Fall 2012 Project Configurations
From EG1004 Lab Manual
Revision as of 02:36, 24 September 2012 by Admin (talk | contribs) (moved Summer 2012 Project Configurations to Fall 2012 Project Configurations)
Displayed below are pictures of the Summer 2012 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.
Bomb Disarming Robot (BDR)
Search & Recovery Robot (SRR)
Disaster Relief Robot (DRR)
Retrieval and Delivery System (RDS)
|