Spring 2012 Project Configurations
From EG1004 Lab Manual
Revision as of 00:39, 1 February 2012 by Admin (talk | contribs) (→Retrieval and Delivery System (RDS))
Displayed below are pictures of the Spring 2012 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.
Bomb Disarming Robot (BDR)
Issues
- Triangulation devices missing
- Retake Course Overview and Disarm photos
Issues
- Triangulation devices missing
- Retake Course Overview and Disarm photos
Search & Recovery Robot (SRR)
Issues
- Unity and Quest are not centered on their tiles.
- Retake both Course Overview photos, Unity photo, and Quest photo.
Disaster Relief Robot (DRR)
Issues
- Course Overview #2 picture is blurry
- Loose wall on 2nd level is not loose
- Red can off its mark
- Retake both Course Overview photos
Retrieval and Delivery System (RDS)
Issues
- Hospitals should be empty.
- Some bottle caps missing ping pong balls.
- Retake both Course Overview photos
|