Fall 2009 Project Configurations
From EG1004 Lab Manual
Revision as of 03:00, 22 September 2009 by Admin (talk | contribs) (Protected "Fall 2009 Project Configurations" [edit=sysop:move=sysop])
Displayed below are pictures of the Fall 2009 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.