Difference between revisions of "Summer 2017 Project Configurations"

From EG1004 Lab Manual
Jump to: navigation, search
Line 1: Line 1:
Displayed below are pictures of the Summer 2017 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, Retrieval and Delivery System, and Mars Rover Robot Semester-Long Design Projects.
Displayed below are pictures of the Summer 2017 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Retrieval and Delivery System, and Mars Rover Robot Semester-Long Design Projects.


== Bomb Disarming Robot: Day (BDRD) ==
== Bomb Disarming Robot: Day (BDRD) ==

Revision as of 16:42, 5 July 2017

Displayed below are pictures of the Summer 2017 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Retrieval and Delivery System, and Mars Rover Robot Semester-Long Design Projects.

Bomb Disarming Robot: Day (BDRD)

Course Overview
File:Su17BDRd4.jpg
Disarm Button
Course Overview


Bomb Disarming Robot: Night (BDRN)

Course Overview
File:Su17BDRn4.jpg
Disarm Button
Course Overview


Search & Recovery Robot (SRR)

Course Overview
File:Su17SRRg.jpg
Location of Zarya (Power Supply)
File:Su17SRRy.jpg
Location of Unity (Node 1)
File:Su17SRR2.jpg
Course Overview
File:Su17SRRb.jpg
Location of Quest (Joint Airlock)
File:Su17SRRr.jpg
Location of Pirs (Docking Compartment)


Retrieval and Delivery System (RDS)

Course Overview
Course Overview


Security Infiltration Drone (SID)

Course Overview
Course Overview


Mars Rover Robot (MRR)

File:Su17MRR1.jpg
Course Overview
File:Su17MRR2.jpg
Course Overview