Difference between revisions of "Summer 2017 Project Configurations"
From EG1004 Lab Manual
Line 35: | Line 35: | ||
== Mars Rover Robot (MRR) == | == Mars Rover Robot (MRR) == | ||
[[Image:Su17MRR1. | [[Image:Su17MRR1.png|thumb|left|650px|Course Overview]] | ||
[[Image:Su17MRR2.jpg|thumb|right|650px|Course Overview]] | [[Image:Su17MRR2.jpg|thumb|right|650px|Course Overview]] | ||
<br style="clear: both;" /> | <br style="clear: both;" /> | ||
{{Semester-Long Design Project}} | {{Semester-Long Design Project}} |
Revision as of 01:14, 6 July 2017
Displayed below are pictures of the Summer 2017 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Retrieval and Delivery System, and Mars Rover Robot Semester-Long Design Projects.
Bomb Disarming Robot: Day (BDRD)
Bomb Disarming Robot: Night (BDRN)
Search & Recovery Robot (SRR)
Retrieval and Delivery System (RDS)
Security Infiltration Drone (SID)
Mars Rover Robot (MRR)
|