Difference between revisions of "Fall 2008 Project Configurations"
From EG1004 Lab Manual
m (4 revisions) |
|
(No difference)
|
Revision as of 20:30, 16 June 2009
Fall 2008 Project Configurations
This page is still under construction. When done, this page will contain pictures of the Fall 2008 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Modular Retrieval and Delivery System Semester-Long Design Projects.
Bomb Disarming Robot (BDR)
Search & Recovery Robot (SRR)
Disaster Relief Robot (DRR)