Difference between revisions of "EG Grading Policy"
From EG1004 Lab Manual
Line 1: | Line 1: | ||
<h1>EG1004 Grading Policy</h1> | |||
<h2>Starting Summer 2005 Term</h2> | |||
<h1 | |||
<h2 | |||
<table border=1 cellspacing=0> | <table border=1 cellspacing=0> | ||
<tr> | <tr><td><b>Item</b></td><td><b>% of grade</b></td></tr> | ||
<td | <tr><td>Teaching Assistant Lab Report Grades (technical content)</td><td>15%</td></tr> | ||
<tr><td>Writing Consultant Lab Report Grades (style and grammar)</td><td>10%</td></tr> | |||
<tr><td>Lab Quizzes</td><td>10%</td></tr> | |||
<td | <tr><td>Recitation Presentations</td><td>15%</td></tr> | ||
<tr><td>Semester Long Project (breakdown below)</td><td>30%</td></tr> | |||
<tr><td>Final exam</td><td>20%</td></tr> | |||
<tr><td>Semester Long Project Bonuses and Penalties</td><td>Shown below</td></tr> | |||
<tr> | |||
<td | |||
<td | |||
<tr> | |||
<td | |||
<td | |||
<tr> | |||
<td | |||
<td | |||
<tr> | |||
<td | |||
<td | |||
<tr> | |||
<td | |||
<td | |||
<tr> | |||
<td | |||
<td | |||
<tr> | |||
<td | |||
<td | |||
</table> | </table> | ||
<h3 | <h3>Semester Long Project Breakdown</h3> | ||
<table border=1 cellspacing=0> | <table border=1 cellspacing=0> | ||
<tr> | <tr><td><b>Item</b></td><td><b>% of grade</b></td></tr> | ||
<td | <tr><td>Milestone 1 presentation</td><td>10%</td></tr> | ||
<tr><td>Milestone 2 presentation</td><td>10%</td></tr> | |||
<tr><td>Milestone 3 presentation</td><td>10%</td></tr> | |||
<td | <tr><td>Final presentation</td><td>45%</td></tr> | ||
<tr><td>Proposal cover letter</td><td>25%</td></tr> | |||
<tr><td>Component testing</td><td>Required</td></tr> | |||
<tr><td>Commissioning</td><td>Required</td></tr> | |||
<tr> | |||
<td | |||
<td | |||
<tr> | |||
<td | |||
<td | |||
<tr> | |||
<td | |||
<td | |||
<tr> | |||
<td | |||
<td | |||
<tr> | |||
<td | |||
<td | |||
<tr> | |||
<td | |||
<td | |||
<tr> | |||
<td | |||
<td | |||
</table> | </table> | ||
<p>Items shown as “Required�? do | <p>Items shown as “Required�? do not have weight in calculating the semester long project grade, | ||
not have weight in calculating the semester long project grade, but must be | but must be successfully completed to receive a grade.</p> | ||
successfully completed to receive a grade.</p> | |||
<h3 | <h3>Semester Long Project Bonuses and Penalties</h3> | ||
<p>The following bonuses and | <p>The following bonuses and penalties will be added to and subtracted from the semester long | ||
penalties will be added to and subtracted from the semester long project:</p> | project:</p> | ||
<table border=1 cellspacing=0> | <table border=1 cellspacing=0> | ||
<tr> | <tr><td><b>Item</b></td><td><b>% bonus or penalty</b></td></tr> | ||
<td | <tr><td>Early submission of project</td><td>+10%</td></tr> | ||
<tr><td>Completion of BDR project (line route)</td><td>+3%</td></tr> | |||
<tr><td>Completion of BDR project (roof route)</td><td>+10%</td></tr> | |||
<td | <tr><td>Completion of BDR project (perimeter route)</td><td>+3%</td></tr> | ||
<tr><td>Completion of BDR project (tunnel route)</td><td>+6%</td></tr> | |||
<tr><td>Completion of BDR project (new route)</td><td>+10%</td></tr> | |||
<tr><td>Retrieval of BDR ball (any route)</td><td>+10%</td></tr> | |||
<tr> | <tr><td>Completion of RDS project</td><td>+10%</td></tr> | ||
<td | <tr><td>Completion of ISAR project</td><td>+10%</td></tr> | ||
<tr><td>Completion of Train Guidance project</td><td>+10%</td></tr> | |||
<tr><td>Completion of Supermarket project</td><td>+3%</td></tr> | |||
<td | <tr><td>Each business day project is late</td><td>-10%, up to -100%</td></tr> | ||
<tr> | |||
<td | |||
<td | |||
<tr> | |||
<td | |||
<td | |||
<tr> | |||
<td | |||
<td | |||
<tr> | |||
<td | |||
<td | |||
<tr> | |||
<td | |||
<td | |||
<tr> | |||
<td | |||
<td | |||
<tr> | |||
<td | |||
<td | |||
<tr> | |||
<td | |||
<td | |||
<tr> | |||
<td | |||
<td | |||
<tr> | |||
<td | |||
<td | |||
<tr> | |||
<td | |||
<td | |||
</table> | </table> | ||
<p>The project is due the day of | <p>The project is due the day of the final presentation. The project is considered late after | ||
the final presentation. The project is considered late after that time. Note | that time. Note that after 10 business days, the project grade will be a zero.</p> | ||
that after 10 business days, the project grade will be a zero.</p> | |||
<p>For example, if you do an early | <p>For example, if you do an early submission of a BDR that uses the tunnel and the project is | ||
submission of a BDR that uses the tunnel and the project is scored as an 80, | scored as an 80, your semester long project grade will be 80(the base)+10(early submission)+6(tunnel | ||
your semester long project grade will be 80(the base)+10(early | route), for a total grade of 96.</p> | ||
submission)+6(tunnel route), for a total grade of 96.</p> |
Revision as of 15:29, 19 May 2005
EG1004 Grading Policy
Starting Summer 2005 Term
Item | % of grade |
Teaching Assistant Lab Report Grades (technical content) | 15% |
Writing Consultant Lab Report Grades (style and grammar) | 10% |
Lab Quizzes | 10% |
Recitation Presentations | 15% |
Semester Long Project (breakdown below) | 30% |
Final exam | 20% |
Semester Long Project Bonuses and Penalties | Shown below |
Semester Long Project Breakdown
Item | % of grade |
Milestone 1 presentation | 10% |
Milestone 2 presentation | 10% |
Milestone 3 presentation | 10% |
Final presentation | 45% |
Proposal cover letter | 25% |
Component testing | Required |
Commissioning | Required |
Items shown as “Required�? do not have weight in calculating the semester long project grade, but must be successfully completed to receive a grade.
Semester Long Project Bonuses and Penalties
The following bonuses and penalties will be added to and subtracted from the semester long project:
Item | % bonus or penalty |
Early submission of project | +10% |
Completion of BDR project (line route) | +3% |
Completion of BDR project (roof route) | +10% |
Completion of BDR project (perimeter route) | +3% |
Completion of BDR project (tunnel route) | +6% |
Completion of BDR project (new route) | +10% |
Retrieval of BDR ball (any route) | +10% |
Completion of RDS project | +10% |
Completion of ISAR project | +10% |
Completion of Train Guidance project | +10% |
Completion of Supermarket project | +3% |
Each business day project is late | -10%, up to -100% |
The project is due the day of the final presentation. The project is considered late after that time. Note that after 10 business days, the project grade will be a zero.
For example, if you do an early submission of a BDR that uses the tunnel and the project is scored as an 80, your semester long project grade will be 80(the base)+10(early submission)+6(tunnel route), for a total grade of 96.