Difference between revisions of "Summer 2009 Project Configurations"
From EG1004 Lab Manual
Line 1: | Line 1: | ||
<h1>Spring 2009 Project Configurations</h1> | <h1>Spring 2009 Project Configurations</h1> | ||
<p> | <p>Displayed below are pictures of the Spring 2009 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.</p> | ||
<h2>Bomb Disarming Robot (BDR)</h2> | <h2>Bomb Disarming Robot (BDR)</h2> |
Revision as of 05:47, 30 January 2009
Spring 2009 Project Configurations
Displayed below are pictures of the Spring 2009 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.
Bomb Disarming Robot (BDR)
Search & Recovery Robot (SRR)
Disaster Relief Robot (DRR)