Difference between revisions of "Template:SLDP: Milestones and Benchmarks"

From EG1004 Lab Manual
Jump to: navigation, search
Line 14: Line 14:
*Relevant Pictures
*Relevant Pictures


<b>The DFR is due by Benchmark A.</b> Do not forget to include the items listed above. Use this link to access the [https://docs.google.com/document/d/15YI7-2Ca17EkAtsqrFwR6ZgStSUpkO9tbKHWVtxQp9g/edit DFR Rubric].
<b>The DFR is due by Benchmark A. The report needs to be approved by an Open Lab TA to complete Benchmark A</b> Do not forget to include the items listed above. Use this link to access the [https://docs.google.com/document/d/15YI7-2Ca17EkAtsqrFwR6ZgStSUpkO9tbKHWVtxQp9g/edit DFR Rubric].

Revision as of 16:43, 14 July 2020

Milestones, Benchmarks, and Deliverables

As you work on your project, you will be required to present periodic reports on your progress. We call these Milestones. All the items assigned in each Milestone are called deliverables. These deliverables often consist of a combination of written submissions, presentations, and demonstrations.

Design & Feasibility Report

The Design and Feasibility Report (DFR) is extremely important, as it lays the groundwork for your project. You will be outlining your project idea, inspiration, and goals.

The DFR must include:

  • Cover Page
  • Project Overview
  • Goals & Objectives
  • Design & Approach
  • Cost Estimate
  • Project Schedule
  • Relevant Pictures

The DFR is due by Benchmark A. The report needs to be approved by an Open Lab TA to complete Benchmark A Do not forget to include the items listed above. Use this link to access the DFR Rubric.