= Milestones and Benchmarks =
= Milestones, Benchmarks, and Deliverables =
As you work on your project, you will be required to present periodic reports on your progress. We call these Milestones. All the items assigned in each Milestone are called deliverables. These deliverables often consist of a combination of written submissions, presentations, and demonstrations.
As work is done on the project, three Milestone presentations will report on the project's progress. All of the items assigned in each phase of the project are called Benchmark deliverables. These deliverables often consist of a combination of written submissions, presentations, and demonstrations. Benchmark assessments evaluate the progress of the project.
 
== Preliminary Design Investigation ==
The Preliminary Design Investigation (PDI) is extremely important, as it lays the groundwork for the project. It outlines the project idea, inspiration, and goals.
 
The PDI must include:
*Cover Page
*Project Overview
*Goals & Objectives
*Design & Approach
*Cost Estimate
*Project Schedule
*Relevant Pictures
 
An example PDI template can be found [[Media:MRR_PDI_Template_1004.docx|here]]. <b>The PDI is due by Benchmark A.</b> Do not forget to include the items listed above. Use this link to access the [[Media:VEX_PDI_Rubric.docx|VEX PDI Rubric]].

Latest revision as of 18:07, 4 September 2023

Milestones, Benchmarks, and Deliverables

As work is done on the project, three Milestone presentations will report on the project's progress. All of the items assigned in each phase of the project are called Benchmark deliverables. These deliverables often consist of a combination of written submissions, presentations, and demonstrations. Benchmark assessments evaluate the progress of the project.

Preliminary Design Investigation

The Preliminary Design Investigation (PDI) is extremely important, as it lays the groundwork for the project. It outlines the project idea, inspiration, and goals.

The PDI must include:

  • Cover Page
  • Project Overview
  • Goals & Objectives
  • Design & Approach
  • Cost Estimate
  • Project Schedule
  • Relevant Pictures

An example PDI template can be found here. The PDI is due by Benchmark A. Do not forget to include the items listed above. Use this link to access the VEX PDI Rubric.