Difference between revisions of "Template:SLDP: Milestone 1 (Robots)"

From EG1004 Lab Manual
Jump to: navigation, search
 
(12 intermediate revisions by 6 users not shown)
Line 1: Line 1:
== Milestone 1 ==
== Milestone 1 ==
Prepare a preliminary sketch of the design, a cost estimate, and an MS Project plan.


'''''Look Ahead'': What tasks are planned between now and Milestone 2?'''
'''<span style="color: red;">See [[Media:Eg_milestones.pptx|How To Give a Milestone Presentation]] for the format of a Milestone presentation.</span>'''


'''''See [[Media:Eg_milestones.pptx|How To Give a Milestone Presentation]] for the format of a Milestone presentation.'"
Milestone 1 is a presentation of the PDI. It is important that it outlines the project goals and show that the project is realizable.  


'''Milestone 1 Deliverables''':
The Milestone 1 presentation must include:
* Presentation:
* Company profile
** Project description
** Company name
** Design approach
** Product name
** Company officer title(s)
** Mission statement
** Mission statement
** Preliminary CAD drawing of robot
* Project objective
** Cost estimate
** What is the project about?
** MS Project schedule
** What tasks is the company aiming to accomplish? (Benchmark A requirements)
** Progress update: current state of the project
** Overall design approach to complete objective
* Background information
** Why is the project happening?
** What does the audience need to know?
* Technical design description
** Preliminary conceptual drawing of robot design
*** Rendered and digital sketches are acceptable, CAD not required
** What components will be used and why?
* Cost estimate
** Major components of design listed
** Miscellaneous category listed
** Projected labor listed
* Microsoft Project schedule
** Click [https://nyu.service-now.com/sp?id=kb_article&sysparm_article=KB0018302&sys_kb_id=b996a7281b6210906441c8c11a4bcbce&spa=1| here] to access the guide on how to transfer a file
* Teamwork agreement summary
* Summary
** Overall assessment on current state of project
** Is the project on schedule? Is it on budget?
** Next steps and future tasks
 
 
<b>Look Ahead: What tasks are planned between now and Milestone 2?</b>

Latest revision as of 18:10, 4 September 2023

Milestone 1

See How To Give a Milestone Presentation for the format of a Milestone presentation.

Milestone 1 is a presentation of the PDI. It is important that it outlines the project goals and show that the project is realizable.

The Milestone 1 presentation must include:

  • Company profile
    • Company name
    • Product name
    • Company officer title(s)
    • Mission statement
  • Project objective
    • What is the project about?
    • What tasks is the company aiming to accomplish? (Benchmark A requirements)
    • Overall design approach to complete objective
  • Background information
    • Why is the project happening?
    • What does the audience need to know?
  • Technical design description
    • Preliminary conceptual drawing of robot design
      • Rendered and digital sketches are acceptable, CAD not required
    • What components will be used and why?
  • Cost estimate
    • Major components of design listed
    • Miscellaneous category listed
    • Projected labor listed
  • Microsoft Project schedule
    • Click here to access the guide on how to transfer a file
  • Teamwork agreement summary
  • Summary
    • Overall assessment on current state of project
    • Is the project on schedule? Is it on budget?
    • Next steps and future tasks


Look Ahead: What tasks are planned between now and Milestone 2?