Difference between revisions of "Template:SLDP: Milestones and Benchmarks"

From EG1004 Lab Manual
Jump to: navigation, search
 
(17 intermediate revisions by 3 users not shown)
Line 1: Line 1:
= Milestones, Benchmarks, and Deliverables =
= Milestones, Benchmarks, and Deliverables =
As you work on your project, you will be required to present periodic reports on your progress. We call these Milestones. All the items assigned in each Milestone are called deliverables. These deliverables often consist of a combination of written submissions, presentations, and demonstrations.
As work is done on the project, three Milestone presentations will report on the project's progress. All of the items assigned in each phase of the project are called Benchmark deliverables. These deliverables often consist of a combination of written submissions, presentations, and demonstrations. Benchmark assessments evaluate the progress of the project.


== Design & Feasibility Report ==
== Preliminary Design Investigation ==
The Design and Feasibility Report (DFR) is extremely important, as it lays the groundwork for your project. You will be outlining your project idea, inspiration, and goals.  
The Preliminary Design Investigation (PDI) is extremely important, as it lays the groundwork for the project. It outlines the project idea, inspiration, and goals.  


The DFR must include:
The PDI must include:
*Cover Page
*Cover Page
*Project Overview
*Project Overview
Line 14: Line 14:
*Relevant Pictures
*Relevant Pictures


<b>The DFR is due by Benchmark A.</b> The report needs to be approved by an Open Lab TA to complete Benchmark A. Do not forget to include the items listed above. Use this link to access the [https://docs.google.com/document/d/15YI7-2Ca17EkAtsqrFwR6ZgStSUpkO9tbKHWVtxQp9g/edit DFR Rubric].
An example PDI template can be found [[Media:MRR_PDI_Template_1004.docx|here]]. <b>The PDI is due by Benchmark A.</b> Do not forget to include the items listed above. Use this link to access the [[Media:VEX_PDI_Rubric.docx|VEX PDI Rubric]].

Latest revision as of 18:07, 4 September 2023

Milestones, Benchmarks, and Deliverables

As work is done on the project, three Milestone presentations will report on the project's progress. All of the items assigned in each phase of the project are called Benchmark deliverables. These deliverables often consist of a combination of written submissions, presentations, and demonstrations. Benchmark assessments evaluate the progress of the project.

Preliminary Design Investigation

The Preliminary Design Investigation (PDI) is extremely important, as it lays the groundwork for the project. It outlines the project idea, inspiration, and goals.

The PDI must include:

  • Cover Page
  • Project Overview
  • Goals & Objectives
  • Design & Approach
  • Cost Estimate
  • Project Schedule
  • Relevant Pictures

An example PDI template can be found here. The PDI is due by Benchmark A. Do not forget to include the items listed above. Use this link to access the VEX PDI Rubric.