Difference between revisions of "Spring 2010 Project Configurations"
From EG1004 Lab Manual
m (10 revisions) |
|
(4 intermediate revisions by the same user not shown) | |
(No difference)
|
Latest revision as of 03:09, 11 July 2011
Displayed below are pictures of the Spring 2010 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.