Difference between revisions of "Spring 2011 Project Configurations"
From EG1004 Lab Manual
(Added "Under Construction" template for missing images) |
|||
Line 1: | Line 1: | ||
Displayed below are pictures of the Spring 2011 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects. | Displayed below are pictures of the Spring 2011 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects. | ||
{{ | {{Missing Content|time=by the end of January}} | ||
== Bomb Disarming Robot (BDR) == | == Bomb Disarming Robot (BDR) == |
Revision as of 11:31, 24 January 2011
Displayed below are pictures of the Spring 2011 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.
This page is currently missing content. It will be added by the end of January. At this time, you may direct any questions you have toward your TA. |
Bomb Disarming Robot (BDR)
Search & Recovery Robot (SRR)
Disaster Relief Robot (DRR)
Retrieval and Delivery System (RDS)
|