== Milestone 3 ==
== Milestone 3 ==
Using MLCad or Lego Digital Designer, prepare four views of your latest design: front, top, most detailed side, and an isometric drawing. Also, provide a drawing of your gear trains. Complete your latest Mindstorms program and your latest MS Project plan reflecting any schedule changes. Finally, calculate a revised cost estimate.
Using MLCad or Lego Digital Designer, prepare four views of the latest design: front, top, most detailed side, and an isometric drawing. Also, provide a drawing of the gear trains. Complete the latest Mindstorms program and the latest MS Project plan reflecting any schedule changes. Finally, calculate a revised cost estimate.


'''''Look ahead''': What tasks do you plan between now and the completion of the project?''
'''''Look ahead''': What tasks are planned between now and the completion of the project?''


'''Milestone 3 Deliverables''':
'''Milestone 3 Deliverables''':

Revision as of 22:38, 8 September 2014

Milestone 3

Using MLCad or Lego Digital Designer, prepare four views of the latest design: front, top, most detailed side, and an isometric drawing. Also, provide a drawing of the gear trains. Complete the latest Mindstorms program and the latest MS Project plan reflecting any schedule changes. Finally, calculate a revised cost estimate.

Look ahead: What tasks are planned between now and the completion of the project?

Milestone 3 Deliverables:

  • Presentation:
    • Project description
    • Design approach
    • Design changes since Milestone 2
    • Mission statement
    • CAD drawings: top, front, most detailed side, isometric, gear train
    • Mindstorms program
    • Cost estimate (previous and current). What changes were made?
    • MS Project schedule (previous and current). What changes were made?
    • Progress update: current state of the project (time, budget, etc.)