Difference between revisions of "Summer 2017 Project Configurations"
From EG1004 Lab Manual
Line 19: | Line 19: | ||
[[Image:Su17SRRg.jpg|thumb|right|200px|Location of Zarya (Power Supply)]] | [[Image:Su17SRRg.jpg|thumb|right|200px|Location of Zarya (Power Supply)]] | ||
[[Image:Su17SRRy.jpg|thumb|right|200px|Location of Unity (Node 1)]] | [[Image:Su17SRRy.jpg|thumb|right|200px|Location of Unity (Node 1)]] | ||
[[Image:Su17SRR2. | [[Image:Su17SRR2.png|thumb|left|500px|Course Overview]] | ||
[[Image:Su17SRRb.jpg|thumb|right|200px|Location of Quest (Joint Airlock)]] | [[Image:Su17SRRb.jpg|thumb|right|200px|Location of Quest (Joint Airlock)]] | ||
[[Image:Su17SRRr.jpg|thumb|right|200px|Location of Pirs (Docking Compartment)]] | [[Image:Su17SRRr.jpg|thumb|right|200px|Location of Pirs (Docking Compartment)]] |
Revision as of 01:15, 6 July 2017
Displayed below are pictures of the Summer 2017 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Retrieval and Delivery System, and Mars Rover Robot Semester-Long Design Projects.
Bomb Disarming Robot: Day (BDRD)
Bomb Disarming Robot: Night (BDRN)
Search & Recovery Robot (SRR)
Retrieval and Delivery System (RDS)
Security Infiltration Drone (SID)
Mars Rover Robot (MRR)
|