Difference between revisions of "Summer 2009 Project Configurations"
From EG1004 Lab Manual
m (Protected "Spring 2009 Project Configurations" [edit=sysop:move=sysop]) |
|
(No difference)
|
Revision as of 20:49, 22 July 2009
Spring 2009 Project Configurations
Displayed below are pictures of the Spring 2009 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.
Bomb Disarming Robot (BDR)
Search & Recovery Robot (SRR)
Disaster Relief Robot (DRR)