Difference between revisions of "Spring 2012 Project Configurations"
From EG1004 Lab Manual
Line 32: | Line 32: | ||
[[Image:Sp12DRR1.jpg|thumb|left|650px|Course Overview]] | [[Image:Sp12DRR1.jpg|thumb|left|650px|Course Overview]] | ||
[[Image:Sp12DRR2.jpg|thumb|right|650px|Course Overview]] | [[Image:Sp12DRR2.jpg|thumb|right|650px|Course Overview]] | ||
=== Issues === | |||
* Course Overview #2 picture is blurry | |||
* Loose wall on 2nd level is not loose | |||
* Red can off its mark | |||
** Retake both Course Overview photos | |||
<br style="clear: both;" /> | <br style="clear: both;" /> | ||
Revision as of 00:37, 1 February 2012
Displayed below are pictures of the Spring 2012 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.
Bomb Disarming Robot (BDR)
Issues
- Triangulation devices missing
- Retake Course Overview and Disarm photos
Issues
- Triangulation devices missing
- Retake Course Overview and Disarm photos
Search & Recovery Robot (SRR)
Issues
- Unity and Quest are not centered on their tiles.
- Retake both Course Overview photos, Unity photo, and Quest photo.
Disaster Relief Robot (DRR)
Issues
- Course Overview #2 picture is blurry
- Loose wall on 2nd level is not loose
- Red can off its mark
- Retake both Course Overview photos
Retrieval and Delivery System (RDS)
|