Request for Proposal: Rapid Assembly and Design Challenge


Introduction and Overview

File:Test 1.jpg

In a rapidly progressing and innovation-focused world, there is constantly a push for originality and revolutionary new ideas. As the future of engineering, you have been called upon by the National Academy of Engineering (NAE) in collaboration with NYU Tandon School of Engineering to propose unique, intriguing ideas that will promote technological advancement and improve quality of life. The National Academy of Engineering wants to see how the new generation of engineers will address the Engineering Grand Challenges and technological problems the world faces. They want to reward innovative and exceptional designs and prototypes.

Your team is tasked with identifying a problem that needs to be solved, and then moving forward to propose and develop a solution. At the end of this semester, you will be expected to have a working prototype that you can showcase to your professors and teaching assistants. The product that shows the most creativity, promise, and innovative excellence will win an award. The goal of this endeavor is to address an engineering problem that you believe you can solve or begin to solve. You have the freedom to propose any idea you believe has merit, be it a completely new technology or one that you aspire to adapt. If your proposal is selected, then you will be expected to move forward with your idea and have a concrete prototype by the end of the semester. You will be graded on the effort that is put into the project and in understanding the engineering design process, as well as your ability to explain what you learn from your engineering design endeavor.

Specifications

You will be utilizing the General Engineering Prototyping Lab and the NYU Tandon MakerSpace to design your projects. The General Engineering Program will provide any applicable tools necessary to assist in prototyping and assembly. An upperclassman mentor from the General Engineering Program will be provided to you. This mentor will act as a guide for you throughout the duration of this project. They will do the majority of your grading, and stay in contact with you about what deliverables will be due and when. You have the freedom to propose an idea based in innovation and/or solving an engineering problem. Once your proposal has been selected by professors and other staff, you will work with your team to meet the goals that you, your mentor, and the professors have agreed upon. In order to complete your project to the best of your ability, you have a budget to order parts that you require. You will communicate what you need to purchase to your mentor, who is in charge of placing your orders and delivering them to you. You will need to submit all deliverables, meet Benchmarks, and complete Milestone presentations on time. Student prototypes will be judged by professors at the end of the semester, and the best teams will be awarded a prize.

Example Project Ideas

  • Air quality tracking and alarm system
  • Drone that can retrieve and deliver small objects
  • Wearable device that uses renewable energy
  • Gesture control of a computer screen
  • Blood sugar medical wearable device
  • Sensors that monitor and help correct posture

Creativity and innovation are always rewarded.

Microsoft Project

A time management plan using Microsoft Project (MS Project) must be created. You can learn Microsoft Project by doing the Project Skill Builder. This plan must include all tasks related to the project. The MS Project schedule should include the following:

  • Minimum of 20 tasks.
  • Milestones should be clearly indicated on the project plan (duration of zero days).
  • Each task must include the person responsible for completing the task (resource names).
  • Use the Copy Picture function to include the project plan in the presentations. DO NOT take a screenshot.
  • Gantt chart must be displayed alongside the tasks list (fit onto one slide).
  • Gantt chart must clearly show a progress line.
  • Clearly state during the presentation whether the project is on time, behind schedule or ahead of schedule

For help in planning the project, review the page called How to plan the schedule and calculate costs for a project.

Cost Estimate

A cost estimate must be generated that specifies the cost of all the materials and labor required for the construction of the design. Tabulate this cost information clearly in an Excel spreadsheet. Help in calculating the cost is available by reviewing How to plan the schedule and calculate costs for a project. Try to choose parts from amazon.com for ease of purchasing and fast delivery.

Note: You need to provide a cost estimate with a list of parts in your Design and Feasibility Report. Any adjustments or changes over the semester must be documented and shown to your mentor. Be very sure of the parts you ask your mentor to purchase, as you do have a budget of $300.00.

The cost estimate should include the following:

  • Labor cost breakdown with hours and rates
  • Cost of all materials and components
  • Total cost must be shown in the bottom right corner
  • No decimal places; this is an estimate after all. Round appropriately

Milestones, Benchmarks, and Deliverables

As you work on your project, you will be required to present periodic reports on your progress. We call these Milestones. All the items assigned in each Milestone are called deliverables. These deliverables often consist of a combination of written submissions, presentations, and demonstrations. Additionally, you will be required to meet certain benchmarks assigned by your mentor, and hand in reports/deliverables that add to the progress and comprehensiveness of your project.

Design & Feasibility Report

The Design and Feasibility Report is extremely important, as it lays the groundwork for your project. You will be outlining your project idea, inspiration, and goals. The items that are outlined in the cost estimate will be purchased, so choose carefully.

Must include:

  • Project Overview
  • Goals
  • Design & Approach
  • Cost Estimate (budget of $300.00)

The Design and Feasibility Report is due to your mentor by email at the designated due date provided to you (one week after SLDP groups are determined). A basic outline of what your DFR should look like can be found here: INSERT LINK

Milestone 1

Milestone 1 should act as a presentation of your Design and Feasibility Report. Without simply replicating your report in presentation format, take the key points to present in a concise and clear manner. The section formatting should be similar to that of the report. It is important that you outline your project goals and show that your project is realizable.

Must include:

  • Project Overview
  • Goals
  • Design & Approach
  • Cost Estimate (budget of $300.00)
  • Detailed Sketch/Schematic


Look Ahead: What tasks are planned between now and Milestone 2?

See How To Give a Milestone Presentation for the format of a Milestone presentation. Because your project will differ in format from other SLDPs, please treat this How-To as a helpful, but not exact, guideline. Your exact Milestone 1 requirements and presentation format will be given to you by your mentor.

