Difference between revisions of "Spring 2012 Project Configurations"
From EG1004 Lab Manual
(10 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
Displayed below are pictures of the | Displayed below are pictures of the Spring 2012 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects. | ||
== Bomb Disarming Robot (BDR) == | == Bomb Disarming Robot (BDR) == |
Latest revision as of 04:44, 4 February 2012
Displayed below are pictures of the Spring 2012 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.
Bomb Disarming Robot (BDR)
Search & Recovery Robot (SRR)
Disaster Relief Robot (DRR)
Retrieval and Delivery System (RDS)
|