Difference between revisions of "Template:SLDP: Milestone 2 (BMArduino)"
From EG1004 Lab Manual
(Created page with "== Milestone 2 == Using a CADing software, prepare four views of the latest design: front, top, most detailed side, and an isometric drawing. Also, create a drawing of the gea...") |
m (→Milestone 2) |
||
Line 1: | Line 1: | ||
== Milestone 2 == | == Milestone 2 == | ||
'''See [[Media:Eg_milestones.pptx|How To Give a Milestone Presentation]] for the format of a Milestone presentation. | '''See [[Media:Eg_milestones.pptx|How To Give a Milestone Presentation]] for the format of a Milestone presentation. | ||
Line 10: | Line 7: | ||
** Project description | ** Project description | ||
** Design approach | ** Design approach | ||
** Mission statement | |||
** Design changes since Milestone 1 | ** Design changes since Milestone 1 | ||
** CAD drawings: top, front, most detailed side, isometric | |||
** CAD drawings: top, front, most detailed side, isometric | ** Arduino program (previous and current). What changes were made? | ||
** | |||
** Cost estimate (previous and current). What changes were made? | ** Cost estimate (previous and current). What changes were made? | ||
** | ** Microsoft Project schedule (previous and current). What changes were made? | ||
** Progress update: current state of the project (time, budget, etc.) | ** Progress update: current state of the project (time, budget, etc.) | ||
<b>Look Ahead: What tasks are planned between now and Milestone 3?</b> |
Revision as of 22:33, 9 January 2020
Milestone 2
See How To Give a Milestone Presentation for the format of a Milestone presentation.
Milestone 2 Deliverables:
- Presentation:
- Project description
- Design approach
- Mission statement
- Design changes since Milestone 1
- CAD drawings: top, front, most detailed side, isometric
- Arduino program (previous and current). What changes were made?
- Cost estimate (previous and current). What changes were made?
- Microsoft Project schedule (previous and current). What changes were made?
- Progress update: current state of the project (time, budget, etc.)
Look Ahead: What tasks are planned between now and Milestone 3?