Difference between revisions of "Spring 2012 Project Configurations"

From EG1004 Lab Manual
Jump to: navigation, search
 
(One intermediate revision by the same user not shown)
Line 23: Line 23:
[[Image:Sp12DRR1.jpg|thumb|left|650px|Course Overview]]
[[Image:Sp12DRR1.jpg|thumb|left|650px|Course Overview]]
[[Image:Sp12DRR2.jpg|thumb|right|650px|Course Overview]]
[[Image:Sp12DRR2.jpg|thumb|right|650px|Course Overview]]
=== DRR Issues ===
* Course Overview #2 picture is blurry
* Loose wall on 2nd level is not loose
* Red can off its mark
** Retake both Course Overview photos
<br style="clear: both;" />
<br style="clear: both;" />


Line 33: Line 28:
[[Image:Sp12RDS1.jpg|thumb|left|650px|Course Overview]]
[[Image:Sp12RDS1.jpg|thumb|left|650px|Course Overview]]
[[Image:Sp12RDS2.jpg|thumb|right|650px|Course Overview]]
[[Image:Sp12RDS2.jpg|thumb|right|650px|Course Overview]]
=== RDS Issues ===
* Hospitals should be empty.
* Some bottle caps missing ping pong balls.
** Retake both Course Overview photos
<br style="clear: both;" />
<br style="clear: both;" />


{{Semester-Long Design Project}}
{{Semester-Long Design Project}}

Latest revision as of 04:44, 4 February 2012

Displayed below are pictures of the Spring 2012 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.

Bomb Disarming Robot (BDR)

Course Overview of Day Version
Location of Decoy Bomb in Tunnel
Disarm Button


Course Overview of Night Version
Location of Decoy Bomb in Tunnel
Disarm Button


Search & Recovery Robot (SRR)

Course Overview
Location of Zarya (Power Supply)
Location of Unity (Node 1)
Course Overview
Location of Quest (Joint Airlock)
Location of Pirs (Docking Compartment)


Disaster Relief Robot (DRR)

Course Overview
Course Overview


Retrieval and Delivery System (RDS)

Course Overview
Course Overview