Difference between revisions of "Spring 2011 Project Configurations"
From EG1004 Lab Manual
m (9 revisions) |
|
(No difference)
|
Latest revision as of 03:09, 11 July 2011
Displayed below are pictures of the Spring 2011 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.
Bomb Disarming Robot (BDR)
Search & Recovery Robot (SRR)
Disaster Relief Robot (DRR)
Retrieval and Delivery System (RDS)
|