Difference between revisions of "Fall 2012 Project Configurations"
From EG1004 Lab Manual
m (Protected "Fall 2012 Project Configurations" ([edit=sysop] (indefinite) [move=sysop] (indefinite))) |
|||
Line 1: | Line 1: | ||
Displayed below are pictures of the | Displayed below are pictures of the Fall 2012 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects. | ||
== Bomb Disarming Robot (BDR) == | == Bomb Disarming Robot (BDR) == |
Revision as of 04:30, 24 September 2012
Displayed below are pictures of the Fall 2012 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.
Bomb Disarming Robot (BDR)
Search & Recovery Robot (SRR)
Disaster Relief Robot (DRR)
Retrieval and Delivery System (RDS)
|