Difference between revisions of "Fall 2008 Project Configurations"

From EG1004 Lab Manual
Jump to: navigation, search
 
Line 1: Line 1:
<h1>Fall 2008 Project Configurations</h1>
<h1>Fall 2008 Project Configurations</h1>
<p>This page is still under construction.  When done, this page will contain pictures of the Fall 2008 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Modular Retrieval and Delivery System Semester-Long Design Projects.


<h2>Bomb Disarming Robot (BDR)</h2>
<h2>Bomb Disarming Robot (BDR)</h2>

Revision as of 00:28, 30 September 2008

Fall 2008 Project Configurations

This page is still under construction. When done, this page will contain pictures of the Fall 2008 configurations of the Bomb Disarming Robot, Search & Recovery Robot, Disaster Relief Robot, and Modular Retrieval and Delivery System Semester-Long Design Projects.

Bomb Disarming Robot (BDR)

Search & Recovery Robot (SRR)

Disaster Relief Robot (DRR)

Modular Retrieval and Delivery System (MRDS)