Summer 2009 Project Configurations
From EG1004 Lab Manual
Revision as of 20:49, 22 July 2009 by Admin (talk | contribs) (Spring 2009 Project Configurations moved to Summer 2009 Project Configurations)
Spring 2009 Project Configurations
Displayed below are pictures of the Spring 2009 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.
Bomb Disarming Robot (BDR)
Search & Recovery Robot (SRR)
Disaster Relief Robot (DRR)