Difference between revisions of "Spring 2017 Project Configurations"
From EG1004 Lab Manual
(Created page with "Displayed below are pictures of the Spring 2017 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Seme…") |
|||
Line 1: | Line 1: | ||
Displayed below are pictures of the Spring 2017 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, | Displayed below are pictures of the Spring 2017 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, Retrieval and Delivery System, and Mars Rover Robot Semester-Long Design Projects. | ||
== Bomb Disarming Robot: Day (BDRD) == | == Bomb Disarming Robot: Day (BDRD) == |
Latest revision as of 23:46, 24 January 2017
Displayed below are pictures of the Spring 2017 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, Retrieval and Delivery System, and Mars Rover Robot Semester-Long Design Projects.
Bomb Disarming Robot: Day (BDRD)
Bomb Disarming Robot: Night (BDRN)
Search & Recovery Robot (SRR)
Disaster Relief Robot (DRR)
Retrieval and Delivery System (RDS)
Security Infiltration Drone (SID)
Mars Rover Robot (MRR)
|