Difference between revisions of "EG Grading Policy"

From EG1004 Lab Manual
Jump to: navigation, search
Line 1: Line 1:
<head>
<h1>EG1004 Grading Policy</h1>
<title>EG1004 Grading Policy</title>
 
</head>
<h2>Starting Summer 2005 Term</h2>
<h1 align=center style='margin-top:0in;margin-right:0in;margin-bottom:12.0pt;
margin-left:0in;text-align:center'>EG1004 Grading Policy</h1>
<h2 style='margin-top:0in;margin-right:0in;margin-bottom:12.0pt;margin-left:
0in'>Starting Summer 2005 Term</h2>
<table border=1 cellspacing=0>
<table border=1 cellspacing=0>
<tr>
<tr><td><b>Item</b></td><td><b>% of grade</b></td></tr>
<td>
<tr><td>Teaching Assistant Lab Report Grades (technical content)</td><td>15%</td></tr>
  <p><b>Item</b></p>
<tr><td>Writing Consultant Lab Report Grades (style and grammar)</td><td>10%</td></tr>
  </td>
<tr><td>Lab Quizzes</td><td>10%</td></tr>
<td>
<tr><td>Recitation Presentations</td><td>15%</td></tr>
  <p><b>% of grade</b></p>
<tr><td>Semester Long Project (breakdown below)</td><td>30%</td></tr>
  </td>
<tr><td>Final exam</td><td>20%</td></tr>
</tr>
<tr><td>Semester Long Project Bonuses and Penalties</td><td>Shown below</td></tr>
<tr>
<td>
  <p>Teaching Assistant Lab Report Grades (technical content)</p>
  </td>
<td>
  <p>15%</p>
  </td>
</tr>
<tr>
<td>
  <p>Writing Consultant Lab Report Grades (style and grammar)</p>
  </td>
<td>
  <p>10%</p>
  </td>
</tr>
<tr>
<td>
  <p>Lab Quizzes</p>
  </td>
<td>
  <p>10%</p>
  </td>
</tr>
<tr>
<td>
  <p>Recitation Presentations</p>
  </td>
<td>
  <p>15%</p>
  </td>
</tr>
<tr>
<td>
  <p>Semester Long Project (breakdown below)</p>
  </td>
<td>
  <p>30%</p>
  </td>
</tr>
<tr>
<td>
  <p>Final exam</p>
  </td>
<td>
  <p>20%</p>
  </td>
</tr>
<tr>
<td>
  <p>Semester Long Project Bonuses and Penalties</p>
  </td>
<td>
  <p>Shown below</p>
  </td>
</tr>
</table>
</table>
<p>&nbsp;</p>
 
<h3 style='margin-top:0in;margin-right:0in;margin-bottom:12.0pt;margin-left:
<h3>Semester Long Project Breakdown</h3>
0in'>Semester Long Project Breakdown</h3>
 
<table border=1 cellspacing=0>
<table border=1 cellspacing=0>
<tr>
<tr><td><b>Item</b></td><td><b>% of grade</b></td></tr>
<td>
<tr><td>Milestone 1 presentation</td><td>10%</td></tr>
  <p><b>Item</b></p>
<tr><td>Milestone 2 presentation</td><td>10%</td></tr>
  </td>
<tr><td>Milestone 3 presentation</td><td>10%</td></tr>
<td>
<tr><td>Final presentation</td><td>45%</td></tr>
  <p><b>% of grade</b></p>
<tr><td>Proposal cover letter</td><td>25%</td></tr>
  </td>
<tr><td>Component testing</td><td>Required</td></tr>
</tr>
<tr><td>Commissioning</td><td>Required</td></tr>
<tr>
<td>
  <p>Milestone 1 presentation</p>
  </td>
<td>
  <p>10%</p>
  </td>
</tr>
<tr>
<td>
  <p>Milestone 2 presentation</p>
  </td>
<td>
  <p>10%</p>
  </td>
</tr>
<tr>
<td>
  <p>Milestone 3 presentation</p>
  </td>
<td>
  <p>10%</p>
  </td>
</tr>
<tr>
<td>
  <p>Final presentation</p>
  </td>
<td>
  <p>45%</p>
  </td>
</tr>
<tr>
<td>
  <p>Proposal cover letter</p>
  </td>
<td>
  <p>25%</p>
  </td>
</tr>
<tr>
<td>
  <p>Component testing</p>
  </td>
<td>
  <p>Required</p>
  </td>
</tr>
<tr>
<td>
  <p>Commissioning</p>
  </td>
<td>
  <p>Required</p>
  </td>
</tr>
</table>
</table>
<p>&nbsp;</p>
 
<p>Items shown as “Required�? do
<p>Items shown as “Required�? do not have weight in calculating the semester long project grade,
not have weight in calculating the semester long project grade, but must be
but must be successfully completed to receive a grade.</p>
successfully completed to receive a grade.</p>
 
<h3 style='margin-top:0in;margin-right:0in;margin-bottom:12.0pt;margin-left:
<h3>Semester Long Project Bonuses and Penalties</h3>
0in'>Semester Long Project Bonuses and Penalties</h3>
 
<p>The following bonuses and
<p>The following bonuses and penalties will be added to and subtracted from the semester long
penalties will be added to and subtracted from the semester long project:</p>
project:</p>
 
