Difference between revisions of "Spring 2010 Project Configurations"
From EG1004 Lab Manual
m (Summer 2010 Project Configurations moved to Spring 2010 Project Configurations: revert) |
|
(No difference)
|
Revision as of 22:38, 14 July 2010
Displayed below are pictures of the Spring 2010 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.