Difference between revisions of "Spring 2012 Project Configurations"

From EG1004 Lab Manual
Jump to: navigation, search
Line 42: Line 42:
[[Image:Sp12RDS1.jpg|thumb|left|650px|Course Overview]]
[[Image:Sp12RDS1.jpg|thumb|left|650px|Course Overview]]
[[Image:Sp12RDS2.jpg|thumb|right|650px|Course Overview]]
[[Image:Sp12RDS2.jpg|thumb|right|650px|Course Overview]]
=== Issues ===
* Hospitals should be empty.
* Some bottle caps missing ping pong balls.
** Retake both Course Overview photos
<br style="clear: both;" />
<br style="clear: both;" />


{{Semester-Long Design Project}}
{{Semester-Long Design Project}}

Revision as of 00:39, 1 February 2012

Displayed below are pictures of the Spring 2012 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.

Bomb Disarming Robot (BDR)

Course Overview of Day Version
Location of Decoy Bomb in Tunnel
Disarm Button

Issues

  • Triangulation devices missing
    • Retake Course Overview and Disarm photos


Course Overview of Night Version
Location of Decoy Bomb in Tunnel
Disarm Button

Issues

  • Triangulation devices missing
    • Retake Course Overview and Disarm photos


Search & Recovery Robot (SRR)

Course Overview
Location of Zarya (Power Supply)
Location of Unity (Node 1)
Course Overview
Location of Quest (Joint Airlock)
Location of Pirs (Docking Compartment)

Issues

  • Unity and Quest are not centered on their tiles.
    • Retake both Course Overview photos, Unity photo, and Quest photo.


Disaster Relief Robot (DRR)

Course Overview
Course Overview

Issues

  • Course Overview #2 picture is blurry
  • Loose wall on 2nd level is not loose
  • Red can off its mark
    • Retake both Course Overview photos


Retrieval and Delivery System (RDS)

Course Overview
Course Overview

Issues

  • Hospitals should be empty.
  • Some bottle caps missing ping pong balls.
    • Retake both Course Overview photos