Difference between revisions of "Spring 2012 Project Configurations"

From EG1004 Lab Manual
Jump to: navigation, search
 
(10 intermediate revisions by the same user not shown)
Line 1: Line 1:
Displayed below are pictures of the Fall 2011 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.
Displayed below are pictures of the Spring 2012 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.


== Bomb Disarming Robot (BDR) ==
== Bomb Disarming Robot (BDR) ==

Latest revision as of 04:44, 4 February 2012

Displayed below are pictures of the Spring 2012 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Retrieval and Delivery System Semester-Long Design Projects.

Bomb Disarming Robot (BDR)

Course Overview of Day Version
Location of Decoy Bomb in Tunnel
Disarm Button


Course Overview of Night Version
Location of Decoy Bomb in Tunnel
Disarm Button


Search & Recovery Robot (SRR)

Course Overview
Location of Zarya (Power Supply)
Location of Unity (Node 1)
Course Overview
Location of Quest (Joint Airlock)
Location of Pirs (Docking Compartment)


Disaster Relief Robot (DRR)

Course Overview
Course Overview


Retrieval and Delivery System (RDS)

Course Overview
Course Overview