Difference between revisions of "Spring 2010 Project Configurations"
From EG1004 Lab Manual
Line 1: | Line 1: | ||
Displayed below are pictures of the | Displayed below are pictures of the Spring 2010 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects. | ||
== Bomb Disarming Robot (BDR) == | == Bomb Disarming Robot (BDR) == |
Revision as of 21:15, 18 February 2010
Displayed below are pictures of the Spring 2010 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.