Template: SLDP: Milestone 2 (BMArduino)

From EG1004 Lab Manual
Revision as of 20:09, 13 June 2019 by Kdunnigan (talk | contribs) (Created page with "== Milestone 2 == Using a CADing software, prepare four views of the latest design: front, top, most detailed side, and an isometric drawing. Also, create a drawing of the gea...")
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Milestone 2

Using a CADing software, prepare four views of the latest design: front, top, most detailed side, and an isometric drawing. Also, create a drawing of the gear trains. Complete the latest Mindstorms program and the latest MS Project plan reflecting any schedule changes. Finally, calculate a revised cost estimate.

Look Ahead: What tasks are planned between now and Milestone 3?

See How To Give a Milestone Presentation for the format of a Milestone presentation.

Milestone 2 Deliverables:

  • Presentation:
    • Project description
    • Design approach
    • Design changes since Milestone 1
    • Mission statement
    • CAD drawings: top, front, most detailed side, isometric, gear train
    • Mindstorms program
    • Cost estimate (previous and current). What changes were made?
    • MS Project schedule (previous and current). What changes were made?
    • Progress update: current state of the project (time, budget, etc.)