Difference between revisions of "Summer 2010 Project Configurations"
From EG1004 Lab Manual
(Summer 2010 Update) |
m (4 revisions) |
||
(2 intermediate revisions by the same user not shown) | |||
Line 1: | Line 1: | ||
Displayed below are pictures of the | Displayed below are pictures of the Summer 2010 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects. | ||
== Bomb Disarming Robot (BDR) == | == Bomb Disarming Robot (BDR) == |
Latest revision as of 03:09, 11 July 2011
Displayed below are pictures of the Summer 2010 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.