<table border=1 cellspacing=0>
<table border=1 cellspacing=0>
<tr>
<tr><td><b>Item</b></td><td><b>% bonus or penalty</b></td></tr>
<td>
<tr><td>Early submission of project</td><td>+10%</td></tr>
  <p><b>Item</b></p>
<tr><td>Completion of BDR project (line route)</td><td>+3%</td></tr>
  </td>
<tr><td>Completion of BDR project (roof route)</td><td>+10%</td></tr>
<td>
<tr><td>Completion of BDR project (perimeter route)</td><td>+3%</td></tr>
  <p><b>% bonus or penalty</b></p>
<tr><td>Completion of BDR project (tunnel route)</td><td>+6%</td></tr>
  </td>
<tr><td>Completion of BDR project (new route)</td><td>+10%</td></tr>
</tr>
<tr><td>Retrieval of BDR ball (any route)</td><td>+10%</td></tr>
<tr>
<tr><td>Completion of RDS project</td><td>+10%</td></tr>
<td>
<tr><td>Completion of ISAR project</td><td>+10%</td></tr>
  <p>Early submission of project</p>
<tr><td>Completion of Train Guidance project</td><td>+10%</td></tr>
  </td>
<tr><td>Completion of Supermarket project</td><td>+3%</td></tr>
<td>
<tr><td>Each business day project is late</td><td>-10%, up to -100%</td></tr>
  <p>+10%</p>
  </td>
</tr>
<tr>
<td>
  <p>Completion of BDR project (line route)</p>
  </td>
<td>
  <p>+3%</p>
  </td>
</tr>
<tr>
<td>
  <p>Completion of BDR project (roof route)</p>
  </td>
<td>
  <p>+10%</p>
  </td>
</tr>
<tr>
<td>
  <p>Completion of BDR project (perimeter route)</p>
  </td>
<td>
  <p>+3%</p>
  </td>
</tr>
<tr>
<td>
  <p>Completion of BDR project (tunnel route)</p>
  </td>
<td>
  <p>+6%</p>
  </td>
</tr>
<tr>
<td>
  <p>Completion of BDR project (new route)</p>
  </td>
<td>
  <p>+10%</p>
  </td>
</tr>
<tr>
<td>
  <p>Retrieval of BDR ball (any route)</p>
  </td>
<td>
  <p>+10%</p>
  </td>
</tr>
<tr>
<td>
  <p>Completion of RDS project</p>
  </td>
<td>
  <p>+10%</p>
  </td>
</tr>
<tr>
<td>
  <p>Completion of ISAR project</p>
  </td>
<td>
  <p>+10%</p>
  </td>
</tr>
<tr>
<td>
  <p>Completion of Train Guidance project</p>
  </td>
<td>
  <p>+10%</p>
  </td>
</tr>
<tr>
<td>
  <p>Completion of Supermarket project</p>
  </td>
<td>
  <p>+3%</p>
  </td>
</tr>
<tr>
<td>
  <p>Each business day project is late</p>
  </td>
<td>
  <p>-10%, up to -100%</p>
  </td>
</tr>
</table>
</table>
<p>&nbsp;</p>
 
<p>The project is due the day of
<p>The project is due the day of the final presentation. The project is considered late after
the final presentation. The project is considered late after that time. Note
that time. Note that after 10 business days, the project grade will be a zero.</p>
that after 10 business days, the project grade will be a zero.</p>
 
<p>For example, if you do an early
<p>For example, if you do an early submission of a BDR that uses the tunnel and the project is
submission of a BDR that uses the tunnel and the project is scored as an 80,
scored as an 80, your semester long project grade will be 80(the base)+10(early submission)+6(tunnel
your semester long project grade will be 80(the base)+10(early
route), for a total grade of 96.</p>
submission)+6(tunnel route), for a total grade of 96.</p>

Revision as of 15:29, 19 May 2005

EG1004 Grading Policy

Starting Summer 2005 Term

Item% of grade
Teaching Assistant Lab Report Grades (technical content)15%
Writing Consultant Lab Report Grades (style and grammar)10%
Lab Quizzes10%
Recitation Presentations15%
Semester Long Project (breakdown below)30%
Final exam20%
Semester Long Project Bonuses and PenaltiesShown below

Semester Long Project Breakdown

Item% of grade
Milestone 1 presentation10%
Milestone 2 presentation10%
Milestone 3 presentation10%
Final presentation45%
Proposal cover letter25%
Component testingRequired
CommissioningRequired

Items shown as “Required�? do not have weight in calculating the semester long project grade, but must be successfully completed to receive a grade.

Semester Long Project Bonuses and Penalties

The following bonuses and penalties will be added to and subtracted from the semester long project:

Item% bonus or penalty
Early submission of project+10%
Completion of BDR project (line route)+3%
Completion of BDR project (roof route)+10%
Completion of BDR project (perimeter route)+3%
Completion of BDR project (tunnel route)+6%
Completion of BDR project (new route)+10%
Retrieval of BDR ball (any route)+10%
Completion of RDS project+10%
Completion of ISAR project+10%
Completion of Train Guidance project+10%
Completion of Supermarket project+3%
Each business day project is late-10%, up to -100%

The project is due the day of the final presentation. The project is considered late after that time. Note that after 10 business days, the project grade will be a zero.