Difference between revisions of "Summer 2009 Project Configurations"

From EG1004 Lab Manual
Jump to: navigation, search
(Added Template:Outdated)
m (10 revisions)
 
(2 intermediate revisions by the same user not shown)
Line 1: Line 1:
{{Outdated|project|date=September 2008}}
{{Outdated}}


<p>Displayed below are pictures of the Spring 2009 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.</p>
<p>Displayed below are pictures of the Spring 2009 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.</p>
Line 25: Line 25:
<p class="caption">Course Overview</p>
<p class="caption">Course Overview</p>


{{Outdated|project|date=September 2008}}
{{Outdated}}

Latest revision as of 03:09, 11 July 2011

Displayed below are pictures of the Spring 2009 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.

Bomb Disarming Robot (BDR)

Sp09BDR1.gif

Course Overview


Sp09BDR2.gif

Location of Decoy Bomb in Black Tunnel


Search & Recovery Robot (SRR)

Sp09SRR1.gif

Course Overview


Sp09SRR2.gif

Location of Quest(Joint Airlock)


Disaster Relief Robot (DRR)

Sp09DRR.gif

Course Overview


Retrieval and Delivery System (RDS)

Sp09RDS.gif

Course Overview