Difference between revisions of "Spring 2011 Project Configurations"
From EG1004 Lab Manual
| Line 1: | Line 1: | ||
Displayed below are pictures of the Spring 2011 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects. | Displayed below are pictures of the Spring 2011 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects. | ||
{{Missing Content|time=by the end of January}} | {{Missing Content|new=yes|time=by the end of January}} | ||
== Bomb Disarming Robot (BDR) == | == Bomb Disarming Robot (BDR) == | ||
Revision as of 11:35, 24 January 2011
Displayed below are pictures of the Spring 2011 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.
| This newly created entry is currently missing content. It will be added by the end of January. At this time, you may direct any questions you have toward your TA. |
Bomb Disarming Robot (BDR)
Search & Recovery Robot (SRR)
Disaster Relief Robot (DRR)
Retrieval and Delivery System (RDS)
| ||||||||