Difference between revisions of "Fall 2012 Project Configurations"
From EG1004 Lab Manual
(Created page with 'Displayed below are pictures of the Summer 2012 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Seme…') |
m (Unprotected "Fall 2012 Project Configurations") |
||
(3 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
Displayed below are pictures of the | Displayed below are pictures of the Fall 2012 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects. | ||
== Bomb Disarming Robot (BDR) == | == Bomb Disarming Robot (BDR) == |
Latest revision as of 23:25, 10 October 2015
Displayed below are pictures of the Fall 2012 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.
Bomb Disarming Robot (BDR)
Search & Recovery Robot (SRR)
Disaster Relief Robot (DRR)
Retrieval and Delivery System (RDS)
|