Difference between revisions of "Fall 2009 Project Configurations"
From EG1004 Lab Manual
m (Protected "Fall 2009 Project Configurations" [edit=sysop:move=sysop]) |
|
(No difference)
|
Revision as of 03:00, 22 September 2009
Displayed below are pictures of the Fall 2009 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.