Difference between revisions of "Summer 2017 Project Configurations"
From EG1004 Lab Manual
Line 1: | Line 1: | ||
Displayed below are pictures of the Summer 2017 configurations of the Bomb Disarming Robot, Search & Recovery | Displayed below are pictures of the Summer 2017 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Retrieval and Delivery System, and Mars Rover Robot Semester-Long Design Projects. | ||
== Bomb Disarming Robot: Day (BDRD) == | == Bomb Disarming Robot: Day (BDRD) == |
Revision as of 16:42, 5 July 2017
Displayed below are pictures of the Summer 2017 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Retrieval and Delivery System, and Mars Rover Robot Semester-Long Design Projects.
Bomb Disarming Robot: Day (BDRD)
Bomb Disarming Robot: Night (BDRN)
Search & Recovery Robot (SRR)
Retrieval and Delivery System (RDS)
Security Infiltration Drone (SID)
Mars Rover Robot (MRR)
|