), and through this, the needed design for your SLDP will be met.
    5 KB (856 words) - 03:07, 11 July 2011

View (previous 20 | next 20) (20 | 50 | 100 | 250 | 500)