Difference between revisions of "Spring 2017 Project Configurations"

From EG1004 Lab Manual
Jump to: navigation, search
(Created page with "Displayed below are pictures of the Spring 2017 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Seme…")
 
 
Line 1: Line 1:
Displayed below are pictures of the Spring 2017 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.
Displayed below are pictures of the Spring 2017 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, Retrieval and Delivery System, and Mars Rover Robot Semester-Long Design Projects.


== Bomb Disarming Robot: Day (BDRD) ==
== Bomb Disarming Robot: Day (BDRD) ==

Latest revision as of 23:46, 24 January 2017

Displayed below are pictures of the Spring 2017 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, Retrieval and Delivery System, and Mars Rover Robot Semester-Long Design Projects.

Bomb Disarming Robot: Day (BDRD)

Course Overview
File:Sp17BDRd4.jpg
Disarm Button
Course Overview


Bomb Disarming Robot: Night (BDRN)

File:Sp17BDRn1.jpg
Course Overview
File:Sp17BDRn4.jpg
Disarm Button
File:Sp17BDRn2.jpg
Course Overview


Search & Recovery Robot (SRR)

Course Overview
Location of Zarya (Power Supply)
Location of Unity (Node 1)
Course Overview
Location of Quest (Joint Airlock)
File:Sp17SRRr.jpg
Location of Pirs (Docking Compartment)


Disaster Relief Robot (DRR)

Course Overview
Course Overview


Retrieval and Delivery System (RDS)

Course Overview
Course Overview


Security Infiltration Drone (SID)

Course Overview
Course Overview


Mars Rover Robot (MRR)

Course Overview
File:Sp17MRR2.jpg
Course Overview