Difference between revisions of "Spring 2012 Project Configurations"
From EG1004 Lab Manual
Line 18: | Line 18: | ||
[[Image:Sp12SRRb.jpg|thumb|right|200px|Location of Quest (Joint Airlock)]] | [[Image:Sp12SRRb.jpg|thumb|right|200px|Location of Quest (Joint Airlock)]] | ||
[[Image:Sp12SRRr.jpg|thumb|right|200px|Location of Pirs (Docking Compartment)]] | [[Image:Sp12SRRr.jpg|thumb|right|200px|Location of Pirs (Docking Compartment)]] | ||
<br style="clear: both;" /> | <br style="clear: both;" /> | ||
Revision as of 04:34, 4 February 2012
Displayed below are pictures of the Spring 2012 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.
Bomb Disarming Robot (BDR)
Search & Recovery Robot (SRR)
Disaster Relief Robot (DRR)
DRR Issues
- Course Overview #2 picture is blurry
- Loose wall on 2nd level is not loose
- Red can off its mark
- Retake both Course Overview photos
Retrieval and Delivery System (RDS)
RDS Issues
- Hospitals should be empty.
- Some bottle caps missing ping pong balls.
- Retake both Course Overview photos
|