Difference between revisions of "Spring 2011 Project Configurations"

From EG1004 Lab Manual
Jump to: navigation, search
(Deadline Update)
Line 1: Line 1:
Displayed below are pictures of the Spring 2011 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.
Displayed below are pictures of the Spring 2011 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.


{{Missing Content|new=yes|time=by the end of January}}
{{Missing Content|new=yes|time=by 2/11/11}}


== Bomb Disarming Robot (BDR) ==
== Bomb Disarming Robot (BDR) ==

Revision as of 18:15, 4 February 2011

Displayed below are pictures of the Spring 2011 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.

Bomb Disarming Robot (BDR)

Course Overview of Day Version
Course Overview of Night Version
Location of Decoy Bomb in Black Tunnel
Disarm Button


Search & Recovery Robot (SRR)

Course Overview
Location of Quest (Joint Airlock)
Location of Unity (Node 1)


Disaster Relief Robot (DRR)

Course Overview

Retrieval and Delivery System (RDS)

Course Overview