Difference between revisions of "Summer 2009 Project Configurations"
From EG1004 Lab Manual
m (10 revisions) |
|||
(4 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
{{Outdated}} | |||
<p>Displayed below are pictures of the Spring 2009 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.</p> | <p>Displayed below are pictures of the Spring 2009 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.</p> | ||
Line 24: | Line 24: | ||
<p><center>[[Image:Sp09RDS.gif]]</center></p> | <p><center>[[Image:Sp09RDS.gif]]</center></p> | ||
<p class="caption">Course Overview</p> | <p class="caption">Course Overview</p> | ||
{{Outdated}} |
Latest revision as of 03:09, 11 July 2011
This page's accuracy may be compromised because of out-of-date information. The information displayed on this page has been deprecated and is kept for historical purposes only. There may or may not be information relevant to the current course curriculum. |
Displayed below are pictures of the Spring 2009 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.
Bomb Disarming Robot (BDR)
Search & Recovery Robot (SRR)
Disaster Relief Robot (DRR)
Retrieval and Delivery System (RDS)
This page's accuracy may be compromised because of out-of-date information. The information displayed on this page has been deprecated and is kept for historical purposes only. There may or may not be information relevant to the current course curriculum. |