Summer 2009 Project Configurations
From EG1004 Lab Manual
Spring 2009 Project Configurations
This page is still under construction. When done, this page will contain pictures of the Spring 2009 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.
Bomb Disarming Robot (BDR)
Search & Recovery Robot (SRR)
Disaster Relief Robot (DRR)