== Milestone 3 == | == Milestone 3 == | ||
Using Lego Digital Designer, prepare four views of the latest design: front, top, most detailed side, and an isometric drawing. Also, provide a drawing of the gear trains. Complete the latest Mindstorms program and the latest MS Project plan reflecting any schedule changes. Finally, calculate a revised cost estimate. | Using Lego Digital Designer, prepare four views of the latest design: front, top, most detailed side, and an isometric drawing. Also, provide a drawing of the gear trains. Complete the latest Mindstorms program and the latest MS Project plan reflecting any schedule changes. Finally, calculate a revised cost estimate. | ||
'''Milestone 3 Deliverables''': | '''Milestone 3 Deliverables''': | ||
Line 17: | Line 13: | ||
** MS Project schedule (previous and current). What changes were made? | ** MS Project schedule (previous and current). What changes were made? | ||
** Progress update: current state of the project (time, budget, etc.) | ** Progress update: current state of the project (time, budget, etc.) | ||
<b>Look ahead: What tasks are planned between now and the completion of the project?</b> | |||
'''See [[Media:Eg_milestones.pptx|How To Give a Milestone Presentation]] for the format of a Milestone presentation. |
Revision as of 01:44, 8 January 2020
Milestone 3
Using Lego Digital Designer, prepare four views of the latest design: front, top, most detailed side, and an isometric drawing. Also, provide a drawing of the gear trains. Complete the latest Mindstorms program and the latest MS Project plan reflecting any schedule changes. Finally, calculate a revised cost estimate.
Milestone 3 Deliverables:
- Presentation:
- Project description
- Design approach
- Design changes since Milestone 2
- Mission statement
- CAD drawings: top, front, most detailed side, isometric, gear train
- Mindstorms program
- Cost estimate (previous and current). What changes were made?
- MS Project schedule (previous and current). What changes were made?
- Progress update: current state of the project (time, budget, etc.)
Look ahead: What tasks are planned between now and the completion of the project?
See How To Give a Milestone Presentation for the format of a Milestone presentation.