Difference between revisions of "Summer 2017 Project Configurations"
From EG1004 Lab Manual
Line 1: | Line 1: | ||
Displayed below are pictures of the Summer 2017 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Retrieval and Delivery System, and Mars Rover Robot Semester-Long Design Projects. | Displayed below are pictures of the Summer 2017 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Retrieval and Delivery System, and Mars Rover Robot Semester-Long Design Projects. | ||
== Bomb Disarming Robot | == Bomb Disarming Robot (BDR) == | ||
[[Image:Su17BDRn1.jpg|thumb|left|500px|Course Overview]] | [[Image:Su17BDRn1.jpg|thumb|left|500px|Course Overview]] | ||
[[Image:Su17BDRn3.jpg|thumb|right|200px|Decoy Bomb]] | [[Image:Su17BDRn3.jpg|thumb|right|200px|Decoy Bomb]] |
Revision as of 17:09, 12 July 2017
Displayed below are pictures of the Summer 2017 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Retrieval and Delivery System, and Mars Rover Robot Semester-Long Design Projects.
Bomb Disarming Robot (BDR)
Search & Recovery Robot (SRR)
Retrieval and Delivery System (RDS)
Security Infiltration Drone (SID)
Mars Rover Robot (MRR)
|