Benchmark Assessment A

Benchmark assessments evaluate the progress of the project. Benchmark Assessment A is due at the end of Model Shop Session 1. There are penalties for not completing on time. Refer to the EG1004 Grading Policy for more information.

For your benchmarks, your mentor will outline specific goals that your project must achieve to satisfy the benchmark. These goals will vary depending on project and mentor, and will be determined based on the particular project’s level of difficulty.

Milestone 2

Milestone 2 will be a project progress update-how was benchmark A (complete? Why or why not), changes they plan on making, removing, adding to budget?

Must include:

  • Project Overview
  • Drawings/Relevant Images
  • Design & Approach Changes
  • Updated Cost Estimate (budget of $300.00)
  • Explanation of all code (if applicable)
  • Updated Sketches

Look Ahead: What tasks are planned between now and Milestone 3?

See To Give a Milestone Presentation for the format of a Milestone presentation, but remember that your format will differ slightly.

Benchmark Assessment B

Benchmark Assessment B is due at the end of Model Shop Session 2. There are penalties for not completing on time. Refer to the EG1004 Grading Policy for more information.

Again, your Benchmark B requirements will be determined and outlined to you by your mentor.


Milestone 3

Milestone 3 status update, close to having concrete prototype, testing status

Updated deliverables, any changes

Look ahead: What tasks are planned between now and the completion of the project?

See To Give a Milestone Presentation for the format of a Milestone presentation, but remember that your format will differ slightly.

Commissioning

Projects must be commissioned before Submission. Refer to the syllabus for Submission deadlines. There are penalties for not completing this on time. Refer to the EG1004 Grading Policy for more information.

To pass, the design must complete all of the following:

  • Fully functional prototype or proof of concept
  • Any additional deliverables designated to you by your mentor
    • Microsoft Project Schedule
    • Cost Estimate
    • Any applicable drawings or schematics
    • Etc.

Final Presentation

The Final Presentation will be a technical briefing, similar to the Milestones, but also serves as a sales presentation explaining why your company should be selected instead of the competition.

Your Final Presentation must include:

  • Company profile
    • Company name
    • Employee profile, role(s), and qualifications
    • Mission statement
  • Problem statement
    • Why is the project happening?
    • What does the audience need to know?
  • Project objective
    • What is the purpose of your project?
    • Who does your project help?
    • What problem does your project solve?
  • Project description
    • Specify LEED certification
      • Examples of LEED implementations in Revit
    • Revit drawings
      • All floor plan drawings
      • Dimensions
      • 1:240 scale
    • Views of exterior of building: front elevation, side elevation, isometric elevation
      • Dimensions
  • Market and product viability
    • Does your company have competitors?
    • What makes your project unique?
    • How does your design compare to competitors - cost, quality, features?
    • Is the project versatile?
    • What is the price of your project?
  • Conclusion
    • Reiterating project purpose
    • Highlight project features
    • Future goals of the company
    • Why should your company be awarded this contract?
  • Video pitch
  • Reflection on project outcomes
  • Possible improvements for the future
  • All relevent documents (i.e. lab notes, .stl files, code, drawings, etc.)
  • Final cost table and schedule

The Final Design Report is due to your mentor by email, and will be due at the time that your section’s Lab 11 report is due. The Final Design Report will be submitted in place of your Lab 11 report.

Final Presentation

The Final Presentation will be a technical briefing, similar to the Milestones, but also serves as a sales presentation explaining why your company should be selected instead of the competition.

Your Final Presentation must include:

  • Company profile
    • Company name
    • Employee profile, role(s), and qualifications
    • Mission statement
  • Problem statement
    • Why is the project happening?
    • What does the audience need to know?
  • Project objective
    • What is the purpose of your project?
    • Who does your project help?
    • What problem does your project solve?
  • Project description
    • Specify LEED certification
      • Examples of LEED implementations in Revit
    • Revit drawings
      • All floor plan drawings
      • Dimensions
      • 1:240 scale
    • Views of exterior of building: front elevation, side elevation, isometric elevation
      • Dimensions
  • Market and product viability
    • Does your company have competitors?
    • What makes your project unique?
    • How does your design compare to competitors - cost, quality, features?
    • Is the project versatile?
    • What is the price of your project?
  • Conclusion
    • Reiterating project purpose
    • Highlight project features
    • Future goals of the company
    • Why should your company be awarded this contract?
  • Video pitch
  • Problem statement
  • Solution overview
  • Company description and qualifications
  • Any applicable drawings
  • Any applicable code/schematics
  • Cost estimate
  • Microsoft Project schedule
  • Future Goals
  • Video demonstration of prototype in use
  • Why should the company be awarded this contract?

Submission

All SLDPs must be submitted online. Please visit this page for the link to the Project Submission form and each project’s individualized login information. To submit, login to the EG1004 website using this special login information. Submitting with an NYU account or any other account will generate an error. Components may be resubmitted at any time before the deadline. Please note that submission times are based on the most recent submission.

Please note the deliverables for this project are as follows. If any of the following items are omitted, there will be a penalty. Be sure to click "Submit" at the bottom of the form and allow sufficient time for uploading. The following list includes deliverable items that are required:

  • Submission deliverables:
    • Cover page and table of contents
    • Final presentation
    • Applicable code/schematics
    • Any drawings of your design (initial through final)
    • Video of prototype in use
    • Final MS Project Schedule
    • ** Final cost estimate

Resume(s) (No fictitious resumes will be accepted.)