Difference between revisions of "Template:SLDP: Milestone 3 (Robots)"

From EG1004 Lab Manual
Jump to: navigation, search
(Created page with "== Milestone 3 == Using MLCad or Lego Digital Designer, prepare four views of your latest design: front, top, most detailed side, and an isometric drawing. Also, provide a drawin…")
 
 
(7 intermediate revisions by 4 users not shown)
Line 1: Line 1:
== Milestone 3 ==
== Milestone 3 ==
Using MLCad or Lego Digital Designer, prepare four views of your latest design: front, top, most detailed side, and an isometric drawing. Also, provide a drawing of your gear trains. Complete your latest Mindstorms program and your latest MS Project plan reflecting any schedule changes. Finally, calculate a revised cost estimate.


'''''Look ahead''': What tasks do you plan between now and the completion of the project?''
'''<span style="color: red;">See [[Media:Eg_milestones.pptx|How To Give a Milestone Presentation]] for the format of a Milestone presentation.</span>'''


'''Milestone 3 Deliverables''':
'''Milestone 3 Deliverables''':
Line 12: Line 11:
** CAD drawings: top, front, most detailed side, isometric, gear train
** CAD drawings: top, front, most detailed side, isometric, gear train
** Mindstorms program
** Mindstorms program
** Cost estimate (previous and current). What changes were made?
** Updated cost estimate (previous and current). What changes were made?
** MS Project schedule (previous and current). What changes were made?
** Updated Microsoft Project schedule (previous and current). What changes were made?
** Progress update: current state of the project (time, budget, etc.)
** Progress update: current state of the project (time, budget, etc.)
<b>Look ahead: What tasks are planned between now and the completion of the project?</b>

Latest revision as of 01:48, 8 January 2020

Milestone 3

See How To Give a Milestone Presentation for the format of a Milestone presentation.

Milestone 3 Deliverables:

  • Presentation:
    • Project description
    • Design approach
    • Design changes since Milestone 2
    • Mission statement
    • CAD drawings: top, front, most detailed side, isometric, gear train
    • Mindstorms program
    • Updated cost estimate (previous and current). What changes were made?
    • Updated Microsoft Project schedule (previous and current). What changes were made?
    • Progress update: current state of the project (time, budget, etc.)

Look ahead: What tasks are planned between now and the completion of the